BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Construction Explanation.
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Roof Framing A Quick Primer
Gable Roofs and Components
Ceilings & Basic Roofing
The Right Angled Triangles in a Hipped Roof M. S. Martin May 2007 reviewed April 2010.
Roof Construction By Drew Kelly Roof Construction Basics  Roof construction is the single most important structure on your home  Roofs provide.
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
Gable Roof BCGCA3007B.
Competency: Draw Wall Sections
Gable Roof BCGCA3007B.
Click on this image to open the full PDF document.
Stadium Roof Design - S2 : Stadium Roof Design - Emirates Stadium Structural Analysis.
Roofing.
Unit 49 Intersecting Roofs
Basic Roof Types and Roof Theory
Architectural CAD I – IM230
Design and drawing of RC Structures CV61
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Competency: Draw roof plans
Roof Framing Unit 33.
Gable Roof BCGCA3007B. Gable Roof Flush with no eaves Flush with raked eaves Boxed.
HIP RAFTER THEORY AND SAMPLE CALCULATIONS
Gable, Gambrel, and Shed Roofs
Pattern Rafters & Calculations
Hip Rafters • Hip Jack Rafters • Constructing Hip Roofs
DESIGN OF TRUSS ROOF Chapter 7
Competency: Draw roof plans
General idea of a couple of check rod system and adjustments
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
Copyright 2006 The National Association of Certified Home Inspectors
You will learn to solve problems that involve the perimeters and areas of rectangles and parallelograms.
Plain & Reinforced Concrete-1 CE-313
Wall and Ceiling Construction
Flat Roofs & Introduction to Gable Roofs Ref: M. S. Martin / March 2004 / Reviewed & Combined March 2007.
Roof and Ceiling Framing
Gable Roof BCGCA3007B.
BUILDING THE FRAME Walls are constructed in sections, lying down on the floor platform and then tilted up into position. Fundamentals of Building Construction,
TOTAL SPECIFICATIONS OF STEEL STRUCTURE PRODUCT INFORMATION SHEET Safety rating of this project is Grade 2, and the reasonable life span of this project.
Tulkarem Multipurpose Sport Hall Prepared by: Moatasem Ghanim Abdul-Rahman Alsaabneh Malek Salatneh Supervisor: Dr. Shaker Albitar.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
14.52 in Attach the Axle to the chassis using the four (4) bolts, washers, and nylon lock nuts. Mount the tires. Note: The wheel recess outside on the.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
Designing and constructing a traditional half span hipped end roof  Roof to a domestic extension.
Estimating Hip Roofs.
CESL Hotel Unique – Toronto Chris O’Brien Eric Fraser Scotia Mabury
Calculations D. Smargianaki 29/04/2015 LBNF. Outline D. Smargianaki(CERN) 2 29/04/2015 Comparison between Single Beam & Beam with Spliced connections.
Drafting 2 (Arch) Quiz Review #5
PRESENTED BY: Al Cobb, Founder, Sips School CHAPTER 5 OF 10 SIP Layout Drawings SPONSORED BY:
Pitched Roof By PATEL ANKITKUMAR H.
ROOFING BCGCA3007B.
Solving word Problems.
Structural Considerations for Trusses
Framing Agriculture Structures
Flex Series & View Series
Gable Roof BCGCA3007B.
Roofs: Types of roofs, Trussed roofs, Steel roof truss
Framing Agriculture Structures
Competency: Draw roof plans
Competency: Draw roof plans
بسم الله الرحمن الرحيم An-Najah National University
Utility Shed Construction
Structural Loading.
Neutron guide Shielding Concept
Utility Shed Construction
Structural Loading.
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg.
Where to Use Warning Lines
Competency: Draw roof plans
Presentation transcript:

BEAM SPIGOTS connected to one DeltaBeam

DOUBLE GUARDRAIL connected to the DeltaBeam

DOUBLE GUARDRAIL FOR RIDGE BEAM installed

…guide the Tube through the End-pocket of the Sheet to the opposite side…

…… or only one. It depends of the length of the sheet.

Lead the Sheet-bolt into the CORNER BEAM FOR SHEET and….

….pull the Sheet trough the CORNER BEAM FOR SHEET

Secure the CORNER BEAM FOR SHEET with the Lock Bolts for BEAM SPIGOTS

Install the ADJUSTABLE PIPE WITH COUPLERS to the CORNER BEAM FOR SHEET and…

Install a standard Steel- or Alupipe through the couplers and ….

….all the way through the next ADJUSTABLE PIPE WITH COUPLERS

THE COVERED ROOF IS FINISHED

The temporary calculations shows that we can build a roof with free span-width of 23.5 m. (Third parts verification of the calculations remain) The snow load is 0.75 kN/m 2 and the wind load is 0.64 kN/m 2 (32 m/s).

Both end (gable) bays full of GUARDRAILS and DIAGONALS while the rest is as shown below. Four bays without DIAGONALS then one with, and so on.

To increase the span width we can use a TIE BEAM…

…or build it up like this.

Another way to build a Roof.

Use the DB750 Covering System to build a HALL Section View

Use the DB750 Covering System to build a HALL Isometric View