BEAM SPIGOTS connected to one DeltaBeam
DOUBLE GUARDRAIL connected to the DeltaBeam
DOUBLE GUARDRAIL FOR RIDGE BEAM installed
…guide the Tube through the End-pocket of the Sheet to the opposite side…
…… or only one. It depends of the length of the sheet.
Lead the Sheet-bolt into the CORNER BEAM FOR SHEET and….
….pull the Sheet trough the CORNER BEAM FOR SHEET
Secure the CORNER BEAM FOR SHEET with the Lock Bolts for BEAM SPIGOTS
Install the ADJUSTABLE PIPE WITH COUPLERS to the CORNER BEAM FOR SHEET and…
Install a standard Steel- or Alupipe through the couplers and ….
….all the way through the next ADJUSTABLE PIPE WITH COUPLERS
THE COVERED ROOF IS FINISHED
The temporary calculations shows that we can build a roof with free span-width of 23.5 m. (Third parts verification of the calculations remain) The snow load is 0.75 kN/m 2 and the wind load is 0.64 kN/m 2 (32 m/s).
Both end (gable) bays full of GUARDRAILS and DIAGONALS while the rest is as shown below. Four bays without DIAGONALS then one with, and so on.
To increase the span width we can use a TIE BEAM…
…or build it up like this.
Another way to build a Roof.
Use the DB750 Covering System to build a HALL Section View
Use the DB750 Covering System to build a HALL Isometric View