Operation & Maintenance Budget Public Works Department FY 2015-16 Budget Worksession July 13, 2015.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
Advertisements

Speed Feedback Signs Traffic Engineering Division Board of County Commissioners February 11, 2014.
Louisiana Safe Routes To School Program
Tracy Lovell, PE A FOCUSED APPROACH TO SAFETY. Provide a Transportation System  Safe  Efficient  Environmentally Sound  Fiscally Responsible.
City of High Springs - Traffic Study City of High Springs Traffic Study Sept. 16th, 2003 Public Meeting #2.
Comprehensive Pedestrian Enforcement Captain Thomas C. Didone Montgomery County, MD Police Department 1.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Funding Programs Surface Transportation Program (STP) Transportation Alternatives Program (TA) Congestion Mitigation / Air Quality (CMAQ) Highway Safety.
Transportation Department Presentation to: Consolidation of Services Study Commission, Transportation Subcommittee August 22, 2005.
Strategic Approach to a Walkable Edmonton Pro Walk / Pro Bike 2004: Creating Active Communities September 9, 2004.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
Pedestrian Safety Master Plan. This Presentation Similarities and Differences with Other Areas No Magic Bullet Site, Corridor Specific Multiple, Complementary.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Paula J. Trigg, County Engineer Public Works and Transportation Committee May 7, 2014 MODERNIZATION PROJECTS EXPANSION PROJECTS PROPOSED HIGHWAY.
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
Florida Department of Transportation, November 2009
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
From Island Estates Parkway to St. Johns County Line.
PUBLIC WORKS DEPARTMENT RED LIGHT CAMERA UPDATE FY Budget Worksession July 12, 2011.
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
Evaluation of Pedestrian Safety Countermeasures—Summary of Results, Conclusions and Lessons Learned Peyton McLeod Sprinkle Consulting, Inc. Kelley Klaver.
DRIVER SAFETY.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.
PUBLIC WORKS DEPARTMENT FY Budget Worksession July 22, 2009.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
FY Budget Worksession Community, Environmental and Development Services Department July 13, 2015.
Traffic Engineering Division Traffic Operations Traffic Administration Construction and maintenance of traffic control devices. Engineering design Signal.
1 Approaches for Integrating Systems Engineering into Your Agency’s Business Practices Presented by: Amy Tang McElwain August 2, 2007 Talking Technology.
Local Rural Highway Investment Program (LRHIP)
2015 Traffic Signals 101 Topic 2 Agreements. Office of Traffic, Safety, and Technology Agreements Signal Agreements An Agreement is a contract between.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
Public Works Department FY Budget Challenges February 16, 2010.
Right-of-Way Who Goes First?.
GROWTH MANAGEMENT FY Budget Worksession July 17, 2007.
Signs Signals and Pavement Markings
Public Works Department Operation & Maintenance Budget FY Budget Worksession July 15, 2013.
Right-of-Way laws tell all drivers who goes first in different situations. A driver must yield in the following situations:
Right-of-Way Rules. What is the right-of-Way? The right to proceed first Important things to remember: –Never assume you have the right-of-way –Right-of-way.
Roadway Median Tree Program Public Works Department July 13, 2015.
Orange County Public Works Board of County Commissioners Presentation June 16, 2015 Board of County Commissioners Presentation June 16, 2015 Roadway Median.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
October 15 th, 2013 The City of Akron SUM – Exchange Street / Cedar Street Corridor Safety Study.
Community Development Department Royal Palms Parkway City Council Workshop July 29, 2014.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
September 28, 2015 PUBLIC WORKS 101. sandyspringsga.gov Adopted City Priorities – FY
INTERNATIONAL DRIVE CRA FY Budget Worksession July 11, 2011.
Public Works/Municipal Utilities Department FY City Council Budget Workshop June 15, 2015 Presented By: Glen W. C. Kau, PE Director of Public Works/Municipal.
Indiana MUTCD: for Operations & Maintenance Issues/Solutions – Part II.
Intersections.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
Region’s Core Services 202/17/2014 Integrity ∙ Excellence ∙ Respect Provide leadership, administrative support, procurement and budgetary and financial.
Orange County Public Works Board of County Commissioners Presentation June 21, 2011 Board of County Commissioners Presentation June 21, 2011 Landscaping.
Pedestrian Facility Improvement Program
District 3 Complete Streets Projects
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Adoption of the FY Capital Improvement Program Budget & Amendments to FY 17 CIP May 8, 2017.
STREET DEPARTMENT Staffing Overview
Beachside Traffic/Crosswalk Update
Building & Property Meeting
Meeting of the Hillsborough MPO Board December 5, 2017
School Transportation Issues
Alex Henry FDOT District Seven Safety Office
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Project Location: 35th Ave HSIP8
Presentation transcript:

Operation & Maintenance Budget Public Works Department FY Budget Worksession July 13, 2015

 Organization Chart  Proposed FY Budget  Accomplishments  Budget Challenges  Summary Presentation Outline

 Organizational Chart  Proposed FY Budget  Accomplishments  Budget Challenges  Summary

Director – Mark V. Massaro, P.E. Deputy Director – Joseph C. Kunkel, P.E. Director – Mark V. Massaro, P.E. Deputy Director – Joseph C. Kunkel, P.E. Public Works Engineering Robin L. Hammel, P.E. Public Works Engineering Robin L. Hammel, P.E. Fiscal & Operational Support Ralphetta Aker, J.D. Fiscal & Operational Support Ralphetta Aker, J.D. Highway Construction Julie Naditz, P.E. Highway Construction Julie Naditz, P.E. Development Engineering Diana Almodovar, P.E. Development Engineering Diana Almodovar, P.E. Roads & Drainage Deodat Budhu, P.E. Roads & Drainage Deodat Budhu, P.E. Traffic Engineering Ruby Dempsey Rozier Traffic Engineering Ruby Dempsey Rozier Stormwater Management Rod Lynn, P.E. Stormwater Management Rod Lynn, P.E. Organization Chart

Presentation Outline  Organizational Chart  Proposed FY Budget  Accomplishments  Budget Challenges  Summary

Current FY 2015 $ Change Proposed FY 2016 Personal Services$31.7 M$1.5 M$ 33.2 M Operating Budget$68.5 M($8.2 M)$ 60.3 M Budget Change(6.6%) Staffing Proposed FY Budget

Public Works Department Operating Budget FY 15-16

Presentation Outline  Organizational Chart  Proposed FY Budget  Accomplishments  Budget Challenges  Summary

 Maintained 2,838 miles of roadway  Maintained 1,721 retention ponds  Installed 10 miles of new sidewalk  Maintained 591 traffic signals Accomplishments

 Resurfaced 190 lane miles of arterial, collector, and subdivision roads  Maintained 106,000 Traffic Signs  Maintained 220 miles of fiber optic cable for signals Accomplishments

Presentation Outline  Organizational Chart  Proposed FY Budget  Accomplishments  Budget Challenges  Summary

 Financial Impacts  Level of Service  Programs  Operational Impacts Budget Challenges

 Financial Impacts – Gas Taxes Flat – Cost Increases – County Growth Budget Challenges

Level of service same as FY 2015 Budget Challenges

Resurfacing program will continue at a 15-year cycle Budget Challenges

Right-of-way mowing remains at a 4 to 6 week cycle Budget Challenges

Retention pond mowing remains at a 4 to 6 week cycle Budget Challenges

Street sweeping remains at a 5 to 6 week cycle Budget Challenges

Tree trimming – as needed Drainage rehabilitation – as needed Budget Challenges

School zones and flashers – installed as needed Traffic signals - warranted signals scheduled for installation Traffic calming devices - MSBU's with matching funds Response to Reported Traffic Signal Malfunctions, Downed Stop and Yield Signs Level of Service Unchanged Budget Challenges

 Programs ─ Pedestrian Safety Program −Conduct corridor safety audits −Evaluate and redesign high volume multi-lane intersections −Retrofit intersection with ADA compliant ramps Budget Challenges

 Programs ─ Pedestrian Safety Program (cont.) −Identify and install additional pedestrian markings and signs at crosswalks −Install rapid flashing beacons in high pedestrian traffic areas −Install electronic driver feedback signs Budget Challenges

 Programs ─ Pedestrian Safety Program (cont.) ─ Construct pedestrian refuge islands ─ Initiate pedestrian outreach and education program ─ Evaluate corridors for roadway lighting needs ─ Increase funding for sidewalk projects Budget Challenges

 Programs ─ Railroad Crossing Safety Install Quiet Zones – Fair Lane Road – East Oak Ridge Road – East Lancaster Road – Glen Rose Avenue Partnership Grant with FDOT Budget Challenges

 Operational Challenges – Future growth will require additional operational funding – Emergency response Budget Challenges

Presentation Outline  Organizational Chart  Proposed FY Budget  Accomplishments  Budget Challenges  Summary

Summary Financial Impacts Level of Service −Remains same as FY 2015 Programs −Consistent with FY 2015 Operational Impacts

Operation & Maintenance Budget Public Works Department FY Budget Worksession July 13, 2015