CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013.

Slides:



Advertisements
Similar presentations
Status of Extensible SCCS-SM Concept Green Book 12 February
Advertisements

09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
1 24 April 2009 SMWG SMWG Closing Report Colorado Springs, Colorado, USA 24 April 2009.
7-Apr-2014-cesg-1 Joint CMC-CESG Meeting NH Conference Centre, Nordwijkerhout, Netherlands Hosted by ESA/ESTEC 7 April 2014 CCSDS Engineering Steering.
CCSDS XML Telemetric and Command Exchange (XTCE)
Security WG: Report of the Winter 2007 Meeting Colorado Springs, CO USA January 20, 2007 Howard Weiss NASA/JPL/SPARTA
CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.
CCSDS Security WG Management Remarks Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > www.DLR.de/rb Slide 1.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
CSSM Meeting Summary Spring 2013 Meetings 15 – 18 April E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Bordeaux, France.
31 st October – 4 th November 2011 Fall 2011 Meeting Agenda Boulder, Colorado, USA SOIS Application Support Services WG Conclusions & Actions.
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
CSSM Meeting Summary CCSDS CSSM Technical Meetings London, UK 10 – 14 November 2014.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
2010 Fall CCSDS meeting SMWG UK ) 1 Prototype Test Coordination for the SCCS Service Management (B-1) 26th October, 2010 JAXA ASAMA
System Engineering Area SANA BoF Kick-Off 12 May 2004 Peter Shames NASA/JPL.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
Overview of Functional Resources for IOAG Service Catalog Services 15 April 2013 Bordeaux, France John Pietras Global Science and Technology, Inc., Greenbelt,
CSSM Meeting Summary CCSDS CSSM Technical Meetings Pasadena, CA USA 23 – 27 March 2015.
Cesg-1 CSS Area Report -- Super BOF Background From A. Hooke to CESG: (CSS AD emphasis ) Date: Fri 02 Oct 2009 To: CESG cc: CMC Subject: Proposed.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 10) StatusComment ProgressGood Progress overall, especially on the.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Spring 2009 Meeting Takahiro Yamada (JAXA/ISAS) 25 April.
Configuration Profile Development Approach Bakeoff: Build Up Results CCSDS Spring Workshop Pasadena, CA March 2015 Anthony Crowson Telespazio VEGA.
IPR WG REPORT November Information Packaging and Registries WG REPORT November 2004.
CCSDS SOIS Wireless Working Group (WWG) 01-Sep-2015 Monthly Webcon/Telecon 1 CCSDS SOIS Wireless WG Monthly Webcon: 01-Sep Sep-2015.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
2009 Spring CCSDS meeting ( Colorado Springs,USA ) SMWG 1 Validation Test Coordination for the SCCS Service Management (R-3.4) 20. April 2009 JAXA YAGI.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 6) StatusComment ProgressGood Progress overall, especially on the.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
Ty - 1 Space Communication Cross Support Architecture WG Closing Plenary Report Spring 2011 Meeting Takahiro Yamada (JAXA/ISAS) 20 May May 2011.
CCSDS SOIS Wireless Working Group (WWG) 04-Aug-2015 Monthly Webcon/Telecon 1 CCSDS SOIS Wireless WG Monthly Webcon: 04-Aug New ESA Wireless WG member.
Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham
Discussion Outline 1.RFID Tag-Encoding Blue Book updates to respond to CESG RIDs A.KKG observations and suggestions re: Peter Shames, SANA registries i.ISS.
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
Panel P1J: Navigation Data October 2002 CCSDS P1J Status Report Fall Meeting, Houston, Texas Dates: Oct 1-4, 2002 Felipe Flores-Amaya NASA/GSFC/Code 453/Code.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
1 12 March 2008 JPL/DSN/CSSXP Overview and Findings JPL/DSN/CSSXP Overview and Findings Crystal City, USA 12 March 2008 Erik Barkley (JPL)
1 CCSDS Security Working Group Spring 2011 Meeting May 2011 Deutsches Institut für Normung (DIN) Berlin, Germany Howard Weiss NASA/JPL.
1 Systems Architecture WG: Charter and Work Plan October 23, 2003 Takahiro Yamada, JAXA/ISAS.
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
CSA WG Meeting 17 May 2011 Page 1 Berlin, Germany CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
DSN CCSDS SLE SM Prototype Plan Erik Barkley December 2006.
CMC meeting, 23 October, 2008 Page 1 JAXA CCSDS Status October, 2008 CMC Meeting DIN, Berlin, Germany Kaneaki Narita JAXA CCSDS Secretary Office.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
Spacecraft Monitor & Control Working Group (SM&C WG) CCSDS SM&C WG.
Fall Meeting, November 11, 2015 Paul Pechkam, JPL/NASA
CMC meeting, Nov., 2009 Page 1 JAXA CCSDS Status November, 2009 ESA/ESTEC Noordwijk, Netherlands Kaneaki Narita JAXA CCSDS Secretary Office.
CSSM Meeting Summary CCSDS CSSM Technical Meetings Cleveland, Ohio, USA 04 – 08 April 2016.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
19-May-2015-cesg-1 CESG Spring 2015: Project Schedule & Resources.
Wireless WG Monthly Teleconference
CCSDS SOIS Wireless WG Monthly Webcon: 04-Aug-2015
Security WG: Status Briefing
Systems Architecture WG: Charter and Work Plan
Wireless WG Monthly Teleconference
Wireless WG Monthly Teleconference
Security WG: Report of the Fall 2013 Meeting
CWE File Structure.
Delta-DOR WG: Report of the Fall 2010 Meeting
JAXA CCSDS Secretary Office
Portfolio Management Process & Customer Request Management
Presentation transcript:

CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013

Concept Book Reviewed Updates/re-writes identified Incl re-structuring to align with executive summary recently developed Project submission to secretariat by 31 Jan 2014

Schedule of Services (BB Track) Reviewed Needs an ICS – to be included Project submission to secretariat as R1 for agency review by 31 Jan 2014 Prototyping Test Plan to be updated for available resources test case (unused time publication) Testing to be completed by 11/30/13 Prototype test report to be ready by 31 Jan 2014 Question of ground station and mission IDs for SANA registry raised There are no such registries currently in SANA

Configuration Profile/Service Agreement Reviewed Concepts/Functional Resources, Extensibility Mechanisms Working issue of how much extensibility to expose vs pre-cooked configuration profile to meet major use cases - E.g., service delivered via CCSDS 401 vs 415 vs optical schemes/spacelink protocols Action for Spring meetings is to apply service catalog against catalog 1 and determine number of functional resource combinations to help inform how much extensibility to expose and also validate FR concept (See next two slides for FG/FR overview)

SCCS Functional Groups

Functional Resource Map

Service Request/Service Package Reviewed concept/approach Agreed to work on analysis for Spring 2014 mtgs deducing service request/service package specific extensibility needs Work boundary issues between schedule of services and service package - But not at the expense of producing SoS R1

Planning Information Separated input (mission constraints) from output data format considerations (network induced communications geometry constraints) Agreed to take work analysis for Spring 2014 mtgs Comparing agency inputs re geometric calculations - E.g, CNES “Station Plan” vs. ESA “Standing Orders” and “Orbit Event Files” vs NASA “Viewperiods”, “PSATs”, etc Prioritize output format re geometric calculations “visibilities” in accord with stated IOAG priorities (see April 2012 report to CMC).

DDOR WG Joint Meeting DDOR WG presented overview of DDOR service Presentation in CWE DDOR WG agreed to review draft Schedule of Services (aka Simple Schedule) Some preliminary assessment done re configuration profile and DDOR services config profile -- there are standard and also variable scan patterns (e.g, quasar-spacecraft-quasar) dwell times vary (not standardized) no standard correlator vs producer vs consumer patterns

Blue-1 Test Report Copy of consolidated, updated B1 test report from JAXA received and gratefully acknowledged NASA commits to updating the consolidated document for release

Not Addressed at Mtg (Relative to Agenda) Event Sequence book draft outline Trajectory Prediction book draft outline

Longer term project definitions Current projects updated re revised milestone dates Also agency commitments updated/noted where possible Two new projects defined in CWE Trajectory prediction Management services (service management automation)

Plan for next 6 months Green Book to Secretariat – Jan 2014 SoS R1 to Secretariat – Jan 2014 SoS Prototyping Completed -- Dec 2013 SoS Prototype Test Report -- Dec 2013 Planning Information preliminary draft – Feb 2014 IOAG SC 1 Analysis re config profile combos – Mar 2014 Service Request/Package extensibility structuring analysis – Mar 2014 Event Sequence engineering concepts – Mar 2014 Telecon Schedule Identified: T1: 19 November 2013 T2: 10 December 2013 T3: 14 January 2013 T4: 28 January 2014 T5: 18 February 2014 T6: 04 March

Thank you Thank you to Participants for traveling to and contributing to productive meetings Southwest Research Institute for excellent meeting facilities