The ITER Neutral Beam injectors

Slides:



Advertisements
Similar presentations
FIGURE 7.1 Elements of the final control operation.
Advertisements

TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
1 MICE Target Status Chris Booth 3 rd March 2004.
INFN Milano, Universita` degli Studi Milano Bicocca Siena IPRD May Testbeam results of the CMS electromagnetic calorimeter Alessio Ghezzi.
FAIR accelerator R&D Oliver Kester GSI Helmholtzzentrum für Schwerionenforschung Darmstadt and IAP Goethe-Universität Frankfurt.
FOM-Institute for Plasma Physics Rijnhuizen Association Euratom-FOM T E CT E C T E CT E C Carbon Chemical Erosion Yield Experiments in Pilot-PSI Jeroen.
Examples of ITER CODAC requirements for diagnostics
27-28 October 2008C&I Colloquium – P.Thomas Colloquium on ITER-CODAC Plant Control Design Handbook Paul Thomas Fusion for Energy Joint Undertaking, Barcelona.
ITER CODAC Plant Control Design Handbook October 2008
ITER Organization, Cadarache, France
0 - 0.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Year 6 mental test 10 second questions Numbers and number system Numbers and the number system, fractions, decimals, proportion & probability.
Low Alpha & CSR in the MLS (PTB) G. Wüstefeld (BESSY) et al, ESLS XVI, Daresbury, Nov 28th Low Alpha Optics and Coherent Synchrotron Radiation.
TDC130: High performance Time to Digital Converter in 130 nm
Multi Beamlett Extraction Experiments and Sector Magnet Field Investigation.
H-mode characterization for dominant ECR heating and comparison to dominant NBI or ICR heating F. Sommer PhD thesis advisor: Dr. Jörg Stober Academic advisor:
Plasma Window Options and Opportunities for Inertial Fusion Applications Leslie Bromberg Ady Herskovitch* MIT Plasma Science and Fusion Center ARIES meeting.
Chapter 3. HVAC Delivery Systems
ECE 495: Integrated System Design I
High pressure RF cavity project Katsuya Yonehara APC, Fermilab 2/28/11 - 3/4/111.
Status and Future of BESSY RF BESSY II operating since 1999 Willy Wien Laboratory groundbreaking 9/2004 HoBiCaT Testfacility for sc cavities Commissioning.
The CRB Project for MedAustron
Electricity supply contracts CLIC Workshop 04/02/2014 F. Duval.
Development of the FLNR Cyclotron Complex /2009 Priority 1 Dubna,
Gas Quality E.ON Gastransport SIMONE Congress 2008, Dubrovnik Jörg Bödeker, Dr. Dietrich Weise.
RF Specification discussion MICE RF workshop 16 th April 2012.
1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.
EE 4BD4 Lecture 15 Strain ( force) Gauges, pressure sensors and Load Cells 1.
Cyclotron Refurbishing & Development Meeting March 6, 2008.
Proposal for a programme of Neutrino Factory research and development WP-3 The Target The Neutrino Factory Target Lead Author - J R J Bennett CCLRC, RAL.
Addition 1’s to 20.
H – Ion Source Development at RAL & FNAL PASI Meeting, RAL 3 rd April 2013 Scott Lawrie & Dan Faircloth (RAL) Dan Bollinger (FNAL)
Slippery Slope
Test B, 100 Subtraction Facts
SNS Spallation Neutrino Source 1 SNS layout GeV proton linear accelerator Accumulator ring Main target Stripping foil.
Week 1.
Mats Lindroos Will we ever do a beta-beam design study beyond the present CERN-Frejus baseline? Mats Lindroos.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
MCS LWC MAGNUM ORIGINAL CONCEPTS  Designed to Control Loop Systems  Build to be generic and handle many configurations of Loop Controllers  Type of.
PPPL ST-FNSF Engineering Design Details Tom Brown TOFE Conference November 10, 2014.
F. GnesottoFrascati, 19 gennaio 2007 Giornata di presentazione del Progetto ITER all’Industria italiana Ruolo dell’Associazione Euratom-ENEA Prof. F. Gnesotto,
1/13 T. Inoue NEUTRAL BEAM INJECTION R&D on Ion Sources and Accelerators FT/1-2Ra: 1 MeV accelerator and uniformity R&D on a High Energy Accelerator and.
17 th IAEA TM on Research Using Small Fusion Devices, Lisbon B. Schunke 1 B. Schunke D. Bora, J.-J. Cordier, R. Hemsworth, A. Tanga V. Antoni & RFX Team.
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
Development and validation of numerical models for the optimization of magnetic field configurations in fusion devices Nicolò Marconato Consorzio RFX,
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
Ursel Fantz for the IPP-NNBI Team 16 th ICIS, New York City, USAAugust 23-28, 2015 Towards 20 A Negative Hydrogen Ion Beams for Up to 1 hour: Achievements.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
High Current Electron Source for Cooling Jefferson Lab Internal MEIC Accelerator Design Review January 17, 2014 Riad Suleiman.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Brief description of the INAF/IAPS facility. The IAPS-INAF plasma chamber is designed to reproduce a large volume of plasma with ionospheric parameters,
Ion Sources – Hardware and Operation MACS Week Friday 8th October 2010 PP a-LPE, 8 th October 2010, MACS Week 2 Liviu Penescu, „Ion Sources.
NCSX NCSX CDR May 21-23, 2002 H.W. Kugel Slide 1 Conceptual Design for NCSX Auxiliary Systems Heating, Fueling,Wall Conditioning and Vacuum Systems.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
/ 14 (FIP/2-5Ra) Development of DC ultra-high voltage insulation technology for ITER NBI H. Tobari et al., (JAEA) (FIP/2-5Rb) Progress in long pulse production.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Areal RF Station A. Vardanyan
12-luchetta-RFX-3-O Integrating Supervision, Control and Data Acquisition – The Neutral Beam Test Facility Experience A. Luchetta, G. Manduchi, C.Taliercio.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
1 Institute For Plasma Research, Bhat, Gandhinagar, Gujarat, India
UITF MPS system requirements
Advanced Research Electron Accelerator Laboratory
UITF Conduct of Operations Review
Presentation transcript:

The ITER Neutral Beam injectors Antonio Masiello A.Masiello – Colloquium on the ITER-CODAC “Plant Control Design Handbook” - 27-28 October, Barcelona

Neutral Beam injection: principles Residual ion Dump (RID) Accelerator Ion source Neutraliser Plasma D beam A.Masiello – Colloquium on the ITER-CODAC “Plant Control Design Handbook” - 27-28 October, Barcelona

The configuration of the NB injectors in ITER A.Masiello – Colloquium on the ITER-CODAC “Plant Control Design Handbook” - 27-28 October, Barcelona

The Neutral Beam injector A.Masiello – Colloquium on the ITER-CODAC “Plant Control Design Handbook” - 27-28 October, Barcelona

NB Power balance and main specifications BEAM BEAM BEAM LINE BEAM LINE 55 55 ¸ ¸ 59 59 SUPPLY SUPPLY SOURCE SOURCE 40 40 16 17 ¸ ¸ 20 20 INPUT INPUT 0.05 0.05 The NB injector POWER POWER 17 17 ¸ ¸ 18 18 to to PLASMA PLASMA 1 1 2 2 ¸ ¸ 4 5 0.2 4 4 ¸ ¸ 8 8 5 5 5 CALORIMETER 0.6 TRANSMISSION LINE ION SOURCE NEUTRALISER DUCT OTHER COMPONENTS POWER SUPPLY RID ACCELERATOR Power delivered to the plasma per injector 16.5 MW Beam energy 1 MeV Ion species D- Accelerated ion current at the grounded grid 40 A Average accelerated ion current density at the grounded grid 200 A/m2 Current density uniformity over the extraction area  10 % Pulse length ≤ 3,600 s A.Masiello – Colloquium on the ITER-CODAC “Plant Control Design Handbook” - 27-28 October, Barcelona

The ion source Half size ion source test facility Courtesy of IPP-Garching Rear view of the RF ion source A.Masiello – Colloquium on the ITER-CODAC “Plant Control Design Handbook” - 27-28 October, Barcelona

The MAMuG accelerator 1MV accelerator 5 stages of 200kV 1 segment 1280 apertures 4 segments x 4 groups, 5x16 apertures in a group A.Masiello – Colloquium on the ITER-CODAC “Plant Control Design Handbook” - 27-28 October, Barcelona

The Beam Line Components Neutraliser Rid Calorimeter Max heat load [MW] 4.56 20 22 Max PD [MW/m2] 2.1 6 Max water flow [Kg/s] 30 90 198 The Beam Line Components Neutraliser Calorimeter RID A.Masiello – Colloquium on the ITER-CODAC “Plant Control Design Handbook” - 27-28 October, Barcelona

The NB high vacuum pumping 1 section Cryopanel: 4.6K supercritical He Shielding: 80K gaseous He 1 module with 4 sections in parallel Neutraliser A.Masiello – Colloquium on the ITER-CODAC “Plant Control Design Handbook” - 27-28 October, Barcelona

The Power supplies A.Masiello – Colloquium on the ITER-CODAC “Plant Control Design Handbook” - 27-28 October, Barcelona

The Power supplies A.Masiello – Colloquium on the ITER-CODAC “Plant Control Design Handbook” - 27-28 October, Barcelona

Neutral Beam Test Facility at Padua - Italy The main risk mitigation measure for resolving NB issues The NBTF lay-out reproduces the one of the ITER NB-1 A full size source to start in 2012 A full neutral beam line to start in 2014 A.Masiello – Colloquium on the ITER-CODAC “Plant Control Design Handbook” - 27-28 October, Barcelona

Global operating states Construction and Long Term Maintenance (LTM) Short Term Maintenance (STM) Test and Conditioning Operation (TCS) Cryopump regeneration at 400 K Cryopump cool-down Cryopump warm-up to ambient temperature HV conditioning over extraction and acceleration grids ion source plasma without extraction ion beam accelerated ion beam neutralized residual ion dump active Short Term Stand-by (STS) Cryopump regeneration at 100 K Pulse Operation State (POS) Beam on calorimeter Beam on target without plasma Beam on target with plasma: beam normal operation of in ITER pulse. Beam is interlocked (e.g. tokamak plasma density) A.Masiello – Colloquium on the ITER-CODAC “Plant Control Design Handbook” - 27-28 October, Barcelona

Control system main parameters The NB Injector Control System will control the following main parameters: Power to the RF driver Plasma grid current Bias Voltage Extraction grid voltage Acceleration grids voltages Residual Ion dump biasing Caesium oven temperature Gas flows Fast shutter control (and absolute valve) Beam on/off-axis injection Magnetic compensation coil current … A.Masiello – Colloquium on the ITER-CODAC “Plant Control Design Handbook” - 27-28 October, Barcelona

Control system preliminary architecture (NBTF) CSS Central Safety System CIS Central Interlock System PSS Plant Safety system PIS Plant Interlock System Courtesy of the RFX Association A.Masiello – Colloquium on the ITER-CODAC “Plant Control Design Handbook” - 27-28 October, Barcelona

Main acquisition requirements The data acquisition system of each NB Injector will include the instrumentation needed to condition, record, display and analyze the measured signal coming from the beam line Standard analog inputs to CODAC some thousands Standard digital inputs to CODAC about 100 Standard digital outputs from CODAC about 100 Timing outputs from CODAC few Temperature measurements Status signals Gas pressure meas. Residual pressure meas. B field (static) meas. Position transducers Water and gas flow meas. …… Most of the signals sampling speed is 10-100Hz For higher speeds up to MHz, a baseline speed of KHz is foreseen and an event driven acquisition with a window of few ms to acquire the signal up to some MHz Fastest interlock 100ms A.Masiello – Colloquium on the ITER-CODAC “Plant Control Design Handbook” - 27-28 October, Barcelona

References ITER neutral beam heating and current drive system 2001 Design Description Document N53 DDD V. A., Final reports, EFDA contract: TW6-THHN-NBD1 A. Luchetta et al., Final report - Preliminary specification of the architecture of the control, interlock and safety systems for the NB test facility - EFDA contract: TW6-THHN-NBTF1 Plant control design handbook https://user.iter.org/?uid=27LH2V&version=v3.0 Systems Requirement Document (SRD) NBH and CD PBS 53 L. Svensson, private communication A.Masiello – Colloquium on the ITER-CODAC “Plant Control Design Handbook” - 27-28 October, Barcelona