MDT PS DCS for ATLAS Eleni Mountricha

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

The Control System for the ATLAS Pixel Detector
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
Robert Gomez-Reino on behalf of PH-CMD CERN group.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
BOE/BME – MDT: DCS For the 2 BOE, DCS needs to handle 2 x 2 HV (1 ch/multilayer) 2x LV 2x JTAG, associated 2 MDMs/ELMBs Monitoring of T, B and CSM sensors.
09/11/20061 Detector Control Systems A software implementation: Cern Framework + PVSS Niccolo’ Moggi and Stefano Zucchelli University and INFN Bologna.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
DCS Plans and Pending Activities for 2013/14 Shutdown Muons in general Replacement/upgrade of DCS computers OS migration to Win-7, Win-2008 or SL6 PVSS.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
DCS workshop July 2007 Overview Installed detectors Installed detectors FMD3 commissioning FMD3 commissioning FSM Hierarchy FSM Hierarchy LV+HV FSMs LV+HV.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
The Detector Control Power System of the Monitored Drift Tubes of the ATLAS Experiment Theodoros Alexopoulos NTU Athens TWEPP08 September 17, 2008 Naxos,
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
Controls EN-ICE FSM for dummies (…w/ all my respects) 15 th Jan 09.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
XXVI workshop on resent developments in High Energy Physics and Cosmology Ancient Olympia,16-19 April 2008 Tsarouchas Charilaos NTUA Detector Control System.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
CLAS12 ECAL PCAL DC FTOF... Region 2 DewPnt Region 3 Region 4 Region 1 Mod 1... Mod 2 HV TEMP LV Hierarchy of Slow Controls: Driven by Finite State Machine.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
PVSS an industrial tool for slow control
ATLAS MDT HV – LV Detector Control System (DCS)
CMS – The Detector Control System
Cosmic Ray Tracker and Detector Control System at the GIF++
The LHCb Run Control System
TPC Detector Control System
Philippe Vannerem CERN / EP ICALEPCS - Oct03
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System: towards the final system
RPC Detector Control System
Experiment Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Tools for the Automation of large distributed control systems
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

MDT PS DCS for ATLAS Eleni Mountricha National Technical University of Athens Power Supplies DCS group Eleni Mountricha NTUA

Outline MDT chambers in ATLAS and their HW PS DCS system Present Status of PS system Conclusion Eleni Mountricha NTUA

MDT chambers in ATLAS and their Hardware Eleni Mountricha NTUA

ATLAS experiment and MDT chambers MDTs Side A Side C Endcaps Barrel Inner Middle Outer stations 16 sectors 1150 chambers Eleni Mountricha NTUA

and the naming convention MDT chambers and the naming convention BIL1A01 B I L 1 A 01 partition layer size station side sector Eleni Mountricha NTUA

Power Supplies modules Mainframe CAEN SY1527 Branch Controllers A1676 Crates Boards LV: A3025 & A3016 HV: A3540P Eleni Mountricha NTUA

PS DCS system Eleni Mountricha NTUA

Software DCS PVSS (SCADA system) and Finite State Machine (SMI++ tool) User Interface Layer Processing Layer Driver Layer CTRL API EV D UIM DM Communication and Memory Layer Monitor and control Hardware using PVSS elements (datapoints) Automate system in propagating commands as well as state and status Commands States & Alarms DCS Tracker Vertex Muon Gas LV HV Cooling Eleni Mountricha NTUA

PVSS datapoints Datapoints that correspond to hardware modules (channels, boards, crates, branch controllers, mainframe) Datapoints that correspond to the chambers Internal datapoints for the FSM for the OPC Server (communication with hardware) for the RDB manager (archiving of datapoint elements) Alarms are activated for the datapoints and their elements Eleni Mountricha NTUA

FSM trees One FSM tree is implemented for each partition Hierarchy is set for the parts of the system (nodes and their children) Commands and states propagate correctly Eleni Mountricha NTUA

FSM panels Eleni Mountricha NTUA

Tool panels Panels used by experts for the configuration of the system : alarmHandling.pnl communicationHandling.pnl archiveHandling.pnl fsmHandling.pnl chamberDpHandling.pnl settingsHandling.pnl descriptionHandling.pnl Eleni Mountricha NTUA

Tool panel example Eleni Mountricha NTUA

Present status of PS system Eleni Mountricha NTUA

Barrel Most chambers are incorporated in the system having LV modules (9 modules missing) HV modules for almost all chambers in sectors 1-12 Eleni Mountricha NTUA

Endcaps Both Big Wheels and Small Wheels (one for each side) are incorporated to the system having both LV and HV modules Chambers in the Outer layer in side C are also incorporated in the system but most LV modules are missing Eleni Mountricha NTUA

Conclusion Eleni Mountricha NTUA

PS DCS system is in use for the MDTs Improvements are made in the PVSS/FSM part of the system to achieve higher stability of the system Development is implemented concerning expert panels to achieve more efficient control of the system MDT PS from the HV/LV modules’ point of view are reaching their completion Eleni Mountricha NTUA

Eleni Mountricha NTUA

Eleni Mountricha NTUA

Eleni Mountricha NTUA