Residential UES: Smart Plug Power Strips Josh Rushton Regional Technical Forum Aug 18, 2015.

Slides:



Advertisements
Similar presentations
Residential Refrigerators and Freezers UES Measure Update Regional Technical Forum October 14, 2014.
Advertisements

Direction on Guidelines Savings Definition Path Results of straw vote and proposed decisions for elements of the savings definition Regional Technical.
D EEMED M EASURE R EVIEW P ROJECT Final Report December 7, 2010 Regional Technical Forum Presented by: Michael Baker.
Residential LED UES Measure Update Regional Technical Forum August 20, 2013.
Commercial Tank Water Heaters Out-of-Compliance (OOC) UES Measure Recommendation Regional Technical Forum November 19, 2013.
Heat Pump Water Heaters Provisional UES Proposal Regional Technical Forum October 4 th, 2011.
Grocery Measure: LEDs for Reach-In Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Manufactured Homes Calibration: Existing and New Homes Mohit Singh-Chhabra & Josh Rushton RTF Update March 17, 2015.
Industrial Pump Motor VFDs: Provisional Standard Protocol Christian Douglass Regional Technical Forum 5/12/2015.
Manufactured Homes Calibration: Existing and New Homes Mohit Singh-Chhabra & Josh Rushton RTF Update May 12, 2015.
Commercial Showerhead UES Measure Update Regional Technical Forum Staff Update June 18, 2013.
Research Strategy Review: Heat Pump Water Heaters Thermostatic Restriction Valves Jennifer Anziano RTF R&E Subcommittee July 8, 2015.
Heat Pump Water Heater (HPWH) Subcommittee Christian Douglass Regional Technical Forum June 18, 2015.
Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
Advanced Power Strips (APS) Planning UES Measure Proposal Regional Technical Forum August 20, 2013.
Implementer’s Group April 2015 Meeting Debrief and Upcoming Meeting Prep April 24, 2015.
Retrofit Doors to Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
EvergreenEcon.com Heat Pump Water Heater Model Validation, Market Progress Assessment, and Process Evaluation RTF HPWH Sub-Committee Meeting October 15,
Residential UES: Smart Plug Power Strips Josh Rushton Regional Technical Forum Aug 18, 2015.
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Advanced Power Strips (APS) Planning UES Measure Proposal Measure Proposal Presentation to the.
Provisional Protocol and Research Plan: Non-Residential Lighting Retrofits Nonresidential Lighting Subcommittee November 6, 2014.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Overview of the Regional Technical Forum Guidelines January 22, 2013.
Non-Residential Network Computer Power Management UES Measure Update Regional Technical Forum July 16, 2013.
Pre-Rinse Spray Valve Small Saver UES Measures Regional Technical Forum September 17, 2013.
Julianna Ferrari. Standby energy drain accounts for anywhere from 5 to 10 percent of an average home's annual power usage. Around $4 billion in wasted.
DHP for Houses with Electric FAF Research Plan: Revisions Adam Hadley, Ben Hannas, Bob Davis, My Ton R&E Subcommittee February 25, 2015.
Agricultural Irrigation Pump Variable Frequency Drive Provisional Standard Protocol Proposal Regional Technical Forum April 16, 2013.
Out-Of-Compliance Grocery UES Measure Recommendations Regional Technical Forum March 18, 2014.
Commercial Showerhead UES Measure Update Regional Technical Forum Staff Update June 18, 2013.
Delivery Verification Jennifer Anziano Regional Technical Forum March 17, 2015.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Smart Power Strips in Commercial Office Applications RTF October 4, 2011.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
Anti-Sweat Heater Control Small Saver UES Measure Regional Technical Forum September 17, 2013.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
Network PC Power Management RTF May 4, Network PC Power Management What it is –Control of a networked computer's advanced energy management systems.
N ETWORK PC P OWER M ANAGEMENT June 28, 2011 Regional Technical Forum Presented by: Bob Tingleff SBW Consulting, Inc.
Path for Multi-Family (MF) Weatherization and NC Measures Christian Douglass 8/18/2015.
SEEM Calibration: Phase II Single Family Heating Energy Regional Technical Forum September 17, 2013 Presented By: Josh Rushton and Adam Hadley Subcommittee.
SEEM Calibration: Phase II Single Family Heating Energy Regional Technical Forum August 20, 2013 Presented By: Josh Rushton and Adam Hadley Subcommittee.
Commercial Showerhead UES Measure Update Regional Technical Forum April 16, 2013.
Research Strategy Review: Advanced Power Strips MH HVAC Related Measures Jennifer Anziano RTF R&E Subcommittee August 6, 2015.
Integration Issues for RTF Guidelines: Savings, Lifetimes and Cost/Benefit October 24, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
Implementer’s Group July 2015 RTF Meeting Debrief and Upcoming Meeting Prep July 29, 2015.
Advanced Power Strips IR-Sensing, Home Entertainment Provisional UES Josh Rushton Research and Evaluation Subcommittee September 22, 2015.
RTF Residential Lighting Subcommittee Tuesday, March 4, 11am – 12:30pm 1.
Multifamily Homes: Calibration Update Regional Technical Forum December 8 th, 2015.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Smart Power Strips in Commercial Office Applications RTF August 30, 2011.
Residential Showerheads UES Update Ryan Firestone Regional Technical Forum October 20, 2015.
Regional Technical Forum Recommissioning commercial retail facilities: A whole building approach to energy savings April 7th, 2009 Presented by: Jeremy.
D EEMED M EASURE U PDATES May 3, 2011 Regional Technical Forum Presented by: Bob Tingleff SBW Consulting, Inc.
RTF Management Updates Jennifer Light Regional Technical Forum January 21, 2016.
Planning UES Measures: Prescriptive Duct Sealing SF Performance-based Duct Sealing SF Performance-based Duct Sealing MH Adam Hadley & Josh Rushton Regional.
RTF Management Update Jennifer Anziano Regional Technical Forum July 21, 2015.
Proposed Edits to the Air Source Heat Pump Specifications Regional Technical Forum August 20, 2013.
Non-Residential Network Computer Power Management Christian Douglass Regional Technical Forum January 21, 2016.
Non-Proven Residential Duct Sealing Measures: Research Strategy Josh Rushton and Adam Hadley Research and Evaluation Subcommittee October 7, 2015.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Direct Mail CFLs Ryan Firestone and Carrie Nelson August 30, 2011.
Residential Single Family Clothes Washer UES Measure Update Regional Technical Forum September 16, 2014.
Exterior LED Area Lights
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
Commercial Efficient Tank Water Heater UES Measure Update Regional Technical Forum December 17, 2013.
Residential Behavior-based Programs Measure Development Update Ryan Firestone Regional Technical Forum March 15, 2016.
RTF’s Engagement with Research Jennifer Light RTF Policy Advisory Committee February 19, 2016.
IR-sensing Advanced Power Strips; Weatherization for Existing Multi-family homes Research and Evaluation Subcommittee Josh Rushton March 4, 2016.
Ductless Heat Pumps (DHP) in Single Family Homes with Zonal Electric Heat UES Measure Update Regional Technical Forum June 17, 2014.
Research Strategy: Residential Ductless Heat Pumps Research and Evaluation Subcommittee Christian Douglass and Josh Rushton January 8, 2016.
Presentation transcript:

Residential UES: Smart Plug Power Strips Josh Rushton Regional Technical Forum Aug 18, 2015

Objectives Seeking RTF decision on updates to Residential Smart Plug Power Strips UES measure. Review Research Strategy Approve as Planning measure with extended sunset date 2

Measure Background August, 2013: RTF approved the measure (Planning category) with a detailed Research PlanResearch Plan August, 2015: ETO has some research in the pipeline – Applies to IR-sensing APS in home entertainment settings – Results expected Q1, 2016 – Staff believes the ETO work justifies Provisional category for IR-sensing APS in workstations Need to document RTF Research Plan; – Mostly point to ETO contractor’s planning memo – Clarify things like adjustments related to delivery channel and persistence Staff plans to move forward with this process immediately – SDG&E “Phase II” pre/post study (IR-sensing home entertainment) may be also be helpful when completed. Today’s main intent is to align the measure with RTF’s current usage of Planning versus Provisional categories – Minor modifications to measure itself – Retain Planning category – Replace existing Research Plan with new Research Strategy. 3

Measure Overview Sector:Residential Measure name:Advanced Power Strips Applications: Home entertainment (AV), load-sensing Home entertainment (AV), IR-sensing Home office, load-sensing Home office, motion-sensing Home office, PC interaction-sensing Eligibility: Must have at least one controlled device Delivery channel:Retail, direct-install, or mail-by-request only CurrentProposed Category:PlanningPlanning Status:ActiveActive Baseline:Pre-conditionsPre-conditions Sunset Date: 08/31/201508/31/2018 Annual Savings:VariesVaries Measure life: 5 years5 years B/C Ratio: VariesVaries 4 Often called Tier II

Measure applications Research Strategy does not use “Tier I/Tier II” terminology – Performance expected to be specific to APS technology and usage setting Measure divided into five distinct applications: – Home entertainment (AV), load-sensing – Home entertainment (AV), IR-sensing – Home office, load-sensing – Home office, motion-sensing – Home office, PC interaction-sensing Research Strategy describes objectives and research methods specific to each application – Research questions look alike for most applications – Answers likely to be highly context-dependent Don’t necessarily expect all five applications to make it to proven 5

Load-sensing APS, Home entertainment How it works – APS configured so that peripheral devices are powered down when the TV is turned off – Typical controlled devices include DVD player and other AV equipment; – Controlled equipment should not include set-top box, cable modem, DVR, some game consoles, or AV equipment used separately from TV Research questions – Primary: How much energy does it typically save? – Secondary: What are the typical controlled devices? Do controlled devices change over time? Are some controlled devices associated with poor persistence? 6

IR-sensing APS, Home entertainment How it works – IR sensor monitors remote-control signals; – After 1-2 hour period of inactivity, APS powers down controlled devices (user is given chance to over-ride) – Typical controlled devices include TV, DVD player, and IR- controlled AV equipment; – Controlled equipment should not include set-top box, cable modem, DVR, some game consoles Research questions – Primary: How much energy does it typically save? – Secondary: What are the typical controlled devices? Do controlled devices change over time? Are some controlled devices (including TV) associated with poor persistence? 7

Load-sensing APS, Home office How it works – Load-sensing APS configured so peripheral devices are powered down when the PC is shut down or put to sleep – Typical controlled devices include external monitors, speakers, desk lamps, and some printers; – Controlled devices typically should not include home- network printers, modem/routers, phone, external hard drives Research questions – Primary: How much energy does it typically save? – Secondary: What are the typical controlled devices? Do controlled devices change over time? Are some controlled devices associated with poor persistence? 8

Motion-sensing APS, Home office How it works – Motion-sensing APS configured so peripheral devices are powered down when no movement is detected by the sensor for a period of time – Typical controlled devices include external monitors, speakers, desk lamps, and some printers; – Controlled devices typically should not include home-network printers, modem/routers, phone, external hard drives Research questions – Primary: How much energy does it typically save? – Secondary: What are the typical controlled devices? Do controlled devices change over time? Are some controlled devices associated with poor persistence? – Secondary: Are sensor-placement instructions needed to ensure savings or persistence? 9

PC interaction-sensing APS, Home office How it works – User-downloaded PC application monitors user interactions via the keyboard and mouse; when no activity is detected for a period of time, the application initiates shut-down routine (user is given a chance to over-ride). – Typical controlled devices include the PC, monitor(s), speakers, desk lamps, and some printers; – Controlled equipment typically should not include home-network printers, modem/routers, telephone, external hard drives Research questions – Primary: How much energy does it typically save? Must account for efficiency achieved by baseline PC energy saver settings. – Secondary: What are the typical controlled devices? Are some controlled devices (including the PC) associated with poor persistence? Only one retail product currently available for this application 10

Research Strategy: Data Collection MeasureMinimum Sample SizePre/Post IR-Sensing, Home Entertainment60Yes Load-Sensing, Home Entertainment60Yes Load-Sensing, Home Office60Yes Motion-Sensing, Home Office60Yes PC Interaction-Sensing, Home Office60Yes Pre and post metering (3 weeks min each), cumulative kWh of controlled devices – For IR-Sensing, Home Entertainment: APS control algorithms vary, so research should test whether savings vary significantly across different models – Manufacturer of PC-interaction-sensing APS: Devices can be programmed to collect pre/post kWh and submit to evaluator via internet for low-cost evaluation. – Metering periods should be staggered to avoid seasonal effects. – Study design should try to ensure same equipment metered pre/post. Site audits to inform – Typical configurations of controlled equipment – First-year removal rates (via follow-up phone call?) Research plan should be appropriate for expected program delivery methods. 11

Research Strategy: Data Analysis 12 Annual savings based difference between average daily kWh in the pre- period minus average daily kWh in the post-period. Researchers should check for important savings determinants – Is energy savings correlated with connected device types? – IR-sensing (A/V): Is savings correlated with TV energy-saver functionality? – PC-interaction-sensing: Is savings correlated with baseline PC energy- saver settings. – Results may help inform program design and UES maintenance. Adjustments may be needed to account for differences between study conditions (e.g., participants and delivery channels) and expected programs conditions. – Final research plan should describe expected adjustments Estimated Cost Range (all five applications): ( $2million)

Other Research Paths 13 The RTF’s judgment is that the following methods are not likely to provide sufficient rigor for Proven UES estimates: Bottom-up savings Post-only or pre-only metering with simulated counterfactual The RTF does not have a strong opinion as to whether this method can provide sufficient rigor for Proven UES estimates Wide study with AMI interval data

UES Planning values 14 APS typeApplication settingDelivery channelKWh savings (current) KWh Savings*, ** (proposed) Load-Sensing Home EntertainmentDirect install40 Home OfficeDirect install20 UnknownMail-by-request/retail30 Motion- Sensing Home OfficeDirect install70 Home Offic -by-request/retail70 IR-Sensing Home EntertainmentDirect install Home EntertainmentMail-by-request/retail PC-SensingHome OfficeUnknownN/A238 * RTF Planning estimates are not reliable. ** Savings figures refer to properly-installed APS units and do not include adjustments for improper installation or subsequent removal.

Origin of Planning UES values 15 IR-sensing, home entertainment. – Value is weighted average of two estimates from study prepared for SDG&E (AESC, 2014) – Savings of 234 kWh, based on CalPlug methodology applied to 42 sites – Savings of 134 kWh, based on pre/post data collected for 9 sites – Simple weighted average is (42* *134)/51 = 216 PC-interaction-sensing, home office – Value based on percent savings rate applied to RBSA-based estimate of relevant workstation energy – RBSA Metering Study Report (Ecotope, 2014) estimates average annual energy consumption by end use. – "CPU" (331 kWh), "Computer accessory" (145 kWh), “Monitor" (145 kWh) – Many accessories (modem, external hard drive) should not be APS controlled, so we count only Monitor and CPU in base energy ( = 476 kWh) – (ECW, 2012) suggests 50% potential savings for Energy Saver settings (476*0.50 = 238 kWh)

Reminder 16 Unlike Proven UES values, RTF Planning values are not subject to stringent reliability requirements. For Proven UES measures, evaluated savings is based on published UES values and measure counts obtained through Delivery Verification. For Planning UES measures, programs are expected to evaluate all aspects of measure savings. Evaluations should account for: – Installation rate. Units that are not installed, or not installed correctly, may save little or no energy (especially relevant to mail-by-request and retail delivery channels) – Removal rate. Customers who are not satisfied with a measure may remove it after installation (relevant to all channels) – Actual savings for installed units. Evaluated savings should be based on primary data or reliable published unit savings values (RTF planning values are not reliable). (relevant to all channels)

Cost updates 17 APS typeApplication settingDelivery channelMeasure cost (current) Measure cost* (proposed) Load-Sensing Home EntertainmentDirect install$35$37 Home OfficeDirect install$35$37 UnknownMail-by-request/retail$32 Motion-Sensing Home OfficeDirect install$35$50 Home Offic -by-request/retail$32$40 IR-Sensing Home EntertainmentDirect install$60$52.5 Home EntertainmentMail-by-request/retail$100$42.5 PC Interaction- Sensing Home OfficeDirect installN/A$55 Home Offic -by-request/retailN/A$45 * Prices based on amazon.com and/or manufacturer webpages (Feb. 4, 2015), correspondence with manufacturer, and SDGE Work Paper REHE0004. Direct install costs assume device price same as retail; installation is $5/unit for load-sensing, $10 all others.

B/C Ratios 18

Proposed Motion “I, ______________, move that the RTF approves the Residential Advanced Power Strips as a UES measure – Keep category Planning – Keep status Active – Set sunset date to August, 2018” 19

Additional Slides 20

Alternative Research Method: Bottom-up savings Basic method for estimating savings: – Research the type and quantity of controlled equipment; – Combine with secondary data on estimates of stand-by and active power; – Use judgment to estimate average duration of savings periods for various controlled devices in different operating modes. Similar method appears to have been used in other jurisdictions for some applications. The RTF’s judgment is that this method is not likely to provide sufficient rigor for Proven UES estimates 21

Alternative Research Method: Simulated counterfactual Basic method for estimating savings: This slide will describe the Simulated-counterfactual approach used in several recent “Tier II” studies in California The RTF’s judgment is that this method is not likely to provide sufficient rigor for Proven UES estimates 22

Alternative Research Method: AMI Interval Data Basic method for estimating savings: – Rather than a small sample of plug-load data, use a large sample of whole-house data; – Could use actual pre-post consumption data; – At minimum, interval data could help identify unoccupied vacation periods (might permit longer study periods); – Method details not spelled out in research strategy Con: Reliability hard to know in advance (harder than usual) Pro: Add to understanding of The Great AMI Opportunity Estimates could apply directly to UES for mail-by-request program (assuming units in the study were mailed out) The RTF does not have a strong opinion as to whether this method can provide sufficient rigor for Proven UES estimates 23

References [AESC, 2014] Valmiki, M., and A. Corradini, (AESC, Inc.), Tier 2 Advanced Power Strips in Residential and Commercial Applications, Prepared for SDG&E Emerging Technologies Program. [Ecotope, 2014] Larson, B., L. Gilman, R. Davis, M. Logsdon, J. Uslan, B. Hannas, (Ecotope, Inc.) Residential Building Stock Assessment: Metering Study, NEEA. study.pdf?sfvrsn=6 [ECW, 2012] Bensch, I., S. Pigg, K. Koski, R. Belshe, (Energy Center of Wisconsin), Electric Savings Opportunities for Home Electronics and Other Plug-in Devices in Minnesota Homes, Energy Center of Wisconsin. 24