Introduction to eziLink Training For the Ministry of Forests and Sustainable Resource Management.

Slides:



Advertisements
Similar presentations
How to use the DET (Data Entry Tool) Core data Set H.
Advertisements

How to use the DET (Data Entry Tool) Core data Set J.
EziLink RESULTS Training Session 1 – Show and Tell For the Ministry of Forests, Lands and Natural Resource Operations.
Cheryl Jelks Trainer/Applications Support Analyst Richland School District One.
Page 1 of 11 Lessees can submit individual Unit Values for their Production Entities if they do not want to utilize the default unit value. If no Unit.
PantherSoft Financials Smart Internal Billing. Agenda  Benefits  Security and User Roles  Definitions  Workflow  Defining/Modifying Items  Creating.
1099 Pro, Inc. – Software for Pro Enterprise Edition Features.
Welcome to OpenHouse  The OpenHouse website is located at  It is recommended that this site is viewed at a.
1 Vendor Reverse Auction - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines.
Introduction to Online Data Collection (OLDC) Community Based Abstinence Education September, 2009.
Discipline, Crime, and Violence October 2014 Tara K. McDaniel, M.S.
RESULTS Training Woodlot Reporting to RESULTS ESF Submission March 2013 Mei-Ching Tsoi
Purchasing Goods and Services. Overview In this session you will learn how to utilize the eProcurement Module to create requisitions for purchasing goods.
MT+ GUIDE FOR BENEFICIARIES. 1. GENERAL INTRODUCTION.
Quick Start Guide. This 22 page introduction to the Financial Assessment Subsystem provides the user with a visual overview of the components of the system.
RESULTS Training Woodlot Reporting to RESULTS Online Data Entry March 2013 Mei-Ching Tsoi
RESULTS Training Woodlot Reporting to RESULTS Online Data Entry Demo March 2013 Mei-Ching Tsoi
Understanding Key Applications 1 Ministry of Forests Understanding Key Applications: An overview of application inter-connections Corporate IT Training.
PROACTIS: Supplier User Guide Contract Management.
Billing Agent. Pre-Application Checklist Introduction to IMPACT and Key Terms Application Process Starting an Application The Business Process Wizard.
Silent Dismissal Administrator Quick Start Guide.
1 Vendor RFI - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
Spring 2006 Version 3.0 Overview Module. FTA/ESF Overview Module Introduction to the Session Welcome to the FTA/ESF Overview Training Session 1.1.
Gasoline and Diesel Event User Guide. Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
MEGS+ Michigan Electronic Grants System Plus Office of Special Education May 2012.
Lesson 13: Building Web Forms Introduction to Adobe Dreamweaver CS6 Adobe Certified Associate: Web Communication using Adobe Dreamweaver CS6.
RESULTS Training Core Module 3 Obligation Reporting Submitting by ESF Sept 2013.
September 5, 2015 Office Setup. Lesson Overview: Office Setup  In this lesson we will cover:  Adding new offices to COM  Individual office setup 
RESULTS FRPA s.108 Application November 2010 Presented by Mei-Ching Tsoi
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
Mindy Gigantelli Rebecca Zdon Gloria Queeno-Chamberlain.
RESULTS Corporate Reporting System March 2012 Presented by Mei-Ching Tsoi
OCAN College Access Program Data Submissions Vonetta Woods HEI Analyst, Ohio Board of Regents
ERA Manager Training December 19, Propriety and Confidential. Do not distribute. 2 ERA Manager Overview In an effort to reduce the need for Providers,
October 2008 Version 4.0 FTA/ESF Recreation Module.
A1 Agenda RESULTS Training RESULTS & Mapview RESULTS & Mapview MOF Information Management Group 2005 Module 8 – RESULTS & Mapview.
Lead Management Tool Partner User Guide March 15, 2013
Discipline, Crime, and Violence August New DCV Application The DCV application and submission process has been revised beginning with the
Introduction to eziLink Training For the Ministry of Forests and Sustainable Resource Management.
Smart Forms 2010 CAMIS Conference July 29,  Session Overview  Smart Form Process Flow  Understanding the Initial Procedures  Scan Process in.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
A1 Agenda RESULTS Training Planning Planning MOF Information Management Group 2005 Module 7 – RESULTS Generating Reports.
WELCOME to the QSNY Portal Public School Self-Study 1.
What’s New? RESULTS Training RESULTS 3.0 What’s New? RESULTS 3.0 What’s New? MoFR Information Management Group March 2007 Module 12 – RESULTS 3.0 What’s.
RESULTS Training Carbon Offset Reporting to RESULTS Sept 2013.
PearsonAccess April 14, PearsonAccess – Agenda Order Tracking Additional Orders Student Data Upload (SDU) files New Student Wizard Online Testing.
Quesnel Forest District Sharing of experiences and learning's Gord Wall, Tenure Supervisor ESF Implementation Team Member.
0 eCPIC Admin Training: OMB Submission Packages and Annual Submissions These training materials are owned by the Federal Government. They can be used or.
FY 2011 Public Libraries Survey WebPLUS Software Training.
MINISTRY OF SUSTAINABLE RESOURCE MANAGEMENT 1 MSRM Vegetation Update Resource Information Business Area.
Vendor Bid System (VBS) Seminar. Agenda Vendor Bid System Overview Step-by-Step Advertisement Posting Editing Active Advertisements Recommended Practices.
NIMAC for Publishers & Vendors: Using the Excel to OPF Feature & Manually Uploading Files December 2015.
HEI/OCAN College Access Program Data Submissions.
EziLink™ RESULTS Training Session 2 – Hands On For the Ministry of Forests, Lands and Natural Resource Operations Please Log on to your DTS connection.
Summative Assessment Welcome We will wait a few minutes for participants to log on and call in. –Call in: –Pass code: *6 to.
GMAP Grant Management, Application, and Planning Consolidate Application Training.
SDA Formulas Online Webinar Please use the mute button or press #6 on your phones to mute the teleconference line If you have questions or technical problems.
How to Create eInvoices in SCP-RR Training Presentation for Supply Chain Platform: Rolls-Royce January 2016.
American Diploma Project Administrative Site Training.
How to complete and submit a Final Report through Mobility Tool+ Technical guidelines Authentication, Completion and Submission 1 Antonia Gogaki IT Officer.
CACI Proprietary Information | Date 1 PD² SR13 Client Upgrade Name: Semarria Rosemond Title: Systems Analyst, Lead Date: December 8, 2011.
1 Logging into the new PCard (PaymentNet) System: PAYMENTNET * Introduction * May use IE 8.0 or greater or Firefox * Do not.
RESULTS: A New Integrated Tool for Forest Stewardship John Gallimore, RPF Information Management Group Ministry of Forests ESF User Meeting December 9th,
American Diploma Project Administrative Site Training.
Finance Business Solutions – User Support & Training
American Diploma Project Administrative Site Training New Jersey.
Bulk Fuel,Gasoline and Diesel Event User Guide
To the ETS – PNG Continuation: Online Training Course
To the ETS – Encumbrance Online Training Course
To the ETS – Encumbrance Online Training Course
Presentation transcript:

Introduction to eziLink Training For the Ministry of Forests and Sustainable Resource Management

Overview of Session  Instruction on concepts  Hands-on exercises and examples  Troubleshooting  Questions and Answers

Training Objectives  At the end of the training, participants will be able to:  Use eziLink to create XML/GML files for Opening Definition, Disturbance, Silviculture Activity, Forest Cover Polygon and Milestone reporting,  Submit the XML/GML files through the ESF Submission System; and  Check for results of ESF submission and know where in eziLink to address any rejected submissions.

Agenda Introduction of Instructors and Students Introduction to e-Submission Concepts Introduction to the Basic Navigation in eziLink Opening, Changing and Saving Submissions Practice Exercises Creating a New Submission Practice Exercises

Section 1 - Introduction to e-Submission Concepts

Overview Free to Grow Met Submit* 3, 4, 5 PLANNING DEVELOPMENT HARVEST SILVICULTURE Approval to Harvest (Government) Block is Engineered/Costs (Licensee) Electronic - ECAS (Appraisal) FTA (Cut Permit) Site Plan (SP) NO NEED TO AMEND Silviculture Prescription (SP) MUST BE AMENDED Forest Stewardship Plan (FSP) Forest Development Plan (FDP) FRPA – Current Forest Range and Practices Act FPC – Legacy Forest Practices Code Hardcopy - ECAS (Appraisal) FTA (Cut Permit) Regen Met Submit* 3, 4, 5 FORM GROUP - FS708 FORM A = (Opening Definition-1) FORM B = (Disturbance - 2, Silviculture Activity – 4) FORM C = (Milestone 3, Forest Cover Polygon – 5) RESULTS 1 – Opening Definition 2 - Disturbance 3 - Milestone 4 – Silviculture Activity 5 – Forest Cover Polygon Submit* 1, 2, 3, 4, 5 Harvest Complete Free to Grow Survey Submit * 4, 5 Regen Survey Submit* 4, 5 RESULTSFTA / ECAS Amendments

Conceptual View of ESF Spatial Information Attribute Information Submission Document (XML/GML) Conversion or direct capture of data Upload of data to website Electronic Submission Framework ValidationVerification Information into operational systems RESULTS FTA ABR

eziLink in the ESF World Spatial Information Attribute Information Submission Document (XML/GML) Conversion or direct capture of data Upload of data to website Electronic Submission Framework ValidationVerification Information into operational systems RESULTS FTA ABR

What eziLink does...  Creates submission documents  Support for spatial and attributes  Entry or loading data for submission  Performs quality assurance of submissions  Provides Tools to support e-submission process  Uploading and status checking  Printing submission contents  FTA, RESULTS and ABR submissions

What eziLink Does Not Do...  Perform data management  Understand business rules associated with the submission  Replace mapping and business management systems

District Use of eziLink  Districts will use eziLink to create the submission documents  add attribute information to a submission  add clean spatial information to a submission  Quality assure and troubleshoot submissions

RESULTS Submission Process Load spatial data into eziLink Add attribute data Copy spatial data into submission Save the submission Upload the submission Automated Verification by Business Agents Create a new RESULTS submission Review and validate the submission Verification Errors, correct submission Validation errors on upload, correct submission Successful upload Choose type of Submission Statusing in RESULTS Repeat until accepted or rejected

RESULTS Submissions Supported  Opening Definition  Disturbance Reporting  Silviculture Activity Reporting  Forest Cover Polygon Reporting  Milestone Reporting

Section 2 - Introduction to Basics

Terminology  Feature  A real world thing represented in eziLink that can include spatial and non-spatial attributes  Item  Something that can be manipulated in eziLink (copied, pasted, edited)  Layer  a collection of spatial features that have a common theme and style

Starting Up eziLink

Initial Options on Start  Create A New Submission  Creates a new submission  Open An Existing Submission  Opens an FTA, RESULTS or ABR submission  Does not have to be created in eziLink  Load A Submission From a Database  Loads and links spatial data for management system  Search ESF for Previous Submissions  Searches based on user criteria

Overview of User Interface

Menus  File  File management and e-submission utilities  Edit  Selection and copy functions  View  Change spatial display  Change what is visible to the user

Menus  Layer  Functions for creating and working with spatial layers  Tools  Quality assurance tools  Tools to manipulate information  eziLink preferences  Window  Help

Toolbar File Management Create PDF Zoom/Pan Undo/Redo Select Warning/Errors Feature Info Measure Styles Attributes Editing Toolbox

Submission Window - Overview

 QA Category  Submission Content  Working Category  Internal eziLink Layers Category Submission Window - Categories

Submission Window - Menus  Right Click on Submission Component  Add components  Zoom and select feature  Paste Geometry  Change Styles

Submission Window - Menus  Right Click on Layers  Edit and modify Attributes  Save to new dataset  Move up/down in layer order  Cut, copy and remove layers

Exercises  Practice with starting eziLink, opening submissions, and working with the user interface.  Exercise 1, 2 & 3 from the Training Manual

New Submission Wizard  Guides you through the creation of a new submission  ‘Fill-in the blanks’ approach  Remembers the last values used  Shows the minimum required attributes

New Submission Wizard  Attributes can be entered, but spatial will be dealt with later in the process

Key Items for New Submissions  Things to have  Client number and contact information  Details about the submission to be made Is it an amendment?  Spatial data Format Projection of the source data Clearly identifies what spatial feature belongs with what attributes

Exercises  Practice with creating a new submission with all the attributes filled in for a new Opening Definition submission  Exercise 4 from the Training Manual  Exercise 5 (optional) provides details on the formatting and files that eziLink creates

RESULTS Submissions Create each of the following submissions.  Opening Definition  Disturbance  Activity  Activity – Planting  Forest Cover  Milestone

Section 3 - e-Submission Utilities and Services

e-Submission Utilities  Generate Land Use Report and Map  Generate PDF Report  Upload of Submission  Query of Submission Status  Management of Submission Details

TMS Reports  Check for existing land use conflicts prior to submitting to ESF  find conflicts sooner in process  Generates map and report from government server

PDF Report  Provides ability to print or save digital report of the submission being made  Includes attribute and map

Uploading Submission  Requires IDIR/BCeID with proper permissions  Allows eziLink to track information about submission  Error messages  TMS Reports  Submission IDs

Checking Status  Allows for search on status of uploads  Two approaches:  Search the ESF  Open and Check Submission Status  Provides details on messages

Exercises  Practice with uploading, searching ESF and generating PDF document  Exercise 20 & 19 from the Training Manual

Section 4 - Quality Assurance and Troubleshooting

Steps for Q/A  Ensure all minimum requirements are completed  no flags in the submission content window  Validate Layers that will be submitted  Checks on spatial topology and content  Visually inspect against WMS Layers  Looking for data not in correct location  Review attributes  Ensure that attributes make sense

Checking Minimum Requirements  Review the submission content window and ensure that warning flags are completely removed

Section 5 - Support

Support Resources  A wealth of self-help information available on the INCOSADA Project Website and through MSRM Support Desk  FAQ  Downloads  Telephone Support

Support Resources Address for Support Telephone Support (250)