ISS After One Year Peter Dornan Imperial College London.

Slides:



Advertisements
Similar presentations
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Advertisements

Precision Neutrino Oscillation Measurements & the Neutrino Factory Scoping Study for a Future Accelerator Neutrino Complex – Discussion Meeting Steve Geer,
Scoping Study Proposal: Physics Section Introduced by: Paul Harrison University of Warwick.
CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
After ISS Where Do We Go From Here?. 21 August 2006P Dornan - After ISS2 Next - until the end of 2006  Produce the ISS Report - with the present team.
14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
ISS-4 22 August IRVINE Alain Blondel NEUtrino DETectors N-EU-DET 4-years working plan for Neutrino Detector R&D to take place in ~ objectives.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Welcome to the First Meeting of the An International Scoping Study of a Neutrino Factory & Super-beam Facility.
Neutrino physics: experiments and infrastructure Anselmo Cervera Villanueva Université de Genève Orsay, 31/01/06.
Design Studies Rob Edgecock/RAL. Outline Introduction – a reminder Scope of WDS Current status Problems FP6 Design Study Status Plans Conclusions.
Costing Workshop Summary Chris Rogers, RAL, 30 Mar 2010 Establish a common framework for costing of neutrino facilities Compare Beta Beam, Super beam and.
F Future of Neutrino Program at FNAL NuMI Off-Axis Meeting Hugh Montgomery January 12, 2004.
INDIA-BASED NEUTRINO OBSERVATORY (INO) STATUS REPORT Naba K Mondal Tata Institute of Fundamental Research Mumbai, India NUFACT Scoping Study Meeting at.
Scoping study p-ECFA Alain Blondel ISS-detectors Introduction: working group plans, organization and aims of the meeting.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
The meeting in Paris: The agenda has been built and optimized.
BENE Meeting April 28, 2006 A. Bross US Contribution to the IDS Aka WDS BENE IDS/FP7 at RAL April 28, 2006 A. Bross.
Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.
M W PooleJoint DL-RAL Accelerator Workshop Jan 09 Introduction to ASTeC Programmes M W Poole Director.
SPC 17 March 2009 Alain Blondel European Neutrino Oscillation Experiments Towards a roadmap.
American Neutrino Strategy: Consequences of P5 Report Jim Strait, LBNE Project Director NuFact August 2014.
Alain Blondel CHIPP Neutrino meeting NEUCHATEL June 2004 Aims of the meeting At least four universities in Switzerland do research in Neutrino Physics.
European Strategy for Particle Physics Proposed Draft to the CERN Council ECFA Linear.
21 August 2006P Dornan - After ISS1 Discussion  NuFact Talks Comments  Report 1 st Draft Oct – 60 Pages per WG Finalise before end of the year.
European design study on Neutrinofacilities - Euronu within FP7.
Steve Geer OsC RAL 21 June, Muon Accelerator Program MUON COLLIDER & NEUTRINO FACTORY R&D in the U.S.  
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
Road Map of Future Neutrino Physics A personal view Ken Peach Round Table discussion at the 6 th NuFACT Workshop Osaka, Japan 26 th July – 1 st August.
An International Scoping Study of a Neutrino Factory & Super-beam Facility.
Concluding remarks R. Aleksan CERN, November 25, 2005 CARE is almost 2 year old What comes next ?
Alain Blondel NUFACT11 1 August Rhone route Shopping route Historic route count >> 30 minutes ! Boarding on ship Henri-Dunant at 19:15 CANT BE LATE.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
A new underground laboratory at Frejus Jacques Bouchez CEA-SACLAY NNN05-Aussois April 7, 2005 Historical overview Latest developments Outlook.
The ISS Peter Dornan Imperial College London. 16 March 2006P Dornan - MUTAC `atmospheric’`solar’ `cross/reactor’ Oscillation defined by 3 mixing.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
Physics and Performance Evaluation Group NuFact 07 Okayama University, Japan August 6, 2007 Walter Winter Universität Würzburg for the executive committee:
27 Apr 2006P J Dornan - ISS3 - RAL Next Meeting 4 th ISS Plenary –Irvine Aug21, 22 (NUFACT06 Aug 24 – 30) Workshops –Physics Group, June, Valencia –Machine.
Neutrino Factory Design Study Introduction Introduction World Design Study status World Design Study status EC Framework 6 Design Studies EC Framework.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
F. Richard LAL/Orsay 1 ELAN in 2006 Annual Meeting.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
International cooling experiment 1 Towards an International Cooling Experiment Motivations: --Ionization cooling is an important ingredient in performance.
PId (ToF, CKoVI, EMCAL) V. Palladino et al MICEVC Frascati & Fermilab test beams in July Analysis in progress: MICE PID PhConf 4, 31 Aug aiming.
Proposed Questions for NuFact11 Round Table from the NUFACT11 Scientific Program Committee.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
1 How the Muon Ionization Cooling Experiment Found a Home MICE hall at RAL in Spring
PPAP Review 09 Imperial College/RAL Dave Wark Future Neutrino Oscillation Experiments Dave Wark Imperial/RAL PPAP Birmingham July 15 th, 2009.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
EUROnu Review: 14 th April 2011 EUROnu Introduction and Objectives Neutrino oscillations: much interest since 1 st paper in extension required to.
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
Goals of the consultation meetings From the ToR, the goals of the meeting in the first year should be: communicate that the panel exists; collect input.
ICARUS-LBNE project A. Guglielmi 1.LBNE-ICARUS Padova meeting 2.SPS-C C. Rubbia presentation.
Final Discussion THE EUROPEAN STRATEGY FOR FUTURE NEUTRINO PHYSICS
Accelerator R&D for Future Neutrino Projects
Introduction to ASTeC Programmes
The Way Forward ISS to IDS
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Report from ICFA neutrino panel
as of today 123 registered participants
Precision era.
ICFA Neutrino Panel: Roadmap discussion document
Presentation transcript:

ISS After One Year Peter Dornan Imperial College London

21 August 2006P Dornan - ISS after One Year2 A Little History  NuFact03  2004  April 2005  May 2005 Plan for a World Design Study towards a future Neutrino Factory - failed to get support Plan for a proposal to 2 nd call in EU FP6 design study programme - 2 nd call cancelled John Wood – CEO CCLRC(RAL) – requests a ‘Scoping Study’ for a future neutrino factory – and promises support Meeting in London to start the process (~40 people came at short notice) Committee – S Geer, Y Kuno, V Palladino, K Peach charged with setting up the organisation

21 August 2006P Dornan - ISS after One Year3 Why an ISS? From the Physics Community  The importance of Neutrino Physics  Belief that ultimate measurements will require a new type of facility From the Labs And in particular RAL in the UK  The need to plan for the future A number of large projects are being considered  Should a Neutrino Factory feature in this exercise?

21 August 2006P Dornan - ISS after One Year4 The RAL situation  RAL (Rutherford Appleton Lab) part of CCLRC  Used to be a PP accelerator lab  More recently has concentrated on neutrons, lasers, light source  But MICE has put PP accelerator activities back on the map  RAL management – with support from the UK government - wish to host a large future international project and are now examining possibilities  A neutrino factory is a possibility

21 August 2006P Dornan - ISS after One Year5 The ISS  Following the London meeting the ISS was launched at NuFact05 in Frascati  The brief was broadened to include future superbeams in addition to the neutrino factory But not beta beams – covered by the Eurisol project  The study became truly international Support from NFMCC in the US, Nufact-J in Japan, BENE in Europe Equal sharing of positions between Europe, Japan and the USA Meetings take place in all three areas  Results to be relevant for the whole community not just one lab.

21 August 2006P Dornan - ISS after One Year6 The Precision Era - after T2K and Nova Around 2012 We shall have good measurements of   12,  23,  m 2 12,  m 2 23 Probably have a measurement of  13 Possibly know the mass hierarchy So can plan for the ultimate neutrino measurements  Refine all parameters  Check consistency  Measure CP Violation This is the aim of the ISS

21 August 2006P Dornan - ISS after One Year7 CP Violation

21 August 2006P Dornan - ISS after One Year8 Neutrino source – options: Second generation super-beam  CERN, FNAL, BNL, J-PARC II Beta-beam Neutrino Factory

21 August 2006P Dornan - ISS after One Year9 ISS: organisation

21 August 2006P Dornan - ISS after One Year10 Meetings Plenary meetings to date:  CERN: 22 – 24 September 2005 Attendance: 90  KEK: 23 – 26 January 2006 Attendance: 70  RAL: 24 – 29 April 2006 Attendance: 80  Irvine: 21 – 23 August 2006 Attendance: 70 Working groups:  Physics: Workshops:Imperial: 14 – 21 November 2005 Boston: 6 – 10 March 2006 Valencia: 3 – 6 July 2006  Accelerator: Workshops:BNL:07 – 12 December 2005 Princeton:26 – 28 July 2006  Detector: WorkshopsCERN:3 – 5 July 2006 Detector/Physics parallel at Physics workshops

21 August 2006P Dornan - ISS after One Year11 ISS: motivation Goal: timely completion of conceptual design  Significant international effort taking several years Requires successful bids to provide the resources Preparation for design study  Review physics case  Critical comparison of options  Review options for accelerator complex: Prepare concept-development and hardware-R&D roadmaps for design-study phase  Review options for neutrino-detection systems Emphasis: identify concept-development and hardware-R&D roadmaps for design-study phase  Establish the Cost Drivers & Optimize Physics/$ - where there are alternatives Absolute scientific value - where only one method

21 August 2006P Dornan - ISS after One Year12 Where have things gone well  It has brought together a substantial part of the neutrino community to seriously consider how to plan the future  It has been a truly international effort  It has put a future neutrino facility on the road map as a future international project EPP2010, CERN Council Strategy Document  It has emphasised the need to consider the accelerator and detector together - and also the physics goals  The stage is set now for a detailed design study leading to a CDR But it needs resources

21 August 2006P Dornan - ISS after One Year13 Where have things gone less well  The problems associated with high power superbeams have not been covered in detail  A significant part of the neutrino community still consider anything but an increased power superbeam to be far in the future - and therefore irrelevant today This does not encourage lab directors and funding agencies to provide R&D funds now  There has been no serious engineering activity - either for costing or R&D

21 August 2006P Dornan - ISS after One Year14 The Immediate Future i.e. under the present ISS structure This meeting NUFACT06 The ISS Final Report

21 August 2006P Dornan - ISS after One Year15 This Meeting Essentially a wrap-up meeting for the one year ISS study Decide what to present at NUFACT Decide what should be included in the final report  The final report will be critical for obtaining resources for future activity

21 August 2006P Dornan - ISS after One Year16 The ISS Report In each Area  Brief resume of the situation one year ago  Detailed description of the work this year  What is needed to take the work forward

21 August 2006P Dornan - ISS after One Year17 The ISS Report - Accelerator For the Neutrino Factory  Advantages & Disadvantages of each Technique  A baseline design With some options  Potential Difficulties in realising the baseline  Options under consideration  R&D necessary to establish viability For the Superbeam  Difficulties inherent in operating a superbeam at high power  R&D necessary to establish viability

21 August 2006P Dornan - ISS after One Year18 The ISS Report - Detector For the Neutrino Factory Solution  Difficulties inherent in large magnetic detectors  Options under consideration  Advantages & Disadvantages of each Technique  A baseline design  R&D necessary to establish viability For the Superbeam Solution  Options under consideration  R&D necessary to establish viability

21 August 2006P Dornan - ISS after One Year19 The ISS Report - Physics For the Theoretical & Phenomenological Groups  Justification for accurate measurement of the oscillation parameters  Models considered and their importance in the wider particle physics context  Importance of the tau channels etc. For the Experimental Group  Conclusions on the Comparisons  Defects in the simulations which need improvement For the Muon Group  The potential of muon physics  How well can it be realised at a neutrino factory For all Groups  What can/should be explored over the next year

21 August 2006P Dornan - ISS after One Year20 This Meeting – Today Next  After ISS - Some possible ideas about how to take these studies forward Aimed to start discussion/thoughts with hopefully a conclusion at the end of NuFact Coffee  Working Group Sessions Lunch  Working Group sessions  Can continue until 18:00

21 August 2006P Dornan - ISS after One Year21 Tomorrow  Start 8.30  Plenary Reports from the working groups 2 hours each Dry run of talk for NuFact  Review the achievements of the last year  Outstanding problems  Future - particularly necessary R&D Discussion  After tea General Discussion  Messages to Neutrino Community at NuFact  Successes/Failures of the ISS  How to take the studies forward

21 August 2006P Dornan - ISS after One Year22 Wednesday Start 9.00  Joint meeting of Detector & Physics Groups  Informal ad-hoc meetings to refine NuFact presentations

21 August 2006P Dornan - ISS after One Year23 At NuFact Thursday Aug 24  ISS presentations Short introduction 40 min per group  35 min talk + 5 min discussion Wednesday Aug 30  Discussion on the Follow-up to the ISS With hopefully a viable acceptable conclusion