VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.

Slides:



Advertisements
Similar presentations
Adam H. Levin AHL Consulting May 14, BWR – Boiling Water Reactor DOE – Department of Energy DSC – Dry Storage Canister ISF – Interim Storage Facility.
Advertisements

Visaginas, 2008 INPP Decommissioning Strategy, Programme, Licensing.
Copyright [insert date set by system] by [CH2M HILL Entity] Company Confidential Update on Fukushima Daiichi NPP 1 – Preparations for Core Debris Removal.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
February 26, August 27, 2013 Entergy announces it will cease operations December 29, 2014 Permanent Shutdown April 2016 Implement.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Environmental Health and Safety Radiation Control and Radiological Services.
Nuclear program of Lithuania Dr. Vidas Paulikas, Radiation Protection Department VATESI Visaginas, 29 June 2009.
MODULE “STRATEGY DEVELOPMENT”
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Setting the Stage: Review of 2013 IEPR Nuclear Recommendations Danielle Osborn Mills Former Senior Nuclear Policy Advisor to the California Energy Commission.
Challenges in developing a Safety Case WG5. How to Develop a Safety Case SC can be a tool for providing information to stakeholders other than regulators.
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
Capabilities & Competencies An Introduction to EnergySolutions September 19, 2007 Scott Baskett Erik Vogeley.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
California Energy Commission James Madigan April 27, 2015.
NEI Presentation on Nuclear Decommissioning Trust (NDT) Use Concerns.
Presented by: Pechanga Environmental Department Designing and Managing a Recycling Program Source Reduction Strategies for Tribal Solid Waste Programs.
Group New Projects Related to Decommissioning. 29 th May 2008 KNPP Richard Benbow – Head of Kozloduy PMU.
August 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
Group Presentation to 27 th - 29 th May 2009 International Nuclear Forum BULGARIAN NUCLEAR ENERGY – NATIONAL, REGIONAL AND WORLD ENERGY SAFETY.
September 24, Joseph Lynch Government Affairs Manager, Entergy Vermont Yankee (ENVY)
1 LICENSING A U.S. GEOLOGICAL REPOSITORY WILLIAM BORCHARDT Executive Director for Operations U.S. Nuclear Regulatory Commission.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Key outcomes of IRRS Mission in Finland Kirsi Alm-Lytz.
February 26, Joseph Lynch Government Affairs Manager, Entergy Vermont Yankee, LLC (ENVY)
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
MODULE “PROJECT MANAGEMENT AND CONTROL” STAFFING AND TRAINING
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
1 West Valley Demonstration Project FY 2014 Budget Briefing Bryan C. Bower May 22, 2013.
November 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
November 12,  As of September 30, 2015, the ENVY NDT Balance was $595,733,175 ◦ Changes in the NDT are due to market losses/gains, reimbursement.
Calder Hall Sellafield Decommissioning Martin Adam Heriot-Watt Edinburgh 2008.
November 12, Joseph Lynch Government Affairs Manager, Entergy Vermont Yankee (ENVY)
 Before a company decides to close it’s power reactors the facility must be put in to a state that no longer has a residual radioactive level, clean.
The Curious Absence of New Nuclear Michael Hoeger Presented 02/06/2012.
The Challenge of Getting What You Asked For Integrated Safety Management Summit Knoxville TN August 24-27, 2009 Presented By: Patrice McEahern HNF
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
IAEA International Atomic Energy Agency. IAEA Outline Responsibilities and functions of the regulatory body Objectives of regulatory functions Organizational.
DECOMMISSIONING FROM THE FRONT LINES HISTORY, EXPERIENCE, AND THE PATH FORWARD Deb Katz Executive Director Citizens Awareness Network Contact: (413)
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Vermont Yankee- The Last Yankee Standing Bev Good Entergy Nuclear- Sr. Project Manager Boston, MA July 29,
Vermont Yankee. Boiling Water Reactor Reactor Building Carbon steel 370 Ci/m3 Concrete 3.8 Ci/m3 Spent fuel pool.
FY 2012 Budget Press Briefing February 14, NRC FY 2012 Budget NRC Mission: License and regulate the Nation’s civilian use of byproduct, source,
Decommissioning San Onofre
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
Decommissioning Issues
Emergency Preparedness During Decommissioning
Vermont Yankee Decommissioning Update
Janet R. Schlueter Senior Director, Radiation and Materials Safety
CR3 and Crystal River Energy Complex
Plant Vogtle Units 3 and 4 Alex Thirkell.
License Transfer Transaction
NRC’s Ongoing Rulemaking Activities: Recent Developments and Path Forward April 17, 2018 Spring 2018 Low-Level Waste Forum San Francisco, CA Maria Arribas-Colon,
SONGS Past, Current, and Future State May 4, 2016
Possible Transition from Operating to Decommissioning
Decommissioning Rulemaking
Research and Test Reactor Decommissioning Inspections
November , 2018 State Roundtable Reports Pennsylvania
Nuclear Decommissioning Citizens Advisory Panel (NDCAP) Certificate of Public Good (CPG) – Second ISFSI Pad & New 200 kW DG May 28, 2015.
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning

Briefing Outline 1  Introduction ---Announcement, Why was SAFSTOR selected?, VY PSDAR Timeline---  Transitioning the Facility ---People, Process, Projects, Economic Impact---  Current State - What It Looks Like  Lessons Learned / Takeaways

Introduction 2  Announcement on August 27, 2013 to shutdown Vermont Yankee based on economic analyses. Human Resources, Communications and External Affairs implemented pre-planned shutdown announcement plans.  A roadmap based on decommissioning project plans was developed. Transition the Plant Transition the Organization  Key driver in pre-planning is to reduce costs by eliminating requirements no longer applicable for decommissioning and reducing staffing.

Why was SAFSTOR selected? 3 The selection of a preferred decommissioning alternative was influenced by a number of factors at the time of plant shutdown.  Cost of each decommissioning alternative  Minimization of occupational radiation exposure  Availability of low-level waste disposal facilities  Availability of a high-level waste (spent fuel) repository or a Department of Energy (DOE) interim storage facility  Regulatory requirements, and public concerns  In addition, 10 CFR 50.82(a)(3) requires decommissioning to be completed within 60 years of permanent cessation of operations Under the SAFSTOR methodology, the facility is placed in a safe and stable condition and maintained in that state allowing levels of radioactivity to decrease through radioactive decay, followed by decontamination and dismantlement. After the safe storage period, the facility will be decontaminated and dismantled to levels that permit license termination. In accordance with 10 CFR 50.82(a)(9), a license termination plan will be developed and submitted for NRC approval at least two years prior to termination of the license.

Why was SAFSTOR selected? - Funding 4  Updated Cost Estimate to Decommission VYNPS is $1.242 Billion in 2014 dollars for SAFSTOR. Termination of the NRC Operating License - $817 Million Site Restoration - $57 Million Spent Fuel Management - $368 Million  Nuclear Decommissioning Trust (NDT) Fund is currently $664.5 Million (as of December 31, 2014)

VY PSDAR Timeline 5

Transitioning the Facility 6  People – Planning for reduced staffing levels  Process – Developing appropriate regulatory and administrative changes  Projects – Preparing the plant for a period of dormancy  Socio-Economic Impact – Community relations

7

Transitioning the Facility - People 8 OperationDormancy PreparationSAFSTOR Site Operation Operation Safety ~630 Personnel Decom Planning Organizations Wet Fuel (Hot) Management ~320 Personnel Wet Fuel (Cool) Management ~150 Personnel Dry Fuel Management ~50 Personnel Defuel Post Defuel E-Plan Fuel in Dry Storage 2 nd ISFSI Pad Needed

Transitioning the Facility - People 9  Morale / Culture  Relocation of Personnel  Skill Sets for the Organization  Attrition Management and Absorption plans  Employee Communication – over communicate and be transparent  Staffing decommissioning planning organization – early separation from operation of the facility and right skill set

Transition the Organization - Process 10  Regulatory Submittals and Engineering Analysis PDEP Adiabatic Heat-up Analysis Other examples and overall numbers  Corporate Structuring Corporate alignment and site engagement are paramount to making the transition successful.  Financial Structuring Cost tracking and cost reduction efforts  Work destruction Change management plans Processes, programs, procedures and activities are continuously reviewed and revised, deleted or maintained during the appropriate SAFSTOR Timeline period.

Transition the Organization - Projects 11  Define SAFSTOR Plant Configuration Habitability Dry Fuel Storage Fuel Pool Cooling Security E-Plan  Plan and schedule system/building abandonment Hazard removal Utility cost reduction  Implement Projects & Modifications Security Improvements Consolidation of personnel Reduction in heating and cooling costs  ISFSI / Spent Fuel Management Spent Fuel Pool Optimization vs. Spent Fuel Pool Island Pad construction Vendor selection Long term facility configuration

Transition the Organization – Socio-Economic Impact 12  Communication Plans  Public Outreach  Impact on the Local Economy  Understanding the audience and communicating on their terms Vydecommissioning.com (web and mobile) SAFSTOR Matters TV

Current State - What It Looks Like 13  Staffing Reductions Attrition Retention Absorption Facility Status Regulatory status Building status – Cold and Dark preps Permit status – Ex: NPDES  Transition to Post-Defueling Emergency Plan Change Management Culture Changes

Current State - What It Looks Like 14 We Are Here

Lessons Learned / Takeaways 15  Culture – From Operations to Dormancy  Spent Fuel Management Planning – Early Decisions  Water Management  Focus on Work Destruction  Stake Holder Management  Use of Consultants and Contractors  Project Management Organization Integration with site and corporate work efforts  Separate Decommissioning Planning from Operations

Summary 16  Learning organization: Gain understanding of decommissioning regulations Extensive benchmarking Check and adjust to regulatory and external influences Developing new processes and leveraging existing  Developed comprehensive decommissioning model for first large scale BWR to transition to SAFSTOR Pre-planning allows for cost-effective transition from operations to SAFSTOR: eliminate requirements, simplify work processes, reduce staffing  Plan on track for SAFSTOR

17 Paul Paradis Director Decommissioning Entergy Vermont Yankee