TIMS/EEAA CD4CDM- Fourth Regional Workshop (Phase II) UNEP RISO / APEX Egypt-CDM Projects Ranking Criteria Tunis, Aug 27-29, 2004.

Slides:



Advertisements
Similar presentations
Energy for Sustainable Development in the ESCWA region Bader Al-Dafa Under Secretary-General and Executive Secretary July 2008 High-Level Dialogue of the.
Advertisements

Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Energy Conservation Potential of Measurement & Control Systems and Energy-Saving Equipment In Textile (Dyeing) Processes by: Dr. Attia Saad El-Din Energy.
Egypt’s National Strategy Study (NSS) on the Clean Development Mechanism (CDM) Presented by: Dr. Attia Saad El-Din Dr. Yosry Barakat TIMS CDM in Egypt.
Project 2.1 Cost-Benefit Framework: Secondary Benefits and Ancillary Services MIKE QUASHIE AND GEZA JOOS (MCGILL UNIVERSITY)
Duke Energy Carolinas Dan River Combined Cycle Project 8/17/10 For Vogt Power, my best estimate is 214 shipments (rail, truck, LTL, and small parcel- UPS.
Exhaust Heat Recovery Systems
1 Egypt GHG Mitigation Potential Eng. Maher Aziz Energy & Environment Consultant (E&E) General Director of Environmental Studies, EEHC TIMS/EEAA 2 nd Phase.
Cogeneration. Is the simultaneous production of electrical and thermal energy from a single fuel source.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
1 Costa Rica experiences related to Kyoto Protocol and other Conventions A joint effort of the Chamber of Industry of Costa Rica, CEGESTI y Technological.
State of the local economy in La Crosse County and the potential for Green Jobs Karl Green, Assistant Professor, UW-Extension, La Crosse County.
IPCC Synthesis Report Part IV Costs of mitigation measures Jayant Sathaye.
Assessing the Potential of Energy Efficiency Programmes in South Africa by Modelling Selected Policy Interventions Alison Hughes Energy Research Centre,
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
Potential Impacts of an Advanced Energy Portfolio Standard in Pennsylvania Ryan Pletka, P.E. Black & Veatch April 12, 2004 Supported by: Heinz Endowments.
POWER GENERATION TECHNOLOGIES
Wind Energy Chemical Engineering Seminar By: Jacqueline Milkovich.
Alternative Energy Development Plan (2008 – 2022), Medium - and Long – term Investment Plan and the Role of the Private Sector Mr. Rangsan Sarochawikasit.
Cogeneration.
Special Report on Renewable Energy Sources and Climate Change Mitigation IPCC WORKING GROUP 3.
Engineering Technology Division
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
Slide 1 Introduction to Renewable Energy Technologies Rural Cumbria Connects Consortium.
Energy Efficiency SS-CDM - Egypt 1 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX CDM/Energy Efficiency Projects EGYPT.
Case Study: Gemina rice husk project, Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
POWER PLANT TECHNOLOGY INTRODUCTION AND OVERVIEW Prof. Anand Bhatt.
UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments Seoul April 2002 Holger Liptow Technology Needs.
Economics of Sustainability When money speaks, nobody cares for the grammar!
Status: Karsten Brinkmann PowerMex-CHP_CO2 bensheim engineers CHP – one Possibility to reduce CO 2 Karsten Brinkmann Promotion for CHP Berlin.
Cogeneration / Distributed Generation Proposal Oakland University.
1 Adapted from T. De Lopez (2004) Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia.
Capturing Energy Waste
1 Atmospheric Vortex Engine Development and Economic.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
1 Transport Coal or Transmit Electricity? Comparative Hybrid LCA Joule Bergerson, Lester Lave, Chris Hendrickson, Scott Matthews, Alex Farrell Carnegie.
Geothermal energy GEOTHERMAL ENERGY Fausto Batini Enel – International Rome – Italy Rome, th July.
Simplified Financial Analysis for Landfill Gas Capture Projects Presented By: Dr. M. K. Elewa TIMS - Egypt Approved Baseline and Monitoring Methodology.
1 Potential Projects CDM_IRIS Morocco Potential Projects CDM_IRIS Morocco Kick off meeting, may 2003 CIEDE/CDER.
Natural Gas End Use: A Vision for Today and the Future American Gas Association Press Briefing September 22, 2009, Washington, DC Neil Leslie ,
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
National Inter-Ministerial Dialogue on Climate Change Bay Gardens Hotel Castries, saint Lucia Date, 2009 Energy Sector By Bishnu Tulsie and Judith Ephraim.
CVC Sustainable Investments November 2007 Investing in Environmental Sustainability.
Pilot Project on the Use of Flexible Instruments for Climate Policy in Baden-Wuerttemberg: A Manual to Facilitate Companies Participation Fraunhofer Institute.
Additionality and Project Cycle Tunis, August 27-29, 2004 TIMS/EEAA CD4CDM- Fourth Regional Workshop (Phase II) UNEP RISOE / APEXAdditionality in NovaGerar.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions’ reduction George Mavrotas.
Technology details, potential and experiences of Trigeneration
NEW VISION OF ENGINEERING ECONOMY COURSE (VISION) MODULE 3 LECTURE 1-2 Cairo, 13 July 2005.
Min Hydro-Egypt 1 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX EGYPT : Damietta Barrage Small Hydropower Project Eng.
Baseline Cairo, March 31 & April 1, 2004 TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEXPotential CDM Project for a Landfill in.
Financing Structures and CDM Project Risks Cairo, April 4 th –April 5 th, 2005 TIMS/EEAA Fertilizers Workshop UNEP RISOE / APEXFinancing Structures and.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 CDM Small Scale Projects portfolio in Tunisia Second National.
Djerba Carbon Exhibition Djerba, September 22-24, 2004 Egyptian CDM ProjectsCDM Project Portfolio Egypt Amr Abdel-Aziz, Ph.D. Egypt.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Sustainable Development Impact Evaluation Miriam Hinostroza.
CDM - PDD- Thu duc Plant Sep., 11, 2003 Preliminary findings of PDD– CDM model project for Thuduc fuel switching plant Master Nguyen Thi Kim Lien International.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
MED-Impact Decision-support instrument to promote renewable energy investments in the Mediterranean
UNEP Collaborating Centre on Energy and Environment Rules for Small-Scale CDM Projects Prepared for the CD4CDM Regional Workshop in Tunis January.
El Gallo Hydroelectricity Project PDD Analysis
Lecture 9: The Economic & Political Role of Airports By: Zuliana Ismail.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
Electricity Basket Price & 2013 Power Policy Hammad Hashmi Advisor Technical (USAID) MWP.
Seite 1 Seite Seite 1 CDM in Egypt Potentials and Projects Presentation by Dr. Paul H. Suding, GTZ MENA Carbon Forum 2009 Cairo,
Exhaust Heat Recovery Systems
Dominik Franjo Dominković. , I. Bačeković, D. Sveinbjörnsson, A. S
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Recommended Strategy for an Integrated National Approach to EE
Profiting from Cleaner Production
Presentation transcript:

TIMS/EEAA CD4CDM- Fourth Regional Workshop (Phase II) UNEP RISO / APEX Egypt-CDM Projects Ranking Criteria Tunis, Aug 27-29, 2004

TIMS/EEAA CD4CDM- Fourth Regional Workshop (Phase II) UNEP RISO / APEX Egypt- CDM Projects Ranking Criteria Tunis, Aug 27-29, 2004 National Criteria Economic Benefits Environmental Benefits Social Benefits - Infrastructure - Export Potential - Payback Period - Energy Savings - State of Technology Improvement in environmental performance of the CDM project compared to BAU scenario The employment opportunities generated by the proposed CDM project

TIMS/EEAA CD4CDM- Fourth Regional Workshop (Phase II) UNEP RISO / APEX Egypt- CDM Projects Ranking Criteria Tunis, Aug 27-29, 2004 Investor Interest Criteria  High Project Profitability  Creating Good International Image  Minimum Project Risk

TIMS/EEAA CD4CDM- Fourth Regional Workshop (Phase II) UNEP RISO / APEX Egypt – CDM Projects Ranking Criteria Tunis, Aug 27-29, 2004 National Criteria Criteria Indicators Allocated Weight Grade + Score ++ (Weight* Grade) Range LMH 1Economic Benefit(80) 1.01Infrastructure10L= replacing, M= expanding, H= creating 1.02 Export Potential/ import substitution 10 L  15%, 15% 35% of Annual production 1.03Payback period30 L >8 or no payback, 5<M  8, 2<H  5 years 1.04Energy savings20 L  10 %, 10% < M  15%, H> 15% TOE/year of BAU 1.05State of technology10 L= Commercially available, M = modern technology, H= advanced technology 2Environmental(20) 2.01 Improvement in environmental performance 20 L= comply with Egyptian legislation, M= comply with Annex I countries legislation, H = significantly better than Annex I countries legislation 3Social(10) 3.01Employment10 L = job reduction by project, M= no significant change in number of jobs, H= significant creation of jobs Subtotal110 Table 1: Criteria, Indicators and Their Weight for the Evaluation of Possible CDM Projects Project Code: Project Name: + L= 0, M= 1, H= 2 ++ Maximum Subtotal Score = 220

TIMS/EEAA CD4CDM- Fourth Regional Workshop (Phase II) UNEP RISO / APEX Egypt – CDM Projects Ranking Criteria Tunis, Aug 27-29, Criteria for International Investors View 4.01Profitability20 L= no return or loss on investment, M= return on investment  6%, H= ROI > 6% 4.02Investor Image20 L= project might contribute to a negative image of the investor or has no impact on image at all, M= impact of project on investors image is slightly positive, H= is very positive 4.03Project Risk30 L 90% of the probability of the generation of the expected CERs Subtotal70 + L= 0, M= 1, H= 2 ++ Maximum Subtotal Score = 140 Total180 + L= 0, M= 1, H= 2 ++ Maximum Total Score = 360 Table 1: Criteria, Indicators and Their Weight for the Evaluation of Possible CDM Projects (Cont.) Project Code: Project Name:

TIMS/EEAA CD4CDM- Fourth Regional Workshop (Phase II) UNEP RISO / APEX Egypt – CDM Projects Ranking Criteria Tunis, Aug 27-29, 2004 Score Total Weighted Average Project Code Project NameRanking Ranking Category IV.3.3Cogeneration project of 3.5 MW Capacity at Misr Elmonifia Company (Textile)1 I IV.1.1Control Systems and Energy Saving Equipment at Zenotex Dyers III.4.1Installing Dedicated CNG Engines to Replace Low Efficiency Diesel Engines IV.3.4Cogeneration project of 350 kW Capacity at Mohm Company (Metal Works) VI (5 projects) LULUCF5 II IV.3.2Cogeneration Project of 500 kW Capacity at Industrial Investment Company (Chemical) I.1.1CDM 60 MW Wind Farm in Comparison with BAU 45 MW Steam Turbine (Mixed Fuel) IV.3.5Cogeneration Project of 400 kW Capacity at Egypt Air hospital V.1.2Organic Solid Waste Digestion IV.3.1Cogeneration Project of 15 MW capacity at Bani Soeif Cement Company (Cement) IV.2.1 Using N.G & Regenerative Burners in Ezz El Dekhela Steel Company (Rolling Mills Reheating Furnaces with Capacity of 0.5 Mt/y) II.1.1Toshka PV Water Pumping12 III V.1.1Feed Stock from Organic Waste III.3.1Development of Cargo River Nile Transportation III.2.1Electrification of Alexandria Metro Line, Phase I, Abu Keer – Misr Station, 22 km II.1.2Solar Food Dehydration I.2.1 CDM Integrated Solar Thermal Combined Cycle Sys tem 300 MW in Comparison with BAU 300 MW Steam Turbine III.1.1Electrification of Cairo-Alexandria Railway Line18 Table 2: Ranked List of Proposed CDM Projects According to Criteria

TIMS/EEAA CD4CDM- Fourth Regional Workshop (Phase II) UNEP RISO / APEX Egypt – CDM Projects Ranking Criteria Tunis, Aug 27-29, 2004