European Best Practice for industrial Disaster Risk Management (iDRM) Christian Jochum InWEnt Senior Advisor (www.inwent.org)

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
Continuity of Operations (COOP) Awareness Training
Risk Analysis For: ES-317Y and ES Plant Design Project at UWO By: R.A. Hawrelak, P.Eng. - Lecturer Dept of Chem & Biochem Eng’g Dow Chemical –
Development of Tools for Risk Assessment and Risk Communication for Hydrogen Applications By Angunn Engebø and Espen Funnemark, DNV ICHS, Pisa 09. September.
Implementation of the Seveso II Directive 96/82/EC Institutional Strengthening of the Slovak Environmental Agency Emergency Response Principles and Practice.
FACILITY SAFETY: Creating a Safe and Secure Environment in the Community Health Center Presented by Steve Wilder, BA, CHSP, STS Sorensen, Wilder & Associates.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Health and Safety - an update Ian Gillett Safety Director.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
Alexander Brandl ERHS 561 Emergency Response Environmental and Radiological Health Sciences.
Understanding the management of risks to health and safety on the premises of a retail business Unit 352.
Seite 1 ©Prof. Jochum Emergency Management: Assessing Risks and Improving Emergency Preparedness especially in Existing Chemical Plants Prof. Dr. Christian.
ENVIRONMENTAL MANAGEMENT SYSTEMS. ENVIRONMENTAL ISSUES Global Warming Climate Change Ozone Layer Resource Depletion Population Growth Waste Disposal Effects.
Conference Report – part 1.  Total number of selected abstracts – 19  Total Number Presented – 6.
“ Hard work and concern for the society is the key to success ” - O P Jindal On-site and Off-site Emergency Plans Based on Integral Risk Management – Key.
IS Audit Function Knowledge
The Australian/New Zealand Standard on Risk Management
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Regulatory Body MODIFIED Day 8 – Lecture 3.
1 Regulatory Challenges During and Following a Major Safety or Security Event Muhammad Iqbal Pakistan Nuclear Regulatory Authority Presentation at General.
Health and Safety.
Protection Against Occupational Exposure
Process Safety Management
1 CHCOHS312A Follow safety procedures for direct care work.
Seveso II in the UK Mark Maleham tel + 44 (0)
International Health and Safety at Work
EHS Management System Elements
InWEnt | Qualified to shape the future Reducing the Risk of Chemical Clusters by Formation of Chemical Parks Christian Jochum, Prof. Dr. InWEnt Senior.
Process Safety Management
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
Basics of OHSAS Occupational Health & Safety Management System
Seite 1 ©Prof. Jochum Capacity Development Programme in Industrial Disaster Risk Management Crisis Management: Avoiding and Mitigating Major Accidents.
Ert 312 LECTURE 4 OSHA & DOSH.
Emergency Planning Steps 5 steps in emergency planning Step 1: Establish a team Step 2: Analyze capabilities and hazards Step 3: Conduct vulnerability.
European Best Practice for industrial Disaster Risk Management (iDRM) Christian Jochum InWEnt Senior Advisor (
Occupational Safety and Health 6 th Edition Lecture Notes By: Dr. David Goetsch.
Hazards and Disaster Management
Safety and Risk The perspective of a Researcher Dr. Michalis Christou - Joint Research Centre E.U. and Richard Gowland – Director European Process Safety.
Layers of Protection Analysis
InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory.
Securing Critical Chemical Assets: The Responsible Care ® Security Code Protection of Hazardous Installations from Intentional Adversary Acts European.
Are You Ready for an SIS? What to do before starting on your SIS…and after it’s installed March 24, 2009.
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Experiences off the Netherlands with the the implementation of the Seveso Council-2 Directive : Learning lessons for Slovakia Theo de Gelder Dutch Ministry.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
Hazard Analysis. 2 Lecture Topics Hazards and Accidents Hazard Analysis.
International Recovery Forum 2014 ~ The Role of Private Sector in Disaster Recovery ~ 21 January 2014 Kobe, Japan Dr Janet L. Asherson THE LINK BETWEEN.
Health Emergency Risk Management Pir Mohammad Paya MD, MPH,DCBHD Senior Technical Specialist Public Health in Emergencies Asian Disaster Preparedness Center.
SAFETY MANAGEMENT SYSTEM IN TURKISH STATE RAILWAYS (TCDD)
International Security Management Standards. BS ISO/IEC 17799:2005 BS ISO/IEC 27001:2005 First edition – ISO/IEC 17799:2000 Second edition ISO/IEC 17799:2005.
The Risk Management Process
Seveso II Review Stakeholder Consultation Meeting EPSC Position Richard Gowland Technical Director Manchester March
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Defence in Depth Safety Culture Lecturer.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
Swedish Risk Management System Internal management and control Aiming to Transport Administration with reasonable certainty to.
Trade union policy and strategy regarding support and coordination of Workers’ Reps in H&S – from European to national model Emiliya Dimitrova CITUB
RISK MANAGEMENT FOR COMMUNITY EVENTS. Today’s Session Risk Management – why is it important? Risk Management and Risk Assessment concepts Steps in the.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Business Continuity Planning 101
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Risk Assessment: A Practical Guide to Assessing Operational Risk
SYSTEM SAFETY AND THE TECHNICAL AUTHOR
HSE Case: Risk Based Approach.
The Role of Land-use Planning in Chemical Disaster Risk Management
Emergency Planning Steps
ASSESSING THE ENVIRONMENTAL CONSEQUENCE OF POTENTIAL MAJOR ACCIDENTS
Securing Critical Chemical Assets: The Responsible Care® Security Code
Presentation transcript:

European Best Practice for industrial Disaster Risk Management (iDRM) Christian Jochum InWEnt Senior Advisor ( Director of Centre, European Process Safety Centre ( Chairman, German Commission on Process Safety ( India, September 2010

Professional Profile Christian Jochum –Born 1943 in Frankfurt a.M./Germany –PhD in Chemistry, certified Safety Engineer –Honorary Professor at Frankfurt University –28 years experience in large chemical/pharmaceutical company (Hoechst AG) 1969 – 1979 Pharmaceutical research and pilot plant operations 1979 – 1997 Safety department (Site and Corporate Safety Director and „Major Accident Officer“ since 1987) –EHS – and crisis management consulting for different types of businesses and administration since 1997 –Commission on Process Safety (formerly Major Hazard Commission) at the German Federal Minister for the Environment (Chairman since 1998) –European Process Safety Centre (Rugby/UK): Director of Centre since 2007 –InWEnt Senior Advisor since

EPSC (European Process Safety Centre) Industry funded association of major chemical companies in Europe. Approx. 40 contributing enterprises Dedicated to sharing and improving best practice in Chemical Process Safety Study groups on –Safety Critical Systems (inc. IEC 61511) –Buncefield type facilities overfill protection –Layer of Protection Analysis (LOPA) –Auditing –Process Safety Incident and KPI reporting –ATEX –Senior Management Commitment Work in conjunction with European Commission on implementation and upgrading Seveso 2 Directive Partnerships with CEFIC (European Chemical Industry Council) and U.S. Center for Chemical Process Safety (CCPS) 3

Mandated by the Federal Emission Control Act –Advises government as well as plant operators and state and local authorities on process safety –32 members with different professional and educational background representing different stakeholders (“Round Table”) –Any group needs “allies” to win votes –Consensus intended, but majority decisions possible About 55 guidelines issued on different topics, e.g. –Land Use Planning (Safety distances) –Risk evaluation and perception –Emergency Planning –Industrial parks –Provisions against terrorist attacks on chemical plants All publications of the Commission are available (partly in English) at Commission on Process Safety (Kommission fuer Anlagensicherheit [KAS]) 4

Outline 1 1 iDRM Approach in Europe Best Practice of Emergency Management 3 3 Risk Management Principles 2 2 Conclusions 4 4 5

The drivers for Process Safety and industrial Disaster Risk Management (iDRM) in Europe are Lessons learnt (Bhopal, Seveso, Toulouse, Texas City, Buncefield, Jaipur,...) Ethical dimension (Responsible Care (R)) Seveso 2, OSHA PSM National Standards Industry benchmarking (Major Hazard record of industry) Economics (Business Continuity) 6

iDRM basic principle Crisis management assessment should cover all parts of emergency- and crisis- management... identify hazards comprehensively... pursuing the goal to define and train as much as possible in advance avoid or control risks communicate remaining risks mitigate consequences remediate damages restore trust 7

Outline 1 1 iDRM Approach in Europe Best Practice of Emergency Management 3 3 Risk Management Principles 2 2 Conclusions 4 4 8

9 Prevention This map is common, you will see it again Risk is a combination of HAZARD Severity and FREQUENCY or LIKELIHOOD Mitigation

Risk Review Requirements The risk review process has to be determined by all relevant stakeholders/departments of the organisation in writing (company guideline) shared with authorities etc. defining the risk review team (multi-disciplinary including operator level) defining milestones for and different levels of risk review (e.g. Design phase, pre-commissioning, pre-start up, changes, etc) 10

What the client ordered How the project mgr. understood it How it was planned by the engineer How it was implemented by the technicians How the consultant interpreted it How it was documented How it was eventually built What was charged To the client What the client really wanted What was subject of the service agreement Design, Build and Operate 11

Hazard Identification All hazards have to be identified comprehensively and systematically... eg. „classical“ EHS-hazards, loss of production,... Operation hazards Network hazards Environmental hazards eg. failure of utilities, supplies, transportation... eg. natural hazards, adjacent plants and traffic ways,... eg. densely populated areas/buildings, natural reserves,... Environmental vulnerability eg. plant vulnerability, neighbourhood/environment sensitivity, company image,... Terrorist threats... by e.g. “What if”, checklists, HAZOP, FMEA etc. 12

Risk Assessment Risk is a combination of hazard Severity and Likelihood or frequency, often expressed as R=f(S,L) Severity may be determined by Gas dispersion in combination with criteria for human effects such as: ERPGs (Emergency Response Planning Guidelines) AEGLs (Acute Exposure Guideline Levels) Explosion Overpressure and Fire radiation effects using tools such as: TNO methodology FLACS Likelihood may be estimated by expert opinion/experience databases for failure frequencies (semi-) quantitative assessments (risk graph, fault or event trees etc.) Assessment of safety barriers and mitigation (e.g. “bow tie” diagram, Layer of Protection Analysis = LOPA) 13

‘Bow Tie’ Diagram 14

Plant Emergency Response Physical Protection e.g. Relief Devices Safety Instrumented System preventative action Critical Alarms and Operator intervention Basic Process Control System, Operating Discipline / Supervision Plant Design integrity Community Emergency Response The LOPA “Onion” 15

16 Protection Layer Concept

LOPA criteria -1- Initiating events Control system failures Human error Piping and equipment failures Interruption of utilities (e.g. Cooling) Enabling Events/conditions e.g. proportion of time when hazard may be present Independent layers of protection Basic Process Control System (possibly) Alarm and operator response Relief systems Safety Instrumented Systems Other qualifying Safety Related Protection Systems Need to independent, effective, tested, audited

LOPA criteria -2- Conditional Modifiers Weather conditions Probability of ignition Probability of ignition leading to explosion Probability that person(s) will be exposed Probability that an exposed person will suffer a particular harm May be difficult to justify and evaluate Mitigation (right hand side of bow tie) Fire protection Emergency Response Water curtains Secondary and tertiary containment etc

‘Tolerable’ frequencies for events What risk can we tolerate? –Frequency for an event of a given severity (injury, environmental insult etc.) Users need to specify but aim to meet or exceed (do better than) regulator requirements The chosen tolerability becomes the target for risk management sometimes called ‘Risk Governance’ for the company (usually Individual or Societal Risk) Data and guidance available for injury/fatality and environmental effects 19

Likelihood of ‘n’ fatalities from a tank explosion per tank per year Risk Tolerability /yr /yrTolerable if ALARP /yr /yrBroadly acceptableTolerable if ALARP /yr /yrBroadly acceptable Tolerable if ALARP /yr /yrBroadly acceptable Fatalities (n) Tolerability Data (Fatalities) (Buncefield LOPA Guidance Dec 2009, final report from U.K. HSE) ALARP = As Low as Reasonably Practicable 20

1.E-12 1.E-11 1.E-10 1.E-09 1.E-08 1.E-07 1.E-06 1.E-05 1.E-04 1.E-03 1.E ,00010,000 (N) Number of Potential Fatalities Frequency of N or more Serious Injuries Government or Corporate Evaluation Criteria Business Evaluation Criteria Example Risk Evaluation Criteria 21

Categories for Environmental Risk (U.K. Environment Agency) CategoryDefinitions 6 Catastrophi c Major airborne release with serious offsite effects Site shutdown Serious contamination of groundwater or watercourse with extensive loss of aquatic life 5 Major Evacuation of local populace Temporary disabling and hospitalisation Serious toxic effect on beneficial or protected species Widespread but not persistent damage to land Significant fish kill over 5 mile range 4 Severe Hospital treatment required Public warning and off-site emergency plan invoked Hazardous substance releases into water course with ½ mile effect 3 Significant Severe and sustained nuisance, e.g. strong offensive odours or noise disturbance Major breach of Permitted emissions limits with possibility of prosecution Numerous public complaints 2 Noticeable Noticeable nuisance off-site e.g. discernible odours Minor breach of Permitted emission limits, but no environmental harm One or two complaints from the public 1 Minor Nuisance on site only (no off-site effects) No outside complaint Heading and introduction from Section 3.7 in “IPPC H1: Integrated Pollution Prevention and Control (IPPC) and Environmental Assessment and Appraisal of BAT”, Version 6 July 20 22

Category Acceptable if frequency less than Acceptable if Reduced as Reasonably Practical and frequency between Unacceptable if frequency above 6 Catastrophic per year10 -4 to per year10 -4 per year 5 Major per year10 -4 to per year10 -4 per year 4 Severe per year10 -2 to per year10 -2 per year 3 Significant per year10 -1 to per year10 -1 per year 2 Noticeable per year~ to per year~10 +1 per year 1 Minor All shown as acceptable-- Typical Environmental Tolerability Criteria 23

TOLERATED EVENT FREQUENCY (Target) PER YEARSINGLE FATALITY (e.g.) ( per year) INITIATING EVENT FREQUENCY PER YEARCONTROL SYSTEM LOOP FAILS PROBABILITY OF IGNITION (e.g.) PROBABILITYQuantity, M.I.E., site factors PROBABILITY OF EXPOSURE PROBABILITY100%10 -0 INDEPENDENT LAYER OF PROTECTION 1 PROBABILITY OF FAILURE ON DEMAND Basic Process Control System INDEPENDENT LAYER OF PROTECTION 2 PROBABILITY OF FAILURE ON DEMAND Safety Instrumented System  <10 -2 Example for Risk Calculation 24

Land Use Planning example from Netherlands - Individual Risk (fatality) /a - In addition Societal Risk as criterion - Definition of thresholds for overpressure, heat radiation and toxicity fatalities Freque ncy in 1/a Societal Risk not acceptable Societal Risk acceptable  25

Risk Assessment has to be adopted to the needs LEVEL 1: PROCESS HAZARDS ANALYSIS Should be done by plant based people They then have a better understanding of the risks and possibly how they may be reduced LEVEL 2: RISK REVIEW Specialist help from e.g. Process Engineering or Process safety function at site – should include Plant based people in the team LEVEL 4: QUANTITATIVE RISK ASSESSMENT Specialist help from external expertise. Owner needs to define scope and data. critique outcome. Level 1: PROCESS HAZARD ANALYSIS Level 2: RISK REVIEW L4: QRA LEVEL 3: ENHANCED RISK REVIEW Specialist help from e.g. Process Engineering or Process Safety function within Corporate – should include Site and Plant based people in the team Level 3 ENHANCED RISK REVIEW 26

Measuring Process Safety Performance: Process Safety Indicators (PSI) reporting levels Large loss of primary containment (LOPC) event Small loss of primary containment event Challenges to the safety system Operating discipline & management system 27

Thresholds for Loss of Containment becoming a PSI Cefic (European Chemical Industry Council) suggestion based on GHS classification 28

Outline 1 1 iDRM Approach in Europe Best Practice of Emergency Management 3 3 Risk Management Principles 2 2 Conclusions

Important: ability to react fast! The bigger a corporation, the higher the expectations even for small sites Management of Remaining Risks Communicate remaining risks to staff (operating procedures, training, drills, …) to external stakeholders (customers, neighbours, authorities – but careful regarding security risks!) Mitigate consequences Internal emergency planning (above all organisation, equipment, drills) Cooperation with external services (neighbouring plants, public services) 30

Crisis Management Systems: can the unpredictable be planned? Define as much as possible in advance, because crisis always happen at the wrong time and place... your regular organisation is not sufficient to handle crisis... all resources of the whole company have to be available in due time... public, media and authorities expect professional handling of crisis, too 31

Emergency Preparedness Accidents may happen even in most modern plants. They cannot be planned, but they should be considered. Cover all relevant scenarios in the emergency plan Assign responsibilities rather than regulating details The emergency organisation is different from the normal organisation, but has to be empowered to use it Adjust the emergency organisation to the dimension of the incident (e.g. “blue, yellow, red alert”) Clearly document all available resources (site, company, neighbouring sites, authorities,...) for the different scenarios. Ensure that they can be used in emergencies (e.g. co-operative agreements) Train your people and run exercises Before you rely on off-site resources, consider the time until availability Industrial zones with many companies close together need special attention (“domino-effects”) 32

Mock Drills Major incidents hopefully become less frequent. This makes drills even more important to train seldom used procedures... to reduce mental stress during incidents... to optimise emergency- and crisis- management... to make sure that necessary resources are available … to de-brief after exercise, act on results 33

Emergency Response The basic principle: the faster and more effective the initial response, the smaller the consequences for men, environment and economy. Provide the infrastructure for fast response (fire brigade, emergency control room, availability of key personnel, etc.) Encourage immediate reporting of incidents (not to wait until own efforts failed...), do not blame for false alarms If the fire brigade is (partly) staffed by operators be aware of the risks of understaffed production Better start with a higher level of alarm (worst case assumption) and grade it down later than vice versa Notify and involve public fire brigades and authorities as soon as possible Analyse every incident and the response to improve the emergency organisation without blaming anyone 34

incident dispatch of task forces emergency call fire alarm system Emergency Response Workflow: Example Industrial Park Frankfurt-Hoechst (Sanofi-Aventis/Infraserv Höchst)

Integrated Dispatch and Command Center (Hoechst Industrial Park) 24 hours crewed by 5 Dispatchers

Emergency Management: Fire Brigade of the Hoechst Industrial Park

Crisis management: Operational Structure Scene of Incident Emergency Manager Fire Brigade (site) Environmental control Site Security Plant Manager Occupational Physician Police Public Fire Brigade Emergency Response Committee Site Incident Manager Emergency Manager 2 Fire Brigade (site) Occupational Physician Environmental Protection Site Security Plant Safety Company Representative (company affected by incident) Communications Toxicology Public Fire Brigade Police Secretary Emergency Manager3-5 Additional Experts Documentation

The Role of Authorities The cooperation between authorities and companies at an incident depends on their cooperation before the incident. Open communication about risks and safety measures on a regular basis (e.g. in a local or regional committee) builds up trust which is urgently needed during emergency response Authorities need to know about the possible scenarios for major accidents to do their own preparations Authorities should have clear rules about their responsibilities in handling major incidents to avoid conflicts between the different agencies (e.g. labour safety, environment, civil protection, police etc.) Mitigation of consequences should come first, legal prosecution of individuals responsible for the incident later 39

Neighbours, Journalists and Environmentalists The basic issue: Neighbours and the general public share the risks of industrial sites, but not necessarily the benefits. Communication of relevant risks has to be done openly and in an adequate form (“not scientific”) prior to incidents (e.g. “neighbourhood councils”, brochures,...) –to build up trust in the competence of the company to handle risks –to enable the neighbours to react adequately during an incident The response of neighbours etc. to incidents is strongly influenced by the company´s response to requests and complaints prior to the incident Fast and open information after an incident is crucial Fears and worries of neighbours etc. have to be taken seriously even if they are based on emotions rather than science On the long term, conflicts with neighbours etc. endangers the “licence to operate” 40

Crisis Communication Sometimes crisis communicatiuon becomes a crisis of communication! 41

Outline 1 1 iDRM Approach in Europe Best Practice of Emergency Management 3 3 Risk Management Principles 2 2 Conclusions

Conclusions –Investing in safe and eco-efficient plants pays off at least on the long term –The (remaining) risks of industrial plants can be assessed and are the basis for scenarios for emergency planning –The knowledge and experience of the operators should be used by all means –Risks should be communicated as well as benefits to all stakeholders, esp. the neighbours –The resources for emergency response (manpower, equipment, communications, organisation etc) have to be planned in advance and readily available in case of an incident. People usually accept the risk of a chemical/pharmaceutical plant, but not incompetence in handling it –Authorities should involve themselves actively in emergency planning, balancing this out with their law enforcement duties –Combined efforts will definitely lead to safer and more accepted plants, as the figures from Germany may show 43

Development of Accidents in Germany since 1950 „Arbeitsunfälle“ = occupational accidents „Wegeunfälle“ = acc. on the way to work

Thank you for your attention!... and special thanks to Richard Gowland, EPSC Technical Director, who contributed a number of slides