Phoenix Convention Center Phoenix, Arizona Existing Building Commissioning (EBCx): A Strategy for Improving Your Building Performance Track: Building Performance.

Slides:



Advertisements
Similar presentations
Energy Audit Process For Data Centers Len Kientz
Advertisements

Test Automation Success: Choosing the Right People & Process
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
1100 Superior Ave., Suite Wolf Ledges Parkway, Suite West Third Avenue Cleveland, OH 44114Akron, OH 44311Columbus, OH
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
Process & Benefits of Monitoring Based Commissioning David Jump, Ph.D., P.E. Principal Quantum Energy Services & Technologies, Inc.
Marion Fraser Fraser & Company.  National Code  Provincial Regulation  Municipal Enforcement  Improved codes important but not sufficient  do not.
Retrocommissioning Trends HPBCCC Steve Wiggins NEBB Immediate Past-President.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
Developing an Energy Management Plan for the Whole School United Learning – 18 th February 2015 Malcolm Hanna, Technical Director Improving the use of.
Energy Efficient Operations Presentation to ASHRAE Energy Expo October 2, 2013 Center for Energy and Environment.
Technical And Financial Benefits Of Retro-Commissioning Initiatives Society of American Military Engineers Northern Virginia Post January 6, 2011 Presented.
Building Commissioning
A framework for describing IT Project Management Processes and Tool Set Features Enterprise Project Management Framework.
QUALITY MANAGEMENT DEFINITIONS AND CONCEPTS QUALITY MANAGEMENT TOOLS QA / QC PROCESS COMPUTERS AND PROJECT QUALITY.
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
Energy Management 101 Lance Stewart Facilities Maintenance Manager/Energy Manager City of Charlottesville, Virginia.
Implementing Commissioning and the CxP for DOE Super ESPC Projects Draft Guideline Review Chuck Dorgan, P.E., Ph.D., CxAP Roger Johnson.
PMP® Exam Preparation Course
Phoenix Convention Center Phoenix, Arizona HVAC Re-tuning at GSA and Army Reserve Facilities: A Low-Cost Path to Energy Efficiency and Cost Savings Integrated.
Commissioning for High Performance Commissioning for High Performance Ken Meline, Principal Command Commissioning, LLC.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
August 10, 2007 CONTROL YOUR DATA CENTER! Tune your Legacy Data Center to improve overall efficiencies.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Using Service and Product Providers to Leverage Your Energy Efforts Prenova/Owens Corning Energy Process Optimization Thomas Pagliuco – Prenova Fred Dannhauser.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Commissioning for Sustained Building Performance Building Performance Birmingham, AL Marriott 9/29/11 Introduction to Commissioning and Retro-Commissioning.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
Industrial Engineering Roles In Industry
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
Phoenix Convention Center Phoenix, Arizona DOE eGuide for Strategic Energy Management Building PerformanceStrategic Energy Management Ridah Sabouni Energetics.
Phoenix Convention Center Phoenix, Arizona Supporting Today’s Energy Manager: Tools and Training from DOE FEMP Agency Energy Manager Energy Manager Skill.
Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,
LEED Mechanical Economic Analysis, Cost Reduction Strategies and Sustainability Support Services Reducing = Metal + Carbon + Energy + Water + Chemicals.
Phoenix Convention Center Phoenix, Arizona Data Center Energy Management Strategies Edwards AFB Data Center Consolidation ESPB Building Performance Data.
SYSTEMS MANUALS A Systematic Approach Craig Hawkins, CxA.
Phoenix Convention Center Phoenix, Arizona FEMP Training Supports FBPTA and FMI.gov Institutional Change Federal Buildings Personnel Training Act: Resources.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED.
Phoenix Convention Center Phoenix, Arizona Engaging and Empowering Building Occupants to Meet Energy Goals Track 9: Institutional Change August 12, 2015.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Building Commissioning/Energy Performance Contracting.
Building Commissioning: Cx 101 Brock Graham, Gilbane Building Co. Michael Gannon, BVH Integrated Services November 15, 2010.
Phoenix Convention Center Phoenix, Arizona Facility Energy Audits Mike Gutowski Johnson Controls August 12, 2015 Agency Energy ManagerEnergy Audits: Implementing.
June 19, 2003 Kirk McElwain Technical Director CDBI Design-Build Conference.
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
5 EXISTING BUILDINGS. Slide header copy In This Chapter >Sustainable existing buildings >Planning green projects for existing buildings >Measures to improve.
Phoenix Convention Center Phoenix, Arizona Building Performance Using DOE’s Energy Modeling Tools For Retrofit Planning Using DOE’s Energy Modeling Ecosystem.
Halcom Consulting llc Sustainability Consulting & Commissioning 2917 Carlisle NE Suite 109 Albuquerque, New Mexico p f
COMMISSIONING: REDUCING THE CARBON FOOTPRINT (…and Maintenance Costs) (…and Operating Costs)
How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1.
How to Have a Successful Retrocommissioning Project Karl Stum, PE Portland Energy Conservation Inc. (PECI) Successful Retrocommissioning.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
Project Management Basics
Implementing the CxP for ESPC Projects – Maximizing Benefits Chuck Dorgan, P.E., Ph.D. Roger Johnson.
1 Time and Effort Reporting Lessons Learned: Problems and Potential Solutions Helga Greenfield Associate Vice President for College Relations and Director.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Phoenix Convention Center Phoenix, Arizona Case Studies of Institutional Change at the Campus Level Track 9: Institutional Change August 13, 2015.
Phoenix Convention Center Phoenix, Arizona Aligning with an Organizational Mission to Drive Energy Savings Track 9: Institutional Change August 11, 2015.
Eric Rinearson Director, Facilities Maintenance Services
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
TechStambha PMP Certification Training
Optimization for Airport Facilities
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
Presentation transcript:

Phoenix Convention Center Phoenix, Arizona Existing Building Commissioning (EBCx): A Strategy for Improving Your Building Performance Track: Building Performance Session: O&M Strategies for Improved Building Performance Liz Fischer Building Commissioning Association August 13, 2015

Energy Exchange : Federal Sustainability for the Next Decade The All-Encompassing Definition of EBCx Existing Building Commissioning Retro-Commissioning Re-Commissioning Ongoing Commissioning Monitoring-Based Commissioning 2

Energy Exchange : Federal Sustainability for the Next Decade 3 EBCx Process for Improved Performance Investigation Phase Investigation Phase Implementation Phase Implementation Phase Hand-Off Planning Phase Planning Phase Ongoing Cx Development of Existing Building Commissioning goals, facility requirements, and a commissioning plan. Field inspections, data gathering, testing and analysis to accurately assess system performance and identify improvement opportunities. Desired facility improvements are completed and the results and performance are verified. Systematic transition from a commissioning activity and the commissioning team to standard operating practice and the operations and maintenance team. Implementation of systems and tools to support persistence benefits and continuous performance improvement over time. Source: Building Commissioning Association – Existing Building Commissioning Best Practices

Energy Exchange : Federal Sustainability for the Next Decade The All-Encompassing Definition of EBCx What it is not: Auditing Energy Auditing Any Level of ASHRAE Auditing Building Assessments Building Tune-ups 4

Energy Exchange : Federal Sustainability for the Next Decade EBCxAudit WalkthroughXX Document Review (As built, Tenant Interviews, TAB reports, CFR, Submittals, Previous System Manuals, review O&M work request, Energy Audits/Facility Assessment documents, etc. ) X Utility Bill AnalysisXX* O&M Practices: Interviews & ReviewsXX* Facility Improvement Measurements (FIM) Identified XX* Identifying Capital Improvement OpportunitiesX System Sequence TestingX System Functional TestingX Data & Trend Logging & AnalysisX 5 EBCx vs. Audit * ASHRAE Level II or Higher

Energy Exchange : Federal Sustainability for the Next Decade MUST HAVE:  Functioning Building Automation System (BAS)  Higher Than Expected Energy Use  Mechanical Cooling  Complex HVAC Systems  Owner Support with Funding Available 6 Is Your Building a Candidate for EBCx? NICE TO HAVE:  Existing Metering a Plus  Available Documentation  Known Problems  Relationships with Established Contractors  Knowledgeable, Motivated and Available Building Staff

Energy Exchange : Federal Sustainability for the Next Decade Sample Goals Developed by the Owner 7 How EBCx Improves Operations Resolve O&M Issues Improve IAQ Identify Staff Training Needs Facility Improvment Reduce Utiilty Bills Reduce Overall Operating Costs Energy Savings Reduce Carbon Footprint Improve Energy Star Rating Or Other Benchmarks Sustainability

Energy Exchange : Federal Sustainability for the Next Decade 8 Major Stakeholders EBCx Goals Owner or Representative O&M Staff Occupants Local Utilities (Rebate Program) EBCx Provider

Energy Exchange : Federal Sustainability for the Next Decade 9 The Commissioning Team Owner/Representative Users/Tenants Operations and Maintenance Staff Contractors Commissioning Provider BCA 2015 Board of Directors at Busch Stadium for Annual Meeting – Picture Credit Jake Fischer

Energy Exchange : Federal Sustainability for the Next Decade – Master List of Findings with Facility Improvement Measures (FIMs) – EBCx Commissioning Plan – FIM Implementation – Current Facility Requirements – CFR – Systems Manual (updated) – O&M Staff Training Manual – EBCx Final Report – Ongoing Commissioning Plan 10 Deliverables from the EBCx Project

Energy Exchange : Federal Sustainability for the Next Decade The single most important sustainable and energy saving measure you can provide to improve the life of your building is…. TRAINING YOUR BUILDING STAFF! 11 Training: YES YOU MUST!

Energy Exchange : Federal Sustainability for the Next Decade Determine Level of Involvement – Who in your organization needs training Focused training should be on: – Associated FIMs implemented – System optimization techniques – Strategies for persistence and continuous improvement – Updated maintenance methods and procedures 12 Training

Energy Exchange : Federal Sustainability for the Next Decade Commissioning Providers should: Deliver curriculum and activities for the training – Interactivity is a must! Work with you to schedule the right audiences – Contractors – Building Ops personnel – Manufacturers/Vendors – Management (yes, they need training too) Work with you on location logistics – Audio / Visual equipment – Space requirements – Scheduling – Ongoing maintenance during training 13 Training

Energy Exchange : Federal Sustainability for the Next Decade 14 Training Document the training – Consider contracting with a videographer Provide lessons for follow-up Electronic file storage – ease of finding – Manufacturer literature library “Refresher” training for existing employees Continuous improvement skills training Create plan for future employees Consider post-training needs:

Energy Exchange : Federal Sustainability for the Next Decade 15 Ongoing Commissioning: Optimizing Operations Implement Persistence Strategies with the BAS Consider AFDD Tools Implement Re-Cx Process Baseline Monitoring OGCx Process – What is Ongoing Cx? Why Ongoing Cx? Building Systems Deteriorate Control Systems Deviate Equipment Performance Degrades

Energy Exchange : Federal Sustainability for the Next Decade Ongoing Cx Goals Identify issues early, resolve them quickly Increase productivity Condition-based maintenance vs. schedule-based 16 Ongoing Commissioning: Optimizing Operations

Energy Exchange : Federal Sustainability for the Next Decade Specialized Skill Sets: MEP field experience Communications, especially verbal for interviews Ability to interact equally with all levels of personnel Proven EBCx experience Commissioning certification Owner’s Selection Process: Use Qualifications-Based Selection (QBS) – not low bid! 17 The EBCx Provider

Energy Exchange : Federal Sustainability for the Next Decade 18 Thank You Liz Fischer Executive Director Building Commissioning Association 1600 NW Compton Drive, Suite 200 Beaverton, OR All Commissioning All the Time!