Beam load estimates for the PS2 Beam Dump Systems T. Kramer, M. Benedikt, B. Goddard.

Slides:



Advertisements
Similar presentations
RAL 27 April 2006The beta-beam task, EURISOL1 Status of the beta-beam study Mats Lindroos on behalf of the EURISOL beta-beam task.
Advertisements

Alexandr Drozhdin March 16, 2005 MI-10 Injection.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.
PSB h- injection Layout issues –Are 3 or 4 KSW needed –Geometry of the injection –Element lengths and locations Element performance specifications H 0.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
Simultaneous Delivery of Parallel Proton Beams with the EURISOL Driver
Laser Stripping and H 0 monitor systems 10/18/2011B.Cheymol, E. Bravin, U. Raich, F. Roncarolo BE/BI1.
PS Booster Studies with High Intensity Beams Magdalena Kowalska supervised by Elena Benedetto Space Charge Collaboration Meeting May 2014.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
Radiation Protection considerations concerning a future SPS dump design Helmut Vincke DGS-RP.
First AWAKE dump calculations Helmut Vincke. Beam on dump Muon axis inside and outside CERN Distances: Beam impact point to end of West hall: ~300 m Beam.
Details of space charge calculations for J-PARC rings.
Crystal channeling 2009 A. Afonin, IHEP, Protvino New results of use and research of crystals at U-70. A.Afonin, IHEP, Protvino 4- th Crystal channeling.
NUFACT August 2014 E. Wildner, CERN 13/03/14Nufact14, Glasgow, E. Wildner 2 Accumulator Ring for the ESS Neutrino Super Beam.
Loss in TED Loss in magnet Loss in iron rod Assessment of the production of airborne radioactivity caused by various beam loss scenarios in the SPS.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
“Beam Losses” Christian Carli PSB H - Injection Review, 9 th November 2011 Several topics more or less related to beam losses, a study still somewhat at.
Specifications for PSB Injection System Upgrade C. Bracco, J. Abelleira on behalf of BTP Acknowledgments: E. Benedetto, C. Carli, V. Dimov, L.M. Feliciano,
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
MTE vs CT D.Manglunki for BE/OP - pictures from M.Giovannozzi - details in “Fifty years of the CERN Proton Synchrotron (Vol I)” CERN
Low Energy operation of RHIC AGS low energy extraction performance N. Tsoupas et. al. BNL.
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
1 Question to the 50GeV group 3GeV からの 54π と 81π 、 6.1π の関係 fast extraction 部の acceptance (81π?) Comments on neutrino beamline optics?
1 EMMA Tracking Studies Shinji Machida ASTeC/CCLRC/RAL 4 January, ffag/machida_ ppt & pdf.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
LIU Beam Parameter Working Group Meeting #1: Ion parameter table Outline: Where we are standing What we need to do (still in 2015)
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Beam collimation in the transfer line from 8 GeV linac to the Main Injector A. Drozhdin The beam transfer line from 8 GeV Linac to the Main Injector is.
Optimization of beam envelop at the injection point of PS Chenghui Yu Jan. 30, 2012.
Villars, 26 September Extra Low Energy Antiproton Ring (ELENA) for antiproton deceleration after the AD Pavel Belochitskii for the AD team On behalf.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
LHC Scrubbing Run 1 Day 3 (27/06/2015) Scrubbing team 28/06/2015.
1 SLHC-WP5 Progress Contributions from I. Dawson, L. Nicolas (U Birmingham), S. Pospisil (ITU Prague) T. Kramer, B. Goddard, M. Benedikt, Helmut.
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
RF separated beam and other beam issues Lau Gatignon, COMPASS workshop, 22 March 2016.
Optics considerations for PS2 October 4 th, 2007 CARE-HHH-APD BEAM’07 W. Bartmann, M. Benedikt, C. Carli, B. Goddard, S. Hancock, J.M. Jowett, A. Koschik,
Beam transfer considerations for LAGUNA Angelina Parfenova, W. Bartmann, L. Ducimetiere, B. Goddard, V.Kain, M.A. Kowalska, M. Meddahi, B. Puccio, F. Velotti.
Update on RF parameters A.Lachaize11 th HPPS design meeting04/09/13.
Fermilab Limited Scope Accelerator Readiness Review (ARR) October 1 -3, 2013 Technical Breakout Session 2A Radiological Safety for 700 kW Operations.
Recycler Injection with Carbon Foils Dave Johnson, Alexandr Drozhdin, Leonid Vorobiev September 8, 2010 Project X Collaboration Meeting.
PS2 beam parameters and proposal for aperture strategy M. Benedikt , PS2 meeting1Beams and apertures, M.Benedikt.
Chiara Di Paolo EN-STI-TCD Material Choice for the Vacuum Window at the Exit of BTM.
PS2 WG Injection and extraction systems Basics and assumptions
Parameters of ejected beam
Emergency dumping of proton and ion beams in SIS100 F
Electron Cooling Simulation For JLEIC
Emittance growth AT PS injection
Status of the beta-beam study
Final Focus Synchrotron Radiation
FCC hh dump kicker - switch topologies and impact on beam
Acknowledgments: LIU-PT members and deputies, H. Bartosik
CNGS Proton Beam: Introduction

Progress towards Pulsed Multi-MW CERN Proton Drivers
LEIR Presented by M. CHANEL PSDAYS: EVIAN 2001.
Generation of Higher Brightness Beams for LHC
I-LHC NOMINAL ions beam in 2007
First meeting of the LIS section: Welcome to the new members!!
PSB magnetic cycle 900 ms MeV to 2 GeV
FOLLOW-UP FOR THE TDI = LHC injection beam stopper
Presentation transcript:

Beam load estimates for the PS2 Beam Dump Systems T. Kramer, M. Benedikt, B. Goddard

T. Kramer AB-BT-TL2 Main PS2 design parameters and key assumptions for the dump load calculations Assumed 200 days of operation Maximum of 1.08 x protons /y All calculations are done in a rather conservative way Injection energy (T)GeV4 Extraction energy (T)GeV50 Maximum beam intensity p+p+ 1.5  Minimum cycle period to 50 GeVs2.4 Maximum norm.emittance (H-V) .mm.mrad Cycles per year7.200,000 Protons accelerated per year p+p  10 21

T. Kramer AB-BT-TL3 Dump functionalities Injection line setting up Fast injection setting up H- Injection Emergency abort Machine development Machine setting up Extraction line setting up Slow extraction ‘remaining beam’

T. Kramer AB-BT-TL4 H- Injection 6.4x10 19 p.a. 4 GeV details later…. Emergency beam abort assumed 0.5% of cycles dumped 5.4x10 18 (0.5%) particles p.a GeV) Machine setting up 6 days (2 per beam); 20% of full intensity 6.5x10 18 p.a. (0.6%) 4-20GeV) Machine development 100h p.a. 20% of full intensity 4.3x10 18 p.a. (0.4%) 4-20 GeV) Particles remaining after slow extraction Max. 1 % remaining particles; 50 GeV; operational 50% p.a.; 3.6s cycle 3.6x10 18 p.a. (0.33%) Fast injection setting up and failures 1 day p.a.; 20% dumped; 100 failures p.a. 1.08x10 18 p.a. 4 GeV Setting up of injection transfer line 4 days p.a.; 10% intensity; 20 foil exchange interventions; 3.06x10 18 p.a. 4 GeV Setting up of extraction transfer line 2 days p.a.; 30% intensity; 3.25x10 18 p.a. 50 GeV

T. Kramer AB-BT-TL5 Summary of beam loads FunctionE [GeV]Load [p + ] % of total Possible beam destinations Injection transfer line dump Internal fast injection dump Internal or external H - dump Internal or external emergency dump Injection line setting up43.1x X Fast injection setting up41.1x X H - injection losses46.4x X Emergency abort x X Machine development x X Machine setting up x X FunctionE [GeV]Load [p + ]% of total Possible beam destinations Internal or external emergency dump External beamline or transfer line dump Emergency abort x X Machine development x XX Machine setting up x XX Extraction line setting up503.3x X Slow extraction beam503.6x XX Table 1: Beam “high Energy” Table 2: Beam “low Energy”

T. Kramer AB-BT-TL6 External beam line dump PS2 extraction line dump TED External H- injection dump PS2 injection transfer line dump TED(s) Internal fast injection dump Internal emergency dump ? ? SPS TT12 EAs PS2 TT10 from SPL Schematic overview

T. Kramer AB-BT-TL7 Unstripped beam 2 kW unstripped H -,H 0 (5% efficiency) 5.4x10 19 p.a. (5%) Yearly startup 8x10 18 p.a. (0.75%) Setting up Injection systems / foil exchange 1.8x10 18 p.a. (0.16%) H - Injection - Beam Loads

T. Kramer AB-BT-TL8 H - Injection - extract beam back to TT10 Overview of PS2 H-Injection; B. Goddard; PS2 meeting; 05/2007

T. Kramer AB-BT-TL9 H - Injection - Factors of Influence Stripping efficiency Emittance dilution Foil heating To be considered: Lorentz Stripping H0 excited states Stripping efficiency Beam blow up Lifetime Temperature Foil thickness Beam load H 0 /H - Foil material Size, activation, position of the beam dump 5%5% <0,1 pi mm mrad Losses! Some optimization should be possible - studies

T. Kramer AB-BT-TL10 Internal emergency dump Possible solution (as proposed): Internal dump only takes the beam which really has to go there (8x GeV + 2.7x10 18 GeV p.a.) Whenever there is time to extract the beam safely a beam line dump is used (slow extraction, machine development. 5.5x GeV + 6.9x10 50GeV p.a. ) External dump at end of beamline in well-shielded EA zone? Advantages System is easier to build, cheaper, desirable from point of operations, “some internal dump” to set up the extraction is anyway needed Disadvantage For operations like in the SPS a very high beam load is expected - Radiation source within the machine

T. Kramer AB-BT-TL11 Summary of loads and issues PS2 dump Beam loads [p + /y] 4 GeV4-20 GeV20-50 GeV50 GeV 1. PS2 injection transfer line dump3.1x Internal fast injection dump1.1x External H - injection dump6.4x Internal emergency dump-8.2x x External beamline dump--5.5x x10 18 Issues Need for TEDs/beam stoppers at the end of transfer lines…including for ions and p+ from PSB before SPL comes on line. Configuration for injection and extraction region….becoming congested. Extraction and dumping of unstripped H - beam (acceptance, losses, …) Optimization of losses for H - injection? Studies need to be done… Conservative calculation to keep the highest degree of freedom; If we have serious problems concerning feasibility (costs) we have to define more accurate operations and design parameters and look into detail again.