Systems Level Design Review Project #10715 1/15/09 Rev 011.

Slides:



Advertisements
Similar presentations
Factory Objectives Value of Asset Management Strategies.
Advertisements

Project leaders will keep track of team progress using an A3 Report.
ATK Automated Bullet/Case Loading University of Idaho, Mechanical Engineering Dept. Team FMJ Chris Doudy, Ryan Kahre, Adriana Foreman, Ryan Bowen, Jordan.
Mike Marr Safety Consultant Specialist
Mission Statement: The aim of this project is to improve the meat marinade tumbler transport in the Wegmans Culinary Innovation Center. Currently, meat.
What We Believe At Wegmans, we believe that good people, working toward a common goal, can accomplish anything they set out to do. In this spirit, we set.
Project Review Presentation Project # /14/10
Andreana Crance, Industrial & Systems Engineering Matt Syska, Industrial & Systems Engineering.
Wegmans: Flip-Label Project Team Members: Brandon Sbordone (ME), George Kilger (EE), Ben Bouffard (EE), Ian Baker (ME), Charlie Nicolosi (ME), Helen Jervey.
MSD-I Project Review Modular Motion Tracking Sensors 1.
EDGE™ Concept Level Project Plan P08043 – Magnet Centering Device Aaaron Burger (Mechanical Engineer)
Rev 11.  Slides guide discussion  Inform about recent progress  Summarize make vs. buy options ◦ Aligning ◦ Labeling  Discuss next steps 
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 2:20Introductions 2:25Project Description 2:35Customer Needs 2:40Risk.
EDGE™ Centering Magnet Device P08028 By: Aaron Burger.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
MSD-II Project Review Modular Motion Tracking Sensors 1.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
6 Resource Utilization Teaching Strategies
Introduction to Computer Technology
 Rob Fish (Industrial Designer)  Zachary Kirsch (Mechanical Engineer, PM)  Martin Savage (Mechanical Engineer)  Olivia Scheibel (Mechanical Engineer)
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
Wegmans Frozen Cookie Capacity Increase Final Project Presentation Richard Latham, Bridget Eggers, Tyler Brent, Valeria Gonzalez.
Detailed Design Review Project # /12/10 1Rev 01.
S/W Project Management
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Levi Stuck Evan DeCotis Kate Gleason Stephanie Rager.
Industrial Engineering Roles In Industry
Unclassified U.S. ARMY TANK AUTOMOTIVE RESEARCH, DEVELOPMENT AND ENGINEERING CENTER Reverse Engineering Re-defined Requirements TARDEC 25 AUG Presented.
Wegmans: Flip-Label Project Team Members: Brandon Sbordone (ME), George Kilger (EE), Ben Bouffard (EE), Ian Baker (ME), Charlie Nicolosi (ME), Helen Jervey.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Chapter 12: Systems Investigation and Analysis. Agenda  How to Develop a CBIS?  Systems Development Life Cycle (SDLC)  Prototyping  Join Application.
Wegmans Bread Tray Lift Assist By Brendan Moran,Greg Feather Alex Phillips and Andrew Beasten.
Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution Structured programming Product SW.
Jeffrey Murray Test Manager PowerPoint Microsoft Silicon Valley.
13 Step Approach to Network Design Steps A Systems Approach 8Conduct a feasibility Study 8Prepare a plan 8Understand the current system 8Design.
Course of MT- 362 Material Handling Lecture # 3.
P15741: Air Table Mover Photo: Newport.com. Team Members Cameron Young – Team Leader Daniel Miller – Lead Mechanical Engineer Nicholas LeBerth – Edge.
1 Getting Started : Purposes of IS Strategic Planning.
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
Job Safety Analysis.
DP-R1 System for detection & response to production disruptions FR-R1 Respond rapidly to production disruptions FR-R12 Communicate problems to the right.
Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution Structured programming Product SW.
DETAILED DESIGN REVIEW Matthew Jackson, Derek Kreider, Emily Smith, Tashalynn Taylor December 10, 2013.
Electrophotographic Cascade Development Apparatus Team 15503:Zach Foggetti (ME) Dalton Mead (ME) Bridget Kearney (EE) Ruishi Shen (ISE) Tom Wossner (ME)
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
14471 Vibration Test Apparatus: Systems Design Review Team Lead: Brett Billings Lead Engineer: Nicholas G Scribe: Ashley W EDGE: Claire Kobal Team Members:
Rishitha Dias (IE): Team Manager Kevin Klucher (ME): Technical Lead John Hayles (ME): Design Engineer Reme Meck (ME): Turbomachinery Expert P09454.
CAD CAM. 2 and 3 Dimensional CAD: Using 2-dimensional CAD software, designers can create accurate, scaled drawings of parts and assemblies for designs.
Marble Cake Process Improvement – Final Review Aaron Delahanty Arwen Sharp Benson Yu Kenyon Zitzka Ryan Norris.
Chapter 1 Assuming the Role of the Systems Analyst.
INSTRUMENT CONTROLLED MICROSCOPY Mason Jellings, Justin Gearing, Sarah Reichert, John Byce Client: Dr. Joshua Medow Advisor: Professor Thomas Yen Introduction.
Eric Albanese Helen Jervey Barret Zeinfeld Josh Monsees.
Automated flow line Meghana.
MSD Parbake Mezzanine Final Meeting Clem Pin (ME) Sam Phillips (ME) Graham Frasch (ME)Simon Stam (ME) Matt Lynch (EE) Stefan Colegrove(EE)
Wegmans Swirl Cake Automation
End of Line “Pass Through” Conveyor
Turbomachinery Flow Visualization P08453
Principles of Information Systems Eighth Edition
Concept Level Project Plan P08008 – ArcWorks Process Improvement
Software Requirements
Request for Proposal (RFP)
Automation Topics: Elements of an Automated System
Automated Oiling System
Tub Lift Rev. 2 Dom Group
P10457: D-R Process Improvement
Tub Lift Rev. 2 Dom Group
Final Status Update P09006 – Upper Extremity Exerciser
Presentation transcript:

Systems Level Design Review Project # /15/09 Rev 011

 Helen Jervey (ISE), Project Lead  Charles Nicolosi (ME), Chief Engineer  Brandon Sbordone (ME)  George Kilger (EE)  Ian Baker (ME)  Ben Bouffard (EE)  Advised by John Kaemmerlen Rev 012

 Provide background information about the current system at the Culinary Innovation Center  Detail the progress made by the team from RIT  Receive feedback from faculty and Wegmans staff  Discuss the next steps in the process Rev 013

Customer Needs Engineering Specs Rev 014

 Wegmans is a food market with more than 70 stores in five states  The Culinary Innovation Center, or CIC, provides all premade sauces and marinated meat products to Wegmans stores Rev 015

 The current factory line requires seven people performing repetitive, injury prone tasks  Injuries have cost Wegmans more than $20,000 in the marinade area since the opening of the CIC  Unreliable labeling technology leads to rework, wasting the time of the employees Rev 016

 Reallocate direct labor from flipping, labeling ◦ Allow employees to move to other areas of the CIC  Reduce ergonomic risks on line  Perform all work within safety and quality  standards Rev 017

 Primary ◦ Meet AMA, OSHA, USDA and other relevant standards ◦ Maintain integrity of product  Secondary ◦ Reallocate direct labor from flipping, aligning ◦ Automate or improve flipping, aligning, and labeling processes ◦ Maintain or improve takt time Rev 018

◦ Need 1: Product & Process are Safe  Need 1.1: Product integrity is maintained  Need 1.2: Equipment satisfies USDA Regulations as well as the AMI Checklist  Need 1.3: OSHA Safety requirements are met  Need 1.3A: Remove ergonomic issues and concerns ◦ Need 2: Reallocate Direct Labor  Need 2.1: Reallocate direct flipping labor  Need 2.2: Reallocate direct alignment labor  Need 2.3: Reallocate direct labeling labor Rev 019

◦ Need 3: Improve Processing Time  Need 3.1: Maintain or decrease takt time  Need 3.2: All packages get scanned by the x-ray at desired belt speed  Need 3.3: Control flow to scaling operation. (Control flow- rate variance)  Need 3.3A: Meet x-ray specs of one piece at a time in machine ◦ Need 4: Control orientation and flow-mechanics  Need 4.1: Packages are in the proper orientation  Need 4.1A: Label is in proper orientation position relative to the package  Need 4.1B: All packages are centered in the x-ray beam  Need 4.1C: Packages are conveyed in single-file o Need 4.2: Avoid impact on other projects  Need 4.2A: Keep allocation of floor space constant Rev 0110

and Feasibility Analysis Rev 0111

 Constraints ◦ Space ◦ Feasibility ◦ Alignment ◦ Efficiency ◦ Mechanical/“Intelligent” AlignFlip X- Ray Label Rev 0112

System Concept Selection Rev 0113

 Mechanical Process  Allows for basic single file flow  Engineered for product inconsistencies  Will need future testing for jam concerns  Basic frictional analysis shows it is feasible Concept Improvement (Though Testing) Rollers Belts Actuated Rev 0114

Frictional Feasibility Analysis Rev 0115

 Mechanical process  Reliably performs a uniform flip  Handles different package sizes and configurations  Handles constant stresses of use  Need component life cycle analysis Concept Improvement (Through Testing) Adjustable Tray Motor Choice Tray Angle Rev 0116

 Must consistently apply identifyer label  Controlled label orientation and position  Imaging/sensing system  Implementation and modification of current labelers to fit project  Research has found feasible camera systems in industry Concept Improvement Professor Meetings Camera Selection Rev 0117

Rev 0118

Align Align product mechanically Guide rails or rollers Push products to center of conveyor Flip Flip product mechanically Offset belt system (upper and lower) Flipper arm or tray One piece at a time X-Ray Automatic accept/reject Label Add identifier label Fully/partially automated or manual Ability to reorient based on product angle and displacement offsets Rev 0119

Pieces enter in 2 or 3 wide Adjustable, offset guides Actuated guides to align pieces/accelerate alignment process Proximity/contact sensors to ensure guide return Laser sensor for piece(s) entering guide path Guide actuates and pushes pieces to center Pieces align with belt friction Rev 0120

 Fixed/Adjustable Guides ◦ Solid rail ◦ Roller guide ◦ Belt guide  Powered/Adjustable Guides ◦ Solid rail/roller guide ◦ Hinge mount for guide ◦ Actuator/Actuators ◦ Proximity sensors ◦ Laser sensors for track Rev 0121

Piece flows into flip tray Laser sensor indicates piece in tray Stop arm for next piece Motor/actuat or rotates flip tray Piece is pushed out of tray Sensor indicates no piece in tray Motor/actuator rotates flip tray Stop arm retracts Automated Flipper Rev 0122

 Flipper Tray ◦ Grated ◦ Solid  Stop Arm ◦ Actuator ◦ Hinge ◦ Proximity Sensor(s)  Flipper ◦ Motor/Actuator ◦ Mounting/Hinges ◦ Piece sensor (laser) ◦ Proximity sensors (up/down) ◦ Product pusher  Fixed  Mechanical  Proximity sensor  Actuator Rev 0123

Single piece enters Vision system identifies package System outputs θ and offset (x,y) Motors align label head based on output Laser sensor (possibly stops belt and) activates vision system Label application Label head retracts/ Returns to home (Belt resumes) Identifier Label Applicator Rev 0124

 Vision System ◦ Laser product sensor ◦ Visual comparator system  Camera  Comparison logic controller  Label Applicator system ◦ X-axis motor ◦ Y-axis motor ◦ θ motor ◦ Label applicator head  Head actuator  Labeler  Foam presser ◦ Label loader  Belt motion controller Rev 0125

Pieces From Multivac Trip Laser sensor(s) Guide Returns Piece leaves beam Single file flow to flip Piece enters flip tray Piece prox. sensor trigger Stop arm actuates Tray actuator trigger Tray rotates down Trigger push prox. Piece prox. Trigger off Tray rotates up Stop arm retracts Piece to lower conveyer Piece through x-ray Piece trips laser Belt stops Camera shoots image Calculate s θ, x, y Labeler assembly offsets x Labeler assembly offsets y Labeler assembly offsets θ Remove label from spool Label head actuates down Label head retracts Belt resumes Guide actuator(s) activate Rev 0126

Rev 0127

IDRisk ItemEffectCause Likelihood Severity Importance Action to Minimize RiskOwner 1 Upstream process changes downstream variables Engineering specs become obsolete, device may no longer meet customer requirements P Project managers meet to discuss changes several times during quarter (week 4, rest TBD) PM 2 Device requires many on- floor adjustments Deliverables not met, client may discontinue use of device Wide package spec range, overly specialized device 224 Device will be set to one, “best” setting; if not possible team will devise as few as possible device settings and develop easy-to-use documentation ME, ISE 3 Modified work tasks are ergonomically risky Workers are injured, slowed production Frequent, repetitive tasks; lifting; flipping 224 Proposed tasks evaluated using ergo risk assessment tool; tasks modified to be less than 24 on scale Helen 4 Device does not meet cleanliness standards Device cannot be used by client Inappropriate materials used, incompatible with cleaning methods 236 AMI Sanitary Design Checklist used to drive all applicable design decisions; device designed to work with current sanitizing methods Helen 5 Device does not work with lightest or heaviest packages Device cannot be used by client Weak design, inappropriate materials 339 Packages beyond dimensions of product range will be tested (TBD) ME 6Device cannot perform at current takt (6 sec) Device cannot be used by client Weak design, mechanical limitations 236Device will be tested at quicker takt (TBD) All Rev 0128

IDRisk ItemEffectCause Likelihood Severity Importance Action to Minimize RiskOwner 7 Device damages or compromises packages Device cannot be used by client Excessive speed/force; sharp edges; pinch points 236 Device tested at range of speeds and forces; test package puncture force? All 8Labeler jams frequently Slowed production, rework Inadequate hardware 236 Sensing system tested at wider range of speeds and package sizes than expected EE 9 Labeler applies misaligned labels frequently Added visual inspection, rework Weak design; inadequate hardware 224 Sensing system tested at wider range of speeds and package sizes than expected EE 10 Flipping task frequently misaligns package Slowed production, direct manual labor, x- ray misses parts of package Weak design; inadequate hardware 224 Sensing system tested at wider range of speeds and package sizes than expected Brandon 11Flipper jams frequently Slowed production, direct manual labor Weak design; inadequate hardware 236 Sensing system tested at wider range of speeds and package sizes than expected Brandon 12 Aligner frequently places packages outside x-ray beam Slowed production, direct manual labor, x- ray misses parts of package Weak design; inadequate hardware 224 Sensing system tested at wider range of speeds and package sizes than expected Charlie 13Aligner jams frequentlySlowed production, direct manual labor Weak design; inadequate hardware 326Sensing system tested at wider range of speeds and package sizes than expected Charlie Rev 0129

IDRisk ItemEffectCause Likelihood Severity Importance Action to Minimize RiskOwner 1 Team member has extended absence Critical chain affected Illness, personal issues 313 Thorough documentation during absence to reduce “catch up” time; team will communicate as much as reasonable during absence All 2Resource over-allocated Deliverables delayed or contain errors Improper resource allocation, over- volunteering 313 PM will check in with all team members weekly to ensure workload is balanced PM 3Parts delayed from supplier Critical chain affected, deliverables delayed Special parts, clerical errors, parts lost 224 Use approved vendors, have multiple vendors, use off-the-shelf parts PM 4Customer priorities change Customer needs, specs become obsolete Business environment change 133 Constant communication with customers regarding needs All 5Insufficient risk assessment Slow response to problems, critical chain affected, deliverables delayed Insufficient thought process 224 Constantly reexamine project and technical risks to ascertain changes All 6Team member leaves MSD Critical chain affected, deliverables delayed Illness, personal issues 133 None. Keep in communication with all team members to plan for reallocation ASAP PM 7 End users unhappy with device Customer needs not met, device cannot be used by client User input not considered during design, design not suited to users 339 Include end user input in all phases of design; practice active listening; ask “Why?” when concerns are raised to find root cause All 8Budget changes during project Engineering specs may be infeasible, customer needs change Business environment change 133Adjust project goals, demonstrate cost savings of project and return on investment PM Rev 0130

Rev 0131

 Evaluate analyzing methods for the labeling device  Gather data on packaging durability  Research optimal methods of flipping and aligning  Draft circuit designs for controls and sensors  Draft schematics for mechanical devices  Investigate costs of long lead time devices  Physically implement designs  Test "first run" designs on product  Revise and improve designs  Detailed Design Review: Friday 2/12 (4 weeks) 32Rev 01

33Rev 01