WisDOT Bureau of Technical Sevices Spring 2014 QMP Training Base Compaction SPV’s and Project Design Guidance.

Slides:



Advertisements
Similar presentations
DIVISION 5 SUBCOMMITTEE OCT 2014 Update. The Washington Chapter is one of 67 local chapters in the US and Canada which make up the American Public Works.
Advertisements

2014 Washington Asphalt Conference “Specification Update & Initiatives” Joe DeVol Assistant State Materials Engineer State Materials Laboratory.
2015 State Aid Conference Ramsey County Office Arden Hills, Mn February 19, 2015.
Joe White (608) Wayne Chase (608) WisDOT Materials Management Section 1.
Asphalt Specification Changes July 2005 Contractor Asphalt Training Rich Hewitt, PE District Bituminous Engineer District Five Materials & Research.
Caltrans Changes SECTION 39 “Hot Mix Asphalt”
Test Result Relationships
QUALITY CONTROL More Makes Money Less Leads Losses
Outline Specification Update ASP-6 Upcoming ASP-6, March 2013 CMM Update Quality Management Program (QMP) What’s New? Review Non-Performance Source Documentation.
MICHIGAN RIDES ON US 2015 Local Roads Workshop Gaylord March 12, 2015.
1 Quality Control Program. 2 Objectives To know: To know: –How the QC Program is Doing –Effect of Specification Changes on the QC Program –Contractor.
Proctor Compaction Test for Maximum Dry Density
Intelligent Compaction Research & Development and QA Activities Richard B. Duval, P.E. Construction Research Engineer Infrastructure Research & Development.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
1 Overview CQC Asphalt Specifications.  Payment based on Contractor’s Quality Control tests.  FDOT runs verification tests at a lesser frequency. 
Asphalt Quality Assurance Program
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Structure and Responsibility
Chapter 5 Patching and Edge Repair
EARTHWORK RECORD SYSTEM
2002 FDOT/FTBA Construction Conference
03-0F2204 Sly Park Road UC (Replace) Prebid Outreach Meeting: CIP Structural Concrete Materials Specification Overview John Yang, P.E. Office of Structural.
 Quality Management Program (QMP) Review  HTCP Program  IRI News.
Warm Mix for a Cold Climate Update on Colorado DOT’s 2007 WMA Project on I Rocky Mountain Asphalt Conference and Equipment Show.
NVLAP Overview and Accreditation Process March 2006.
Update on End Result Specifications Celik Ozyildirim, Ph.D., P.E.
1 8/29/2015WisDOT BTS MMS.  MIT – Materials Information Tracking (Field Version) Used by WisDOT/Consultant/& Municipal staff in the field to enter a.
11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 1 QMP Specifications QMP base aggregate QMP base aggregate Review and comment.
WELCOME TO TRAINING PROGRAMME FOR CONSULTANTS’ SERVICES FOR 3 rd PARTY QUALITY CONTROL AND QUALITY ASSURANCE G. PRABHAKAR.
Florida Department of Transportation 1 Overview of CQC Asphalt Specifications.
Developing a Mixture-Based Specification for Flexible Base.
NC Region Speakers:. Now What?  EBS  Pothole  Vac Truck  T & M  Force Account  Con Mod/Change Order  LCS  QMP (QC, QV, IA)  QC  QV  IA Excavation.
Allen Hughes State Materials Office
 Have an approved mix design before paving.  The department has eliminated the use of PG -22 Asphaltic Material and replaced it with PG -28.  Tack.
Asphalt Roadway Daily Report of Quality Control (Form No ) A step by step guide.
2014 NCR Construction Conference Materials Presentation John Brophy Jeff Michalski
Laboratory QA/QC An Overview.
 Documentation Requirement  All records should contain sufficient detail to sustain an audit and be clear enough to be read and understood by persons.
Soil Compaction Topic I Topic I.
1 PTCS Training, Certification and Quality Assurance Equivalency November 4, 2003.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
PAPA Regional Meetings Meetings with PAPA in 2012: –January Remove and Replace Defective Material –May Table “H” instituted after PAPA meeting –June.
Paving the way for over 60 years Presentation at the January 10, 2007 NCAUPG Technical Conference By Dusty Ordorff Bituminous Roadways, Inc.
WisDOT Bureau of Technical Sevices Spring 2014 QMP Training Base Compaction SPV’s and Project Design Guidance.
2007 KYTC/KAHC Information Exchange Meeting “Asphalt Materials” Allen H. Myers Division of Materials, Asphalt Branch March 16, 2007.
3 - 1 Holding The Contractor to 105% of the Target Spread Rate!
Materials. New for 2014  MITSCAN for concrete pavement thickness acceptance  QMP Density for Base  Lean Government Timeline  WDMP HTCP Training 
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association.
Contractor QC Wesley Glass Kentucky Transportation Cabinet 2007 KAHC/KYTC Meeting Bowling Green/Lexington, Kentucky.
Midwest Geotechnical Conference Indianapolis, Indiana September 22, 2015 Bob Arndorfer.
1 PWL/Local Acceptance 2013 demonstration Projects Three Possibilities - DOT does all testing - DOT does verification testing of 20% of samples & uses.
Russian Engineers Training March 2011
Quantity Calculations Module 3. Quantity Calculations  Specifications  Post Bid Quantity Calculations  Production Quantity Calculations –Checking Yield.
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
BSB Biomanufacturing CHAPTER 4 GMP – Documentation Part I (SOP)
CONCRETE MIX DESIGN.
QC Document Update Todd Shields, INDOT.
Alabama Asphalt Pavement Association
Construction Management
Chip Seal Quality Assurance Guide
Quality Control Personnel Training
Emulsion Task Force Meeting
Quality Assurance for Emulsified Asphalt Surface Treatments
Materials and Tests Engineer
Prime Factors for Successful Preservation Treatments
Materials and Tests Engineer
Material Sampling & Handling Cameron Richardson – Vulcan Materials
Presentation transcript:

WisDOT Bureau of Technical Sevices Spring 2014 QMP Training Base Compaction SPV’s and Project Design Guidance

2  How’d we get here  Project selection/design guidance  SPV highlights  Still to come

3  2013 pilot projects  IH-43 Ozaukee Co.  USH 63 St. Croix Co. (x2)  STH 179 Crawford Co.  STH 29 Brown Co.  STH 153 Marathon Co.  Spec revisions  1 ¼ – Inch BAD  Mill/Pulverize and Relay  STH 47 Vilas Co.  USH 51 Lincoln Co.  STH 73 Wood Co.  STH 29 Marathon Co.  Fishel Road Forest Co.

 HMA surfaced mainline  AND QMP Subgrade and/or Subgrade improvement  AND 30,000 tons+  Between 2010 and 2013  17% of all let projects  31% of HMA projects  54% of HMA projects with 1-1/4” base agg. 4 ProjectSelection – Base Agg. Dense Project Selection – Base Agg. Dense

 Minimum Mill and Relay or Pulverize and Relay Quantity of 40,000 SY  Between 2010 and 2013  3% of all let projects  43% of pulverize and relay projects  56% of mill and relay 5 Project Selection - Mill/Pulv. & Relay

 QC plan  IA requirements  Personnel requirements  93% of target density  Test frequency  “Failing” test/corrective action  Measurement and payment 6 Special Provision – Highlights

 Organizational chart  Communication process  Source locations list (1 ¼” spec only)  Stockpiling and hauling methods (1 ¼” spec only)  Process control problem resolution process  QC lab, sample, and documentation storage locations  Estimate of locations and calculated quantities to be tested under this provision. 7

 Personnel  HTCP Nuclear Density Technician I  Or ACT certified technician  IA  According to the Department’s independent assurance program 8

 1 ¼ - Inch Base Aggregate Dense  ≤20% Recycled Material  Modified Proctor Max Dry  >20% Recycled Material  Mod. Proctor Max Wet  Mod. Proctor Max Dry  Control Strip  Mill/Pulverize and Relay  Control Strip 9

 1 ¼ - Inch Base Aggregate Dense  Density – 1 per 1500 tons  Gradation – 1 per 3000 tons  Proctor – initial and then if trigger met  Mill/Pulverize and Relay  Density – 1 per 3000 tons  Proctor – initial and then if trigger met  CA – Optional Information  Process control decisions  Troubleshooting  Limiting liability and/or corrective action limits 10

 1 ¼ - Inch Base Aggregate Dense  Gradation change > 10.0%  Source change  Recycle material blend change > 10.0%  Density > 103% on two consecutive measurements  If using control strips; thickness change > 2.0 inches  Mill/Pulverize and Relay  Layer thickness change > 2.0 inches  Density > 105% or <90.0%; AND outside of range of 10 avg control strip shots; on three consecutive measurements 11

 Density and gradations  30% of Contractor Frequency  Target densities;  Same triggers as QC  Control Strips  QV person must be present and verify sufficient compactive effort (including addition of water)  Will use same value as contractor 12

13  Evaluate QV and QC sampling and testing  May include one or more of the following:  Split sample testing  Proficiency sample testing  Witnessing sampling and testing  Test equipment calibration checks  Additional sampling and testing

14

 1 ¼ - Inch BAD; Tons  Mill/Pulverize and Relay; SY  Water; MGal 15

 Facilities Development Manual guidance – March 2014  Project selection guidance  Water bid item  10 – 20 gallons per ton 1 ¼ - Inch BAD  3 – 6 gallons per SY Mill/Pulverize and Relay  Revisions – Fall 2014  Conversion to STSP – Spring Still To Come

Questions Now or On Projects or (608) ftp://ftp.dot.wi.gov/dtsd/bts/pavement/Base_Comp_Docs