Value Stream Management

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Lean vs. Six Sigma Lean vs. Six Sigma.
Introduction to Lean. Benefits of Lean Why go Lean? Improvements in: –Customer service –Quality and efficiency –Staff morale –Internal communication and.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
JIT, TPS, and Lean Operations
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
Just-In-Time and Lean Systems
Operations Management and Quality
Lean Operations (JIT) Module
JIT and Lean Operations
JIT/Lean Production Chapter 13.
Basics of Lean How to See and Eliminate Waste Slides courtesy of Doug Fingles, MERC.
The Value of Lean Thinking Presented by: Brian D Krichbaum Process Coaching Incorporated.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
Lean Office Overview (Sample Slides) Superfactory Excellence Program™
Operations Management
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
International Business 9e
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 8 Lean Systems McGraw-Hill/Irwin.
JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Define Just-in-Time.
Lean and Clean—Friend or Foe? Great Lakes Regional Pollution Prevention Roundtable.
Tools To Make Waste Visible. 2 FOR INTERNAL USE ONLY Module Objectives By the end of this module, the participant should be able to:  Develop a Spaghetti.
Partnering and Collaborative Working An Introduction Dr Neil Jarrett.
COPYRIGHT © RAYTHEON. ALL RIGHTS RESERVED. 4/2004 Customer Success Is Our Mission Raytheon Six Sigma The Boldness to Imagine the Future The Passion.
The Seven Deadly Wastes Course Objectives Learn what the Seven Deadly Wastes are and how they affect our business. Identify the Waste in our business and.
Perencanaan Produksi Harian Case #2 One Piece Flow Kuliah 4 LSiPro – FT Untirta Muhammad Adha Ilhami.
Value Analysis/ Flow Analysis
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
1 Introduction to Value Stream Mapping & Management Major Mark McNabb, USAF.
Managing by value stream
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Costing and the Value Chain Chapter 18.
Philosophy and Key Concepts
JUST IN TIME Operational Systems for Manufacturing… JIT and Lean Production.
Lean Manufacturing Chapter 15 pp June 29, 2012.
27 Lean Principles, Lean Accounting, and Activity Analysis
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
“Without the Cost of Waste …”
Lean Accounting and Productivity Measurement
Global Production, Outsourcing, and Logistics
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Supplier Development project Tools for supplier development Inspiration for tools to be used in workshops.
COSTING AND THE VALUE CHAIN CHAPTER 18 PAGE# 794 Faisal
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
Chapter 5 Value Stream Mapping. IT-465 Lean Manufacturing2 What is VSM? It is a method of creating a “one page picture” of all of the processes that occur.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
© BMA Inc All rights reserved. The Value Stream Managing by value stream.
Teamwork Presentation on JUST IN TIME” METHOD World Wide Science, Online MBA Program 25 June 2011 Head of Group: Head of Group: Ahmad Shikeb Farazi Ahmad.
Copyright © 2013 Nelson Education Ltd. PowerPoint Presentations for Cornerstones of Cost Accounting First Canadian Edition Adapted by George Gekas Ryerson.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
16 - 1© 2011 Pearson Education 16 JIT, Lean Operations, and the Toyota Production System PowerPoint presentation to accompany Heizer and Render Operations.
Choosing Lean Manufacturing Presented to you by : Vrunda Consultancy Service, Ahmedabad.
Lean Manufacturing. Lean Enterprise - A business system for organizing and managing product development, operations, suppliers and customer relations.
Lean Production Strategy Lean Manufacturing Strategy
JIT/Lean Production Chapter 13.
Introduction to Value Stream Mapping & Management
Lean Manufacturing Series
Chapter 27 Cost Management for Just-in-Time Environments
Lean Manufacturing Basic Overview XYZ Company.
Lean vs. Six Sigma Lean vs. Six Sigma.
Crafting Your Lean Transformation
Operations Management
Pricing your Products to be Profitable
Chapter 2 Office and knowledge work
Welcome to my presentation
Lean vs. Six Sigma Lean vs. Six Sigma.
Presentation transcript:

Value Stream Management Principles of Lean

Value Stream Management Value Stream Management is NOT just Lean Manufacturing! Value Stream = the set of all actions required to bring a product or service (or combination) through three critical business processes: Problem solving task—running from conception to commercialization of the product or service Information management task—forecasting, demand planning, order taking, master scheduling, etc. of the product or service Physical transformation—proceeding from materials or assemblies to final product Value Stream Management creates a Lean Enterprise (adapted from Lean Thinking-Womack and Jones) (slide name here) 2 .PPT

Key Principles of VSM Thinking Value Stream Management Specify value in the eyes of the customer. Identify the Value Stream for each product—this can be goods, information, services, critical business process, etc. Make value flow without interruptions. Reduce defects in products and deficiencies in processes. Let customers pull value. Pursue perfection. Drive out variation (short and long term). (adapted from Lean Thinking-Womack and Jones) (slide name here) 3 .PPT

VSM is used to win in the marketplace and drive business performance. The VSM Mission Value Stream Management Value Stream Management Creates: The safest system The shortest possible lead times The optimum level of inventory The highest practical customer order service levels The highest possible quality (low defect rate) The lowest possible waste (low cost) …throughout the entire supply chain VSM is used to win in the marketplace and drive business performance. (slide name here) 4 .PPT

What Does This Mean for Companies? Value Stream Management Cutting inventories by 90% Improving on-time delivery to >98% Reducing lead time from months to days Providing more and more value to customers, and getting paid for it Creating greater profitability and expanded customer acceptance of products Protecting jobs and establishing a rewarding work environment for employees (slide name here) 5 .PPT

How Can Companies Do This? Value Stream Management Synchronize Processes Internally Externally To the “beat” of the customer’s requirements Drive Out Waste Time Material Labor Space Motion Reduce and Manage Variation Improve Safety (slide name here) 6 .PPT

Value is created by the customer This is why a producer exists What Is Value? Value Stream Management VSM starts with defining value in terms of products and capabilities provided to the customer—at the right time and appropriate place. Value is created by the customer This is why a producer exists (slide name here) 7 .PPT

What is a Value Stream? Inputs Module Supplier Module Customer Module Value Stream Management Inputs Module Supplier Module Customer Module Process Module Outputs Module The Value Stream All the activities required to bring a product from conception to commercialization Includes detailed design, order taking, scheduling, processing, and delivery Understanding the value stream allows one to see value-added steps, non-value added steps, and non-value added but needed steps (slide name here) 8 .PPT

Defining Values of VSM Value Stream Management Value Added Activity: An activity that transforms or shapes material or information to meet customer requirements. Non-value Added Activity: Those activities that utilize time or resources, but do not add value to the customer’s requirement (but maybe to meet company requirements). (slide name here) 9 .PPT

The Eight Deadly Wastes (continued) Value Stream Management Overproduction—making or doing more than is required or earlier than needed. Waiting—for information, materials, people, maintenance, etc. Transport—moving people or goods around or between sites. Poor process design—too many/too few steps, non- standardization, inspection rather than prevention, etc. Inventory—raw materials, work-in-progress, finished goods, papers, electronic files, etc. Motion—inefficient layouts or poor ergonomics at work-stations or in offices. Defects—errors, scrap, rework, non-conformance. Underutilized personnel, resources, and creativity—ideas that are not listened to, skills that are not utilized. adapted from Taiichi Ohno How to Identify the Eight Wastes Overproduction—making or doing more than is required or earlier than needed What is the minimum quantity the customer needs? What is the minimum order quantity or lot size? Waiting—for information, materials, people, maintenance, etc. Any wait-time is waste. Look to eliminate or minimize by ensuring that items arrive only when they are truly needed. Transport—moving people or goods around or between sites Although some is necessary, this is also pure waste. Calculate the amount of travel distance and number of times items, materials, and WIP are moved per day (Spaghetti Diagram). Look to minimize distance or number of daily moves. Poor process design—too many/too few steps, non-standardization, inspection rather than prevention, etc. This is attacked through VA/NVA analysis. U-shaped cells and moving areas in close proximity. Standardize on a size (i.e. using same screw size for all assemblies). Design to eliminate inspection. Inventory—work-in-progress, papers, electronic files, etc. Calculate days of supply for all goods. Understand how long it takes to replenish each item (more frequent supplies means less inventory). Develop strategy for the amount of supply to keep. Monitor and measure. Motion—inefficient layouts at workstations; poor ergonomics in offices Motion requires detailed analysis of movements. Defects—errors, scrap, rework, non-conformance Any defect is waste. Use Pareto Analysis to identify key defect reasons. Need to understand causes of the errors—use cause-effect diagram. Look to eliminate all causes through mistake proofing. Underutilized personnel resources and creativity—ideas that are not listened to, skills that are not utilized Remember, that everyone can contribute. (slide name here) 10 .PPT