Using Templates to Increase Efficiency

Slides:



Advertisements
Similar presentations
Michigan Electronic Grants System Plus
Advertisements

Access 2007 ® Use Databases How can Microsoft Access 2007 help you structure your database?
We Support You! © 2008 Infinite Campus. All Rights Reserved. DL1323-GA-1 Teresa Haden Support Specialist K-12 Solutions Group.
Tutorial EBSCOadmin User Groups support.ebsco.com.
PantherSoft Financials Smart Internal Billing. Agenda  Benefits  Security and User Roles  Definitions  Workflow  Defining/Modifying Items  Creating.
11 This document contains DRS Technologies proprietary information. Copyright © 2012 DRS Technologies, Inc. All rights reserved. Halvorsen Parts Order.
© 2012 Autodesk Structural Workflows for Autodesk ® Plant Design Suite Projects Abraham Koenig Technical Specialists Manager AEC/ENI Central Europe Alexandre.
ONE-WAY SLAB. ONE-WAY SLAB Introduction A slab is structural element whose thickness is small compared to its own length and width. Slabs are usually.
GEtServices Contingent Staff Training For Suppliers Blanket Order.
Internet Advancement. Internet Applications Update.
Virtis/Opis Technical Update Virtis Opis Bridgeware User Group 2011 Conference Helena, Montana 1.
Virtis-Opis Update Virtis-Opis User Group Training Meeting Helena – August 2011.
© Siemens Product Lifecycle Management Software Inc. All rights reserved Siemens PLM Software Solid Edge ST4 Training Revising assemblies.
David Warne Independent Manufacturing Consultant.
Engineering Document Repository & Electronic Signature (E-Sign) Tutorial 1 DCG- Revision C 7/25/2014.
RM Product Update October 2009 Alexander Mabrich, PE, Msc Senior Engineering Consultant.
I/3 Budget FY 2008 Department Request Training Nickie Whitaker Department of Management August 14, 2006.
2013 Design Rating User Group Presentation Virginia Beach, Virginia August 8, 2013.
Chapter 2 Build Your First Project A Step-by-Step Approach 2 Exploring Microsoft Visual Basic 6.0 Copyright © 1999 Prentice-Hall, Inc. By Carlotta Eaton.
1 Integrated Development Environment Building Your First Project (A Step-By-Step Approach)
S/W Project Management
This material is approved for public release. Distribution is limited by the Software Engineering Institute to attendees. Sponsored by the U.S. Department.
Systems Analysis – Analyzing Requirements.  Analyzing requirement stage identifies user information needs and new systems requirements  IS dev team.
Unit J: Creating a Database Microsoft Office Illustrated Fundamentals.
This material is approved for public release. Distribution is limited by the Software Engineering Institute to attendees. Sponsored by the U.S. Department.
Umm Al-Qura University Department of Civil & Structural Engineering 1 Design of reinforced concrete II Design of one-way solid slabs Lecture (1)
CPSC 203 Introduction to Computers T59 & T64 By Jie (Jeff) Gao.
Chapter 9 Describing Process Specifications and Structured Decisions
McGraw-Hill/Irwin The O’Leary Series © 2002 The McGraw-Hill Companies, Inc. All rights reserved. Microsoft Excel 2002 Lab 4 Using Solver, Linking Workbooks,
GEtServices Contingent Staff Training For Suppliers.
1 TDG GENERAL POLICY ADVISORY COMMITTEE 14 June, 2005 Ottawa, ON Agenda Item No. 9 TDG FEDERAL TICKETING INITIATIVE 1.
Moodle (Course Management Systems). Assignments 1 Assignments are a refreshingly simple method for collecting student work. They are a simple and flexible.
1 Differences Between BRASS and AASHTO Standard Spec Engines Virtis Opis BRIDGEWare Users Group Meeting 2011 Helena, Montana.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
1 AASHTOWare Bridge Technical Update AASHTOWare Bridge Rating/Design User Group Training Meeting Traverse City – August 2014.
BRIDGE DESIGN & RATING REPORTS TECHNICAL ADVISORY GROUP (RTAG) Amjad Waheed, PE 2014 RADBUG Presentation Traverse City, Michigan August 13, 2014.
© 2001 Business & Information Systems 2/e1 Chapter 8 Personal Productivity and Problem Solving.
1 Technical & Business Writing (ENG-315) Muhammad Bilal Bashir UIIT, Rawalpindi.
Bridge Design Implementation Jeff Olsen, PE – MT DOT AASHTOWare Bridge Task Force
GTSTRUDL Using the GTSTRUDL Base Plate Wizard Example of Creating and Analyzing a Base Plate Rob Abernathy CASE Center GTSUG June, 2009 Atlanta, GA.
Copyright 2007, Paradigm Publishing Inc. ACCESS 2007 Chapter 3 BACKNEXTEND 3-1 LINKS TO OBJECTIVES Modify a Table – Add, Delete, Move Fields Modify a Table.
1 Virtis/Opis Technical Update Virtis Opis BRIDGEWare Users Group Meeting 2010 Nashville, Tennessee.
DWR Templates SiteManager 3.1a-2 Sheri Meyerhoff Indiana Department of Transportation September 8, 2003.
GEtServices Purchasing Units & Materials Training For Suppliers Request.
ICCS Marker Training Hamburg July 2008 Final note on marking Reliability marking report from WinDEM will include record of scores for double-marked items,
1 Differences Between BRASS and AASHTO LRFD/LRFR Engines Virtis Opis BRIDGEWare Users Group Meeting 2011 Helena, Montana.
Davisware GlobalEdge 2008 Payroll Main Menu Time Entry and Payroll Processing.
Copyright © 2006, Infinite Campus, Inc. All rights reserved. Customizing Campus Help.
Travel Reimbursement -step by step- When is Travel Reimbursement (TR) required? All travel that requires reimbursement or travel advance issued on TA.
Chapter 2 Build Your First Project A Step-by-Step Approach 2 Exploring Microsoft Visual Basic 6.0 Copyright © 1999 Prentice-Hall, Inc. By Carlotta Eaton.
Supply Discrepancy Report-Automation (SDR-A) SDR Submission Wizard "THIS BRIEFING/PRESENTATION/DOCUMENT IS FOR.
OFFICE OF FINANCIAL MANAGEMENT 0 Office of Financial Management Office of Financial Management TALS Draft Conceptual Solution February 24, 2004.
Tajikistan Mission 02 – 06 May Request from Country Accept of Request Sending the ToR.
Digital Media & Interaction Design LECTURE 4+5. Lecture 4+5 Draw requirement + Prototyping.
Internet Advancement.
Thinking Web > CONTENT DEVELOPMENT
Hudson Fare Files 103 – Alternate Fare Files
Travel Reimbursement -step by step-
Michigan Electronic Grants System Plus
Internet Rechartering Update
Systems Analysis and Design
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Lesson #7 MCTS Cert Guide Microsoft Windows 7, Configuring Chapter 7 Configuring Devices and Updates.
Add Budget Period Steps Screenshots Purpose:
Online Training Course
Unit J: Creating a Database
Director Kirk T. Steudle, P.E.
Presentation transcript:

Using Templates to Increase Efficiency Jeff Olsen Montana Department of Transportation Helena, MT

Agenda Development Meetings Consist of: Task Force Updates Technical Updates User Training State Presentations Third Party Updates Group Meetings

Agenda Development State Presentations: How are states using Virtis Opis? Issues and solutions relating to product. Other interesting happenings. What does the user want to see??? Ideas for next years meeting??? Submit ideas to: jolsen@mt.gov

So How does Montana use Virtis / Opis? Montana has licensed V/O for many years. Using Virtis for rating Opis was the “side-kick” - never got much action

MDT Policy on Virtis / Opis Internal Designs By completion of design, have bridge modeled in Opis Rate bridge using Virtis. Make necessary adjustments to design if required by rating. Consultant Designs Consultants are required provide a rating for with their final design. MDT enters the bridge into V/O and compares rating.

What could I do to increase usage? Problem Building model is cumbersome Reports are difficult to find data No standard procedures or guidelines Goal Find a way to make input quicker and easier Some how take the sting out of reports

Solutions Building Model Developed Standard Procedures Training (training alone proved unsuccessful) Create Templates Create Tutorials for using Templates Reports Help handout on different report tools Report Summary – Where do I find it?

Current MDT Policy on Prestress In most cases, MDT provides beam details and design stresses in the plan set. Awarded fabricator designs strand pattern and required concrete strengths. Shear steel is standardized for each beam type. Shop drawings are submitted to MDT for approval. MDT enters final strand pattern into Opis and checks design and rating. Fabricator modifies and resubmits shop drawings as necessary .

Naming Procedures   Bridge ID box - Input the Structure Number, except replace the "+" with an underscore"_". NBI Structure ID box - Input the Structure Number, except replace the "+" with an underscore"_". Name box – Use this box to identify the stage your bridge is in. While you are entering the bridge, input “Draft Bridge” in this box. When the design is complete and you are satisfied with the design and rating, input “Design Complete” in this box. When the shop drawings come in and you have made the appropriate revisions, input “Shop Drawings Complete” in this box. Description box – Use this box to identify any code or rating failures and explain any exception or justification for those failures.

Montana’s Bridge Explorer

Templates Folder

Beginning with a Template Bridge

Naming Procedures

Bridge Description Window

Go to Opis

Now it’s time to define the members Now it’s time to define the members. For each step, enter the data for both the exterior beam and interior beam before moving on the next step.

Control Options I set up the control options to our state defaults. The designer may alter them for special cases. I included a discussion of all options in the tutorial.

Enter Beam Details

Link beams at this point. Repeat process for interior beam.

Enter Deck Details for G1 and G2.

Enter Haunch Details for G1 and G2.

Points of Interest

Compute Distribution Factors

Enter Strand Pattern

Select Analysis Settings

Analyze Beam

Check Results Summary of the Specification Results and a table for each of the articles checked.

Modify Strands as Necessary - Tutorial offers guidelines

Add Shear Reinforcement and re-analyze as necessary

Bridge Rating When you are satisfied with the design, check the rating. Make any modifications necessary.

Build the Bridge Alternative Model using wizard

Tutorial APPENDIX A - Reports

Questions