1 Autosub Mission Planning and Operations Dr. Miles Pebody Ocean Engineering Division Southampton Oceanography Centre

Slides:



Advertisements
Similar presentations
Patch Testing HYPACK 2013.
Advertisements

SeaCycler AST2 Surface Piercing Profiler Technology.
1 ADCP Primer OC679: Acoustical Oceanography. 2 Outline ► Principles of Operation   The Doppler Effect The Doppler Effect   BroadBand Doppler Processing.
Ohio University Russ College of Engineering and Technology School of Electrical Engineering and Computer Science Avionics Engineering Center Ranjeet Shetty.
Exploring Beneath an Antarctic Ice Shelf with the Autosub3 AUV Stephen McPhail, Maaten Furlong, Miles Pebody, James Perrett, Peter Stevenson, Andy Webb,
Personal Navigation Phone Technical Presentation.
1 Autosub Mission Control and Mission Programming Dr. Miles Pebody Ocean Engineering Division Southampton Oceanography Centre
Unit 2 GEOSTATIONARY ORBIT & SPACE SEGMENT
HYPACK® Multibeam Training Seminar
Introduction to NAVSTAR GPS Introduction to NAVSTAR GPS.
JIMMY PETERSON INFORMATION SYSTEMS 100 DR. CARL REBMAN GPS- Global Position Satellite.
SAILING TO WIN SAILING FOR LIFE Real-time weather station and GPS advancements Peter van Muyden.
Field Navigational GPS Robot Final Presentation & Review Chris Foley, Kris Horn, Richard Neil Pittman, Michael Willis.
Autonomous Dual Navigation System Vehicle Dmitriy Bekker Sergei Kunsevich Computer Engineering Rochester Institute of Technology December 1, 2005 Advisor:
DAGR Defense Advanced GPS Receiver
Lecture 11: Satellite Communcation Anders Västberg Slides are a selection from the slides from chapter 9 from:
Introduction to the Global Positioning System. What is the GPS? Orbiting navigational satellites Orbiting navigational satellites Transmit position and.
PRESENTATION BASED ON GPS. Introduction To GPS Introduction To GPS.
Preparations for GPS/INS Flight Testing on a High-Dynamic Vehicle Presenter: Curtis Cutright Advisor: Dr. Michael S. Braasch.
Geographic Information Systems
INTERNATIONAL INSTITUTE FOR GEO-INFORMATION SCIENCE AND EARTH OBSERVATION The Global Positioning System Bart Krol / Jeroen Verplanke.
The System: Software/Electronics/Control/Navigation Steve McPhail Miles Pebody, James Perrett l The system is Physically Modular: 15 nodes (sub-systems)
PropaGator Oral Report 2 Andrew Wegener IMDL 2012.
Electronic Navigation Chapter 23. Many Toys Speed up and make easier many tasks Tools are better with knowledge Common: –VHF –Depth Sounder –RADAR –LORAN.
Attitude Determination and Control System
Marine Autonomous and Robotic Systems Facility at NOC 20 th March David White 20 th March
NRT data stream from the gliders Slocum and Spray to Coriolis EGO meeting Paris 2-3/10/06.
ARGO, Profiling Floats, and Iridium Stephen C. Riser Dana Swift School of Oceanography, University of Washington [acknowledgements to NOAA, ONR, NSF, NASA]
Computational Mechanics and Robotics The University of New South Wales
INDIAN INSTITUTE OF TECHNOLOGY MADRAS Department of Engineering Design AUTONOMOUS UNDERWATER ROBOTIC LABORATORY Researchers : Dr. Asokan Thondiyath, Mr.
What is GPS? GPS, which stands for Global Positioning System, is the only system today able to show you your exact position on the Earth anytime, in any.
Cruise Planning and Cruising Course Chapter 8 Communications United States Power Squadrons ® Instructors and Students Please Note: Post-release corrections,
Intro to GIS Spring  GPS = Global Positioning System  GNSS = Global Navigation Satellite Systems  Satellite based technologies that give location.
Global Positioning Systems Glen T. Huettl Agricultural Education Garrison High School.
GPS(Global Positioning System) -An Introduction. What is the GPS? Orbiting navigational satellites Transmit position and time data Handheld receivers.
AEM 5333 UAV Search and Surveillance. Mission Description Overhead surveillance and tracking – Humans on foot – Moving vehicles Onboard GPS transceiver.
Finding Your Way— Maps, Compass and GPS Eagle Vision 2005.
HYSWEEP® PATCH TESTING.
Page 1 of 35 Achieving Over-The-Horizon Requirements Using Low Earth Orbit Satellites (LEOS) Presented by Eric Saikin.
OOI Annual Review Year 2 May 16 – 20, 2011 Ocean Observatories Initiative Surface and Subsurface Mooring Telemetry Inductive and acoustic technology and.
7 th SMOS Workshop, Frascati, October /17 AMIRAS campaign Fernando Martin-Porqueras.
1 Autosub Electronics and Data Processing James Perrett Ocean Engineering Division Southampton Oceanography Centre
Autosub 7 m long x 0.9 m dia 2,700 kg in air Maximum Depth: 1600 m. Speed: 1 to 4 knots Endurance: Up to700 km depending on speed, hotel load etc. Large.
Benthic Habitat Mapping of Coral Reef Ecosystems using the SeaBED AUV R/V Cape Hatteras Puerto Rico & USVI April 11 – 24, 2008.
GLOBAL POSITINING SYSTEM WORKING,ERRORS AND CORRECTION USING DGPS Department Of Electronics and Communication Engineering.
Lecture 11: Global Positioning System (GPS) Lecture 11: Global Positioning System (GPS)
Sensing and Acquisition & MOOS
Weight: 52 kg Hull Diameter: 21.3 cm Vehicle Length: 1.5 meters Depth Range: 4–200 meter (coastal model) or 1000 meter (1- km model) Speed: 0.4 m/sec.
Global Positioning System Overview
Session III GPS DEPTH-FINDER UNITS. F GPS positions are not error free –User and/or Satellite clock bias. –Satellite signal can be blocked. –Atmospheric.
1 SVY 207: Lecture 12 Modes of GPS Positioning Aim of this lecture: –To review and compare methods of static positioning, and introduce methods for kinematic.
Doppler Navigation & Aiding for Maritime Robots Presented by: Omer Poroy Presented at: The Maritime Business & Technology Summit, November 30, 2011 Panel.
1 Autosub Mission Control Ship Equipment Dr. Miles Pebody Ocean Engineering Division Southampton Oceanography Centre
Unmanned Mobile Sensor Net - Ben Snively Unmanned Underwater Gliders Survey and extensions to work from: COOPERATIVE CONTROL OF COLLECTIVE MOTION FOR OCEAN.
GPS Global Positioning Systems. Titanic – Hit an iceberg and sunk - April 14, 1912 Discovered – Sept. 1, 1985 by Dr. Robert Ballard at a depth of 4 km.
Patch Testing. HYSWEEP ® Calibration of a Multibeam System Patch Testing Single and Dual Head Multibeam Systems. Patch Testing Single and Dual Head Multibeam.
Introduction to NAVSTAR GPS Introduction to NAVSTAR GPS Charlie Leonard, 1999 (revised 2001, 2002)
Revised 10/30/20061 Overview of GPS FORT 130 Forest Mapping Systems.
… Presented By DEEPAK KUMAR-10/ECE/54 Index INTRODUCTION HISTORY HOW IT WORKS? APPLICATION CONCLUSION.
Product Training AI50 Author Job title Please ensure mobile phones are switched to silent.... Thanks!
Younis H. Karim, AbidYahya School of Computer University Malaysia Perlis 1.
PRESENTATION ON METHODS OF NAVIGATION SUBMITTED BY TARIQUDDIN S. AHMED Final Year, ECE.
Patch Testing. HYSWEEP ® Calibration of a Multibeam System Patch Testing Single and Dual Head Multibeam Systems. Patch Testing Single and Dual Head Multibeam.
Off-Road Equipment Management TSM 262: Spring 2016
Exploring Beneath an Antarctic Ice Shelf with the Autosub3 AUV
The Golden Age Of Aircraft Design AVIONICS from Early Days till Now
OC3570 Cruise Project Presentation: Slocum Glider Study
The Global Positioning System
ARGO, Profiling Floats, and Iridium
Presentation transcript:

1 Autosub Mission Planning and Operations Dr. Miles Pebody Ocean Engineering Division Southampton Oceanography Centre

2 Overview l Equipment l Pre-Mission Planning l Mission Preparation and Initiation l Mission End and Post Mission

3 Equipment

4 Equipment: Computing Resources l Three Networked PCs Mission programming, mission management and vehicle telemetry.Mission programming, mission management and vehicle telemetry. Acoustic TrackingAcoustic Tracking Data ProcessingData Processing Tershelling April 2000

5 Equipment: On Surface Communications l Lonworks VHF Radio Modem (range 0.5Km) l Ethernet VHF Radio Modem (range 0.5Km) l Orbcomm Satellite Communications l Argos Satellite Tracking

6 Equipment: Subsurface Communications l 23-33KHz Acoustic Tracking, Telemetry and Commands l 10-14KKz Tracking (telemetry in development)

7 Pre-Mission Planning

8 l Mission Requirements l Mission Navigation l Control Modes l Autosub Safety Issues l The Mission End - Recovery

9 Mission Requirements l Instruments/sensors l Data sampling l Area of operation l Vehicle critical factors Power availabilityPower availability Depth ratingsDepth ratings

10 Mission Navigation Example: track of 110 km mission off Fort Lauderdale. Coast, Florida. l Waypoint selection l Co-ordinate System Cartesian (X/Y metre offset)Cartesian (X/Y metre offset) Polar (latitude/longitude)Polar (latitude/longitude) l Navigation Mode Selection Heading onlyHeading only Heading to positionHeading to position Follow track between two positionsFollow track between two positions

11 Control Modes: Depth/Altitude Control Depth control Altitude control - terrain following l Autosub can also be programmed to profile Up/Down at constant pitch angles

12 Mission Safety Issues In water obstaclesIn water obstacles Terrain - vehicle pitch controlTerrain - vehicle pitch control Surfacing zonesSurfacing zones Mission depth and altitude limitsMission depth and altitude limits Emergency abort timeoutsEmergency abort timeouts

13 Mission Preparation and Initiation

14 Mission Preparation and Initiation l Mission Script l Configuration Script l Mission Script Checking l Pre-Launch Tasks l Post-Launch / Pre-Start Tasks

15 Operations: Mission Preparation Mission Script Editor ConfigurationEditor Control parameters Sensor parameters Safety limits EAS timers + limits MissionCompilerWarnings Go!Stop MissionCommander + Monitor History File RadioModem Down-loader Mission Simulation

16 Operations: The Mission Script // When satisfactory GPS fix has been acquired dive and track follow: // Set timeout to 500 seconds. WHEN( GotGPSfix)// When GPS fix acquired ……… Timer( 500),// Set timeout of 500 seconds. Depth( 10),// Set depth mode to 10 metres. MotorPower( 400), // Set motor mode to Power 400 Watts. PositionP( N:56:27.5, W:5:29.4); // Set position mode and demand // Next line, when reached end of the track …… WHEN( GotPosition)// When Got there (OR timeout) ……… ………

17 Operations: The Launch Early launches through ship’s ‘A’ Frame.Early launches through ship’s ‘A’ Frame. Now we use a gantry system.Now we use a gantry system.

18 Operations: Monitoring unattended missions GPS position Orbcomm data link Terschelling Autosub campaign March 00 Text message on cell phone GPS Orbcomm Status message

19 Mission End and Post Mission

20 Mission End: Autosub Relocation. l Local ARGOS tracking to horizon l Surface radio telemetry within 0.5 Km l Acoustic Telemetry within 1 Km (soon 6Km) l Acoustic tracking within 8 Km

21 Mission End and Post Mission l Logger Data Recovery l Autosub Recovery l Navigation Postprocessing and Engineering data examination

22 The End Dr. Miles Pebody Ocean Engineering Division Southampton Oceanography Centre

23 Autosub Systems: Navigation l GPS or DGPS fixes on the surface update the position estimate. lSpecial Navstar GPS antenna overcomes problems of washover on tail mounted antenna. lBroadcast (300 kHz) DGPS corrections used. l Uses RDI 300kHz Doppler sonar (250 m range) for velocity.& Seatex MRU6 compass for rotation into earth co-ordinates. l Biggest problem is heading dependent compass errors. l Errors can be substantially reduced to about 0.5-1% of distance travelled with calibration. l Calibration involves a short box mission.

24 Autosub Systems: Heading Control HeadingHeading Line Of SightLine Of Sight - ( Head towards demanded Waypoint). Track FollowTrack Follow - ( Follow Straight Line Track Between Two Waypoints). Modes of Operation.

25 Future Developments l Integrated mission planning tools including mission simulation and replay. l Modify Mission Control and Emergency Abort for the more complex environment of under-ice missions. l Power source - fuel cells, semi-fuel cells. l Improved Collision Avoidance in the horizontal plane. l Improved Navigation. Use Ring Laser Gyro based INS. From 1% to 0.1% of distance traveled. l Improved Acoustic Communications and Location.