WORKSHOP OBJECTIVES AND DAY-PLAN Present draft framework and indicators To review these and in particular, to use your technical and contextual knowledge.

Slides:



Advertisements
Similar presentations
Global nutrition cluster’s information management tools
Advertisements

Group 3 A: Capacity Building - Operational (Technical) Support What capacity is needed to ensure an effective operational response to a humanitarian emergency?
Bridging food security and nutrition
Pillar 4a Information management
GNC Update July 2013 to August 2014 GNC Annual meeting September 2014 Rome, Italy.
PROPOSED ACTIVITIES Nutrition STRATEGIC Area 4 Information/Knowledge Management (includes monitoring & assessment) GLOBAL NUTRITION CLUSTER VISION:
Bamboo Booklet – a Proposal Guidelines for the use of bamboo in humanitarian relief.
IFRC Shelter Technical Training Yverdon-Les-Bains, Switzerland | 3 rd – 7 th March 2008 This session describes the benefits of developing a strategic plan.
CLUSTER SPECIFIC CASELOAD 5 TARGET GROUPS 1 IDPS IN CAMPS – 20% OF FAMILIES= FAMILIES 2 IDPS OFF CAMPS- 80% OF FAMILIES =
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
FINAL PUBLIC REVIEW OF DRAFT NATIONAL CORE ARTS STANDARDS What you should know and be able to do!
Step 6: Implementing Change. Implementing Change Our Roadmap.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session describes the benefits of developing a strategic.
Updates on OCHA initiatives 2013 Cluster Reference Module Humanitarian Program Cycle Cluster Monitoring Process Needs Assessment and Monitoring initiative.
Multiple Indicator Cluster Surveys Data Interpretation, Further Analysis and Dissemination Workshop MICS Global Update.
Shelter Cluster Vanuatu Meeting 23 July 2015 PWD Offices, Port-Vila.
Vanuatu Shelter Cluster meeting 11 th June 2015 PWD main office – conference room.
WG3 Leader: Michelle Bush International Working Forum for Regulatory Supervision of Legacy Sites (RSLS) – Technical Meeting October 2013.
Achievements to date on the IDP Profiling Process UNFPA UNHCR Brussels IDP Profiling Workshop 22 – 23 March 2007.
7 th November SC Agenda – 7 th November 2012 Opening & Introductions Minutes of the meeting 3 rd October, including action.
1 UN-HABITAT Somalia 17 th November 2006 Shelter solutions for displaced communities in Somalia Pilot Bosasso - Puntland ‘shelter cluster’ UNHCR UN-HABITAT.
COMMISSIONING DEVELOPMENT PROGRAMME NHS CB Establishment Programme – Primary Care Commissioning Sam Illingworth – Dental, Pharmacy and Optometry Lead NHSCB.
Results Frameworks Somalia Joint Needs Assessment November 2005.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by This workshop discusses implementing a strategy for supporting.
A UNHCR Perspective on IDP Profiling Interagency Workshop Brussels 22 – 23 March 2007.
Day 1 Shelter Meeting 09a is hosted by Swiss Solidarity 08:30 – 09:00 09:00 – 09:15 09:15 – 09:30 09:30 – 10:30 10:30 – 10:50 10:50 – 11:00 11:00 – 11:30.
Shelter Meeting 09b is hosted by UNHCR Safer Homes, Stronger Communities: Rebuilding After Disaster Update of “Safer Homes, Stronger Communities: Rebuilding.
Regional Policy Veronica Gaffey Evaluation Unit DG Regional Policy International Monitoring Conference Budapest 11 th November 2011 Budapest 26 th September2013.
M&E requirements for grant signing: M&E Plan Workshop on effective Global Fund Grant negotiation and implementation planning January 2008 Manila,
Shelter Meeting 09a, Geneva Topic:Urban Displaced Objectives:to know about 1) the status quo of current initiatives 2) the project “guidelines.
Shelter Meeting 09b is hosted by UNHCR Shelter After Disaster: update Shelter After Disaster: transitional settlement and reconstruction Shelter After.
United Nations Regional Seminar on Census Data Dissemination and Spatial Analysis September, Nairobi, Kenya 1/18 Consultations with users in preparing.
Mario C. Flores Director, Disaster Response Field Operations Habitat for Humanity International Shelter Meeting 10b Palais des Nations, Geneva 2-3 December.
S Sudan: Overcoming challenges to information management (IM) GNC Annual meeting October 2015.
09:00 – 09:20 09:20 – 09:30 09:30 – 10:00 10:00 – 10:45 10:45 – 11:00 11:00 – 11:30 11:30 – 12:00 12:00 – 12:30 12:30 – 13:00 13:00 – 14:00 14:00 – 15:00.
Presented by: Shubha Chakravarty (Economist, AFTPM) Impact Evaluation team: Mattias Lundberg (Sr. Economist, HDNCY) Markus Goldstein (Sr. Economist, AFTPM.
Geospatial LoB: Lifecycle WG Update November 3, 2009.
U N C C D The new monitoring and reporting system of the UNCCD, looking for synergy options in reporting Cambridge, 10 February 2010.
1 SUPPLY DIVISION Procurement and Supply Management Technical Assistance.
Evolution to date: where the clusters have come from, where have we reached and where should we be heading? GNC Annual Meeting 13 th -15 th October, Nairobi,
Global mHealth Report mHealth Interest Group Webex 24 November 2015.
Mid-Decade Assessment of the United Nations 2010 World Population and Housing Census Program Arona L. Pistiner Office of the Associate Director for 2020.
Thursday 2 December 2010Shelter meeting 10b is hosted by OCHA Transitional Shelter Guidelines Tom Corsellis: Shelter Centre.
M&E Joint Programming in Mozambique 12 th May 2009.
Developing a Monitoring and Evaluation Framework: Insight into internal stakeholder learnings Beth Ferguson AES Conference Sydney 2 September 2011.
ACTED AME Appraisal, Monitoring and Evaluation. Summary 1/ ACTED AME department 2/ AME Responsibilities 3/ AME throughout project cycle 4/ Involvement.
How did we get to this point Reviewed the BDA (2008) Curriculum Framework Hosted a number of consultation events in 2010 with placement providers Developed.
Wash Cluster / Kachin and North Shan states Clashes.
Every Student Succeeds Act January Christopher Woolard Senior Executive Director, Center for Accountability and Continuous Improvement Colleen D.
Support to National REDD+ Action: Global Programme Framework (SNA) Work Plan and Budget 2015 Information and Knowledge Sharing Sessions Twelfth.
Common Needs Assessments Context: Sudden onset humanitarian emergencies: Can and should logistics play a stronger role in rapid assessments?
Kick Off Meeting Largs, Scotland
CCP: Monitoring and Evaluation
Shelter Working Group Meeting Thursday 6 July, 10AM
Partnering the process
NFI Working Group 2016 Review
55 Assessment, monitoring and evaluation
GNC Global Partners Meeting Washington 30/03/16
ADGI Phase 4 Workshop Data Sources for Health Component
Cash for construction materials
Joint Inter-Agency Profiling Service
BIG LAUNCH! Urban Assistance Guidelines Shelter Meeting 10a May 2010
Developing a shelter strategy
CEOS Context LSI/SDCG/GEOGLAM Joint Meeting
Partnering the process
133 Implementing settlement programmes
Food Security Sector – Cox’s Bazar
Displacement Tracking Matrix DTM; Sector 4W
Monitoring and Evaluation
Presentation transcript:

WORKSHOP OBJECTIVES AND DAY-PLAN Present draft framework and indicators To review these and in particular, to use your technical and contextual knowledge to ground these to the Somalia context. Focus on structure of framework and indicators (not semantics at this point) FUTURE WORKPLAN To circulate draft framework for comments (August), host 2-day workshop (september) and to take framework to field (Oct-Nov); finished framework delivered (Dec). Shelter Cluster Workshop UNHCR, Nairobi, Kenya 18 December 2014 Somalia Shelter Cluster Monitoring & Evaluation Framework

TITLE 1 TITLE 1 TITLE 1 M&E Framework Matrix 2 Objectives of presentation: -Timeline for completion and handover; Necessary WG feedback -Project cycles ; NFI, Emergency, Transitional and Permanent -Indicator Matrix; Baseline, Needs, Registration, Monitoring, Post Evaluation Distribution, Construction Monitoring, Post Construction Monitoring -Tool Matrix; Use of tool, indicators, analysis, etc

TITLE 1 TITLE 1 TITLE 1 Programme Cycle 2 Timeline for completion: Feedback from TWG members (by 5 January) Framework, guidance document, tool refinement (by 23 January) Presentation and handover (end of January) Training support (early February)

WORKSHOP OBJECTIVES AND DAY-PLAN Present draft framework and indicators To review these and in particular, to use your technical and contextual knowledge to ground these to the Somalia context. Focus on structure of framework and indicators (not semantics at this point) FUTURE WORKPLAN To circulate draft framework for comments (August), host 2-day workshop (september) and to take framework to field (Oct-Nov); finished framework delivered (Dec). M&E and the Project Cycle Somalia Shelter Cluster Monitoring & Evaluation Framework

TITLE 1 TITLE 1 TITLE 1 Programme Cycle 2 How will the proposed M&E framework fit your existing programmes? The NFI programme cycle is comprised of 4 phases : 1.Baseline 2.Needs 3.Registration 4.Monitoring 5.Post Distribution Evaluation NB. The M&E framework will focus on external processes and internal processes (staffing, funding, communications etc).

TITLE 1 TITLE 1 TITLE 1 Programme Cycle 2 The Emergency programme cycle is comprised of 4 phases : 1.Baseline 2.Needs 3.Registration 4.Monitoring 5.Post Distribution Evaluation

TITLE 1 TITLE 1 TITLE 1 Programme Cycle 2 The Transitional programme cycle is comprised of 4 phases : 1.Baseline 2.Needs 3.Registration 4.Construction Monitoring 5.Post Construction Evaluation Voucher distribution / “ground” breaking Delivery; construction completed, land deeds handed over, etc Construction process

TITLE 1 TITLE 1 TITLE 1 Programme Cycle 2 The Permanent programme cycle is comprised of 4 phases : 1.Baseline 2.Needs 3.Registration 4.Construction Monitoring 5.Post Construction Evaluation

WORKSHOP OBJECTIVES AND DAY-PLAN Present draft framework and indicators To review these and in particular, to use your technical and contextual knowledge to ground these to the Somalia context. Focus on structure of framework and indicators (not semantics at this point) FUTURE WORKPLAN To circulate draft framework for comments (August), host 2-day workshop (september) and to take framework to field (Oct-Nov); finished framework delivered (Dec). Framework development and M&E Matrix Somalia Shelter Cluster Monitoring & Evaluation Framework

TITLE 1 TITLE 1 TITLE 1 Development of the M&E Matrix 2 The Indicator Matrix currently represents a consolidation of existing frameworks and indicators Sphere ECHO NRC Return Consortium Shelter Cluster Global Indicators Shelter Cluster Strategic Operational Framework ECHO Current M&E Framework

TITLE 1 TITLE 1 TITLE 1 Indicator Matrix 2 Linking Operational Framework to the M&E Framework

TITLE 1 TITLE 1 TITLE 1 Indicator Matrix 2 Linking Operational Framework to the M&E Framework

TITLE 1 TITLE 1 TITLE 1 Indicator Matrix 2

WORKSHOP OBJECTIVES AND DAY-PLAN Present draft framework and indicators To review these and in particular, to use your technical and contextual knowledge to ground these to the Somalia context. Focus on structure of framework and indicators (not semantics at this point) FUTURE WORKPLAN To circulate draft framework for comments (August), host 2-day workshop (september) and to take framework to field (Oct-Nov); finished framework delivered (Dec). Tools Somalia Shelter Cluster Monitoring & Evaluation Framework

TITLE 1 TITLE 1 TITLE 1 M&E Tools How do the three pillars translate to the Shelter Cluster M&E framework and possible tools? First, let’s consider the distribution of Emergency Assistance Packages to a displaced population: Discussion points: -Timing of tools, especially PDM – how many weeks after distribution? ( see timing column ) Project Cycle -Baseline -Needs -Registration -Monitoring -Evaulation Use of Tool -Indictors -# of items distributed -(Un)intended item use -Households’ Satisfaction -Repeat CORE population and intention questions Mainly output focussed 2 Tool

TITLE 1 TITLE 1 TITLE 1 M&E Tools How does this translate to Projects framework and possible tools? The monitoring and evaluation of shelter project involves at least two more steps: Project Cycle - Context Analysis - Population Assessment - Intentions Survey Use of tools When & How Indicators and Level of Analysis -# of items distributed -(Un)intended item use -Households’ Satisfaction 2 Tools - Strategic Planning - Settlement Planning References

WORKSHOP OBJECTIVES AND DAY-PLAN Present draft framework and indicators To review these and in particular, to use your technical and contextual knowledge to ground these to the Somalia context. Focus on structure of framework and indicators (not semantics at this point) FUTURE WORKPLAN To circulate draft framework for comments (August), host 2-day workshop (september) and to take framework to field (Oct-Nov); finished framework delivered (Dec). Tool Desk Review Somalia Shelter Cluster Monitoring & Evaluation Framework

TITLE 1 TITLE 1 TITLE 1 Tool Desk Review 2 Full Tool Review; Tool Name, Type of Tool, Agency, Shelter Type, ETC Sphere ECHO NRC Return Consortium Shelter Cluster Global Indicators ECHO Desk Review

TITLE 1 TITLE 1 TITLE 1 Shelter Cluster Strategic Operational Framework 2 Linking Operational Framework to the M&E Framework

WORKSHOP OBJECTIVES AND DAY-PLAN Present draft framework and indicators To review these and in particular, to use your technical and contextual knowledge to ground these to the Somalia context. Focus on structure of framework and indicators (not semantics at this point) FUTURE WORKPLAN To circulate draft framework for comments (August), host 2-day workshop (september) and to take framework to field (Oct-Nov); finished framework delivered (Dec). Thank you Any questions? Somalia Shelter Cluster Monitoring & Evaluation Framework