Monthly Management Report Submitted By Facility Management Team

Slides:



Advertisements
Similar presentations
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Advertisements

Monthly Management Report February By Facility management Team National nanofabrication centre Indian Institute of Science Bangalore.
Drinking Water on Statia No Permanent Sweet Water Sources: Collecting and Storing Rain water Wells (Brackish)
WIYN Planning Meeting, February 28, 2013 Wisconsin, Indiana Yale, NOAO 0.9m Half Degree Imager – First Light.
Utility Management Providence Health System - Oregon Environment of Care.
Monthly Management Report November Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Achieving Strategic Energy Management Goals through Blended Learning in New York City International Conference on E-Learning in the Workplace Columbia.
Energy Conservation At Kraft Foods, Albany Boyang Li Advisor: Karl DeWahl On-site Supervisor: Clinton Buchner.
Branford Board of Education Conservation Report Efforts and Results 2001-Present Mark Deming Facilities Director Branford Board of Education November 19,
Bear Lake Township Fire Department 2015 Tanker/Pumper Replacement Millage Proposal 1.
GB Patent No Intnl Patent Pending - Peter deBoeck © Slick System of Plug-in Electrical Accessories The new concept in electrical wiring devices.
DAILY APPARATUS CHECKS The goal of a daily inspection is to ensure all systems and equipment are in proper working order before apparatus leave the station.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00031 Date: 15 January 2013 Time: 09:00.
BY Prashant P. Rane Safety, Health & Environment Gadegaon.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
Herriman City Municipal Water PowerPoint Presentation March 10, 2011.
Steve Craker K-12 Team Lead Geoff Overland IT and Data Center Focus on Energy Increase IT Budgets with Energy Efficiency.
BUILD WITH US. ™ Contractors
Water Conservation in SMEs through Small and medium enterprise.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
NATIONAL NANOFABRICATION CENTRE CLEAN ROOM COMMITTEE MEETING TUMS Murthy 26 July 2011.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
Computer Operations Group Data Centre Facilities Hitendra Patel June 2015.
Monthly Management Report january Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Monthly Management Report May Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
© 2006 MIMOS Berhad. All rights reserved. MIMOS BERHAD TENDER BRIEFING ON THE APPOINTMENT OF CONSULTANT TO STUDY AND PROPOSE POWER QUALITY.
The Future of Sludge Disposal: A Fresh Perspective after Sandy Jim Meehan – Executive Director Rahway Valley Sewerage Authority.
Monthly Management Report October Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
The Year of the Customer FE&P Reorganization: Improving for Our Customers.
Monthly Management Report December Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Explain the benefits of exterior home care Analyze home maintenance techniques.
Monthly Management Report Submitted By Facility Management Team
NATIONAL NANOFABRICATION CENTRE CLEANROOM ADMINISTRATIVE COMMITTEE MEETING TUMS Murthy 27 Mar 2012.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Energy Awareness Does NOT Save Energy Don Rainey Energy Management TAG 328 Nov. 4, 2011.
COGNIZANT TECHNOLOGY SOLUTIONS PRIVATE. LTD Monthly Review Meeting – August 2008.
Reliability Study of Power Generation System Utilizing Wind Power Derek H. Geiger DSES-6070 HV5 Term Project 31-March-2008.
Cctv Management Solution - CMS From – Intelitech Solutions Pvt. Limited. [ ITSPL Group ]
Brentwood of Palatine Condominium Board Meeting Treasurer’s Report – Cash Position – Delinquencies Rules & Regulations Laundry Natural Gas Elliot.
Monthly Management Report March By Facility management Team National nanofabrication centre Indian Institute of Science Bangalore.
VELOPEX EXTRA - X Mk 1V Automatic dental X-ray film Processor
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Aug 26, 2014 Cleanroom Admin Committee Meeting.
“ Global Safety Management: Revolution or Evolution?” Maintenance.
2015 Fall PR-MR & Marketing Meeting October 16, 2015 Fairo Mitchell Energy Policy Director, Public Utility Division Oklahoma Corporation Commission.
Electricity pricing Tariffs.
Chapter 14, Section 5. Room Service Attendant Responsibilities Selling food and beverages Delivering food and beverages Presenting food and beverages.
PSSAOWA Annual General Meeting PSSAOWA Slide 1.
Monthly Management Report Jul2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
ENCE 667 Spring Bottling Plant Upgrade José A. Faria.
TE-CRG Activities D. Delikaris, TE-CRG.
WELCOME!. Who is T&T Power Group? WELCOME! Who is T&T Power Group? What can we do for you?
IEA INTERNATIONAL ENERGY AGENCY PHOTOVOLTAIC POWER SYSTEMS PROGRAMME Overview 1.Introduction / Summary 2.PV-diesel hybrid systems 3.Measurement equipment.
Monthly Management Report September Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
 Market Survey  Design, supply, delivery and installation of a Clean Room Facility  at the entrance of the LAr detector tank,  used for the storage.
Monthly Management Report Jun2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Calcasieu Parish Mechanical Treatment Plant Inspection Program Calcasieu Parish Division of Planning and Development November, 2011.
North Penn School District
UTILITIES MANAGEMENT.
Education Efforts that Accompany Rural Water and Sanitation Projects
UNIT-III MAINTENANCE OF SAFETY
Energy Savings Projects
Chapter 16 Supplement Maintenance.
15S Maintenance.
Budget vs Actual Reporting Tool
Macpi 334, electrical + steam heated
The Survival Plan.
Presentation transcript:

Monthly Management Report Submitted By Facility Management Team CeNSE Centre for Nano Science and Engineering 22 April 2017 Monthly Management Report November 2011. Submitted By Facility Management Team Monthly Report-(Jul 2011) Facility Management

CeNSE 22 April 2017 EXECUTIVE - SUMMARY This report is a review on our performance during the last Month and is an attempt to analyse and evaluate our service delivery and make a progressive step forward with improvement plan. The following points are put forward for review Scope and nature of services Proposed manpower distribution. Availability of manpower. Major incidents summary. Initiative taken. Initiatives planned for next month. Power failure analysis Monthly HSD consumption. DG- Generated power KWH. EB power consumption. Average power consumption EB+DG. Suggestions and requirements. Transition pending works. Facility Management

Scope & Nature of Services CeNSE 22 April 2017 Scope & Nature of Services BMS ETP & Ultra Pure water system Electrical CeNSE-Facility Management Help desk HVAC Plumbing Facility Management

PROPOSED MANPOWER DISTRIBUTION CeNSE 22 April 2017 PROPOSED MANPOWER DISTRIBUTION Facility Management

Availability of Manpower CeNSE 22 April 2017 Availability of Manpower DESIGNATION Planed July August September October November Facility Manager 1 Technologist 3 Electrician 4 2 Chiller operators BMS operator Plumbers Asst.Technician Total 15 10 11 13 Facility Management

Major Incidents Summary Date Location Details Failure analysis 3.11.11 Utility 2nd floor At 22:30 Hrs, 500 KVA UPS out going power supply got off. . UPS internal module faulty. Replaced by Vendor.(5-11-11) 7-11-11 CeNSE At 15:00 Hrs, Power failure. Transformer primary supply failure, Ring main unit closed by CCMD people. 21-11-11 Utility building Make up tank over flow. Float valve/Sensors not functioning. Repaired by Vendor. 30-11-11 House vacuum not functioning. House vacuum rotor bearing damaged and sent for repairing.

Initiatives taken Photos CeNSE 22 April 2017 Initiatives taken Unwanted materials shifted from ETP plant& cleaned. Fab building new UPS cable alternation works done. DI water cleaned. Utility building 2nd floor cleaned (Chemical storage area). . Photos Facility Management

Initiatives Planned for next month CeNSE 22 April 2017 Initiatives Planned for next month Transition of utility. Full filling of manpower. PPM implementation. Old cleanroom equipment shifting. Facility Management

POWER FAILURE ANALYSIS DATE FROM TO TOTAL 7-11-2011 15:30 16:15 45 mins 18:10 4:30 10.20 Hr 15-11-2011 12:40 14:10 1.30 Hr TOTAL HRS 12:35 Hrs

MONTHLY HSD CONSUMPTION CeNSE 22 April 2017 MONTHLY HSD CONSUMPTION Facility Management

CeNSE 22 April 2017 DG Generated Power KWH Facility Management

CeNSE 22 April 2017 EB Power Consumption   Facility Management

AVERAGE POWER CONSUMPTION EB+DG CeNSE 22 April 2017 AVERAGE POWER CONSUMPTION EB+DG Facility Management

Suggestions and Requirements Shelters to be provided for DGs to avoid rain water and leaves come inside the DG cabin. FPS & FAS system to be commissioned as early as possible to face any crisis in the building. First aid box to be provided . Tools and materials required for O&M team. PC with internet connection and telephone to be provided for maintenance team. Shoes to be arranged for cleaning chemicals.

Transition – Pending works  

Thanks by, Facility Management Team