TF FLAG JOINT HIGH CURRENT TEST FIXTURE INSTALLATION TO BE IN THE NSTX TRANSITION AREA Features Assembled Components: Flag and Mating Section of TF Center.

Slides:



Advertisements
Similar presentations
Terms 4 Definitions and Questions. Motherboard The main board of a computer, usually containing the circuitry for the central processing unit, keyboard,
Advertisements

©2011, The McGraw-Hill Companies, Inc. Chapter 4.
Prepared by: Hamzah Snouber For: Dr. I mad Breik.
Performed by: Raz Zur Instructor: Boaz Mizrahi המעבדה למערכות ספרתיות מהירות High speed digital systems laboratory הטכניון - מכון טכנולוגי לישראל הפקולטה.
EET Survey of Electronics Chapter 7 - Simple Series, and Parallel circuits.
Instrumentation: ground and noise Temperature Measurement.
NSTX Center Stack Upgrade Workshop Brainstorming on Design Solutions for TF Joint C Neumeyer Jan 22, 2009.
The Potential Divider Electricity Lesson 10. Learning Objectives To know what a potential divider is. To derive and know how to use the potential divider.
Section 4: Electric Motors
EKT314/4 Electronic Instrumentation
Random access memory is a form of computer data storage. A random-access device allows stored data to be accessed directly in any random order.
Milki Wakweya Jennifer Long Fairman Campbell Pranav Boda Advisor: Dr. Ajjarapu.
TF Joint Voltage Drop Instrumentation Robert Marsala (609) Hans Schneider (609) Engineering Operations August 7, 2003 TF_JOINT_Final_Design_Review.ppt.
NCSX NCSX PWR.System PROTECTION REVIEW 02/22/08 S. Ramakrishnan Slide 1 Electrical Power Systems (WBS 4) NCSX PWR System PROTECTION – REVIEW February 22.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
Smart transmitters.
Holt: Physics Ch. 20 – 1 Pages
Purpose of Voltage Regulators
Chapter 13.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
R.O.M. System Team: RISC Takers Team Members: Paul Banks, Yorick Robinson, Evan Tu, & Hans Weggeman Louisiana State University – Senior Design October.
Mechanical Testing of Flag Joint Assembly. TF Flag Assembly to be Tested.
Schematic Diagrams & Circuits
NSTX Centerstack Upgrade: initial discussions of the Machine Protection System (MPS) Robert Woolley 4 November 2009.
Diagnosis and Troubleshooting of Automotive Electrical, Electronic, and Computer Systems, Fifth Edition By James D. Halderman © 2010 Pearson Higher Education,
PROGRAMMABLE LOGIC CONTROLLER (PLC) AND AUTOMATION
ISU Science Center : Phase 3 : Dec Speedometer Station This station matches two areas of study into one cohesive system. Current will be induced.
Failure of Original TF Inner Leg Assembly C Neumeyer 4/10/3.
Resistive Transducers Sensors Used in Electronics.
By Dinesh Bajracharya Nepal Components of Information system.
Circuit.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
NSTX NSTX Center Stack Upgrade Ensure fatigue resistant Welds: minimum # of locations shown, could be more. Various Weld Reinforcements & Hardware Replacement.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
 Electric Current- net movement of electric charges in a single direction ◦ Example- powering electronics.
NCSX David Johnson August 18, 2004 Discussion of Co-Wound Flux Loops.
Open System Interconnection Describe how information from a software application in one computer moves through a network medium to a software application.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
NEPTUNE Power Low Voltage Circuit Fall 2003 Quarterly Meeting Tim McGinnis Sept 11-12, 2003.
Engineering Operations Outage Schedule Center Stack casing is scheduled to go back in the vessel today Complete NB armor, Diagnostic calibrations, clean/photo/close,
INNOVATION BUS GROUP:INNOTHENTICTECH PHASE 1 REFURBISHED BUS THIS PRESENTATION CONCETRATES ON POWER SUPPLY AND LOADS ONLY.
HARDWARE AND SOFTWARE. What is hardware? Hardware is any physical component of a computer system. Without any hardware, your computer would not exist,
NSTX TF Flag Joint Status of Design, Analysis, Test Activities & Design Review Preparations C Neumeyer NSTX Team Meeting 7/24/3.
A View of NCSX Structural System and Load Path for the Base Support Structure.
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
Potential Dividers and their application as sensors Electricity Lesson 9.
Voltage Divider Circuits Input transducers Input transducers are devices that convert a change in physical conditions (for example, temperature) into a.
SECURITY SYSTEM USING PIR. OVERVIEW  Introduction of Embedde system  Aim of the project  Current scenario  Limitations of Current scenario  Futurescope.
Engineering Operations TF Commissioning Mechanical testing of TF flag/box assemblies complete, inner bundle installed, and all joints made up. Joint resistance.
What is Voltage? Remember, current is the flow (per second) of quantities of electrons past a point in a circuit. if 0.1 C of electrons pass this place.
TF Joint Testing Data Acquisition Special Test Equipment Hans Schneider with Robert Marsala (609) Engineering Operations April.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
Smart Newton Car By: Hui Zhu.
LOW VOLTAGE DC TOHIGHER VOLTAGE DC UP 6 VOLT DC TO 10 VOLT DC USING 555 TIMER SUBMITTED BY.
PCIM Europe 2016 Power Conversion and Intelligent Motion
SCADA for Remote Industrial Plant
AUTO SWITCH OFF OF TV WHILE SCREEN GOES WITOUT VIDEO
MECH 373 Instrumentation and Measurements
Introduction
VIDEO ACTIVATED RELAY TO CONTROL
MECH 373 Instrumentation and Measurements
STEP UP 6 VOLT DC TO 12 VOLT DC
Circuits and Circuit Elements
GROUND-FAULT GROUND-CHECK MONITOR
Circuits and Circuit Elements
Photovoltaic (PV) Systems
The Electric Circuit.
Electrical energy By; Kemi and Kim.
Cyber Security of SCADA Systems Remote Terminal Units (RTU)
Presentation transcript:

TF FLAG JOINT HIGH CURRENT TEST FIXTURE INSTALLATION TO BE IN THE NSTX TRANSITION AREA Features Assembled Components: Flag and Mating Section of TF Center Stack Bus The Fixture Will Test the Joint to Currents up to Rated 72 kA Apply Repetitive Test Currents to Simulate NSTX Operations Provide Capability to Apply Mechanical Forces to the Flag While Carrying Current Monitor Flag Thermal and Current Distribution and Compare with the Results of Computer Analysis Data Utilize Existing NSTX TF Power Supplies, Controls and Protection Allow for Fixture Modifications if Needed

TF FLAG JOINT HIGH CURRENT TEST FIXTURE

TF FLAG FIXTURE INSTRUMENTATION AND PROTECTION DATA ACQUISTITION DEVICES Hall Sensors Distributed Across Flag Joint Connection Thermocouples For Flag Temperature Distribution Load Cell and Jacking Assemblies(2) for Pre-Loading the Flag Remote Video and Audio Monitoring of Assembly during Testing PROTECTION DEVICES Voltage Sensing across Tested Connection for Circuit Protection Diode(Parallel/Series) Circuit Across Fixture to Shunt Current Rogowski Coil Current Detection In Diode Leg CIC Computer Software and Hardware Protection to be Implemented Per Test Levels

TF FIXTURE CONCEPTUAL DESIGN SKETCH

PHOTOGRAPH OF NSTX TERMINATION STRUCTURE AREA

PHOTOGRAPH OF NSTX TERM. STRUCTURE BUS TAKE-OFF POINTS

FLAG TEST FIXTURE ELECTRICAL CONECTION IN NSTX SYSTEM