Presentation to European UAS Panel 2nd Workshop

Slides:



Advertisements
Similar presentations
NATO FINAS Cdr Max Snow, Royal Navy Chairman, NATO FINAS
Advertisements

Direction générale de lAviation civile Ministère de l'Écologie, du Développement durable, des Transports et du Logement Direction des Services de la Navigation.
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
Insertion of UAS into the Spanish Airspace: Lessons learned Pablo González Brussels, 14 September 2011.
By Andy Knill Head of Surveillance and Spectrum Management UK Civil Aviation Authority.
Unmanned Aircraft Systems EUROCONTROL ATM Integration
The EDA approach to ATI. A European civil/military way ahead Brussels, 9th February 2012 Giampaolo LILLO, EDA Armaments Director.
Future Communications Infrastructure – An update
Paris Mar 2011 Preparations for WRC-12 WRC -12 AGENDA ITEM 1.3 ON UAS Presented by John Taylor EUR RPS for WRC-12 preparation.
Cairo Sept 2010 Preparations for WRC-12 WRC -12 AGENDA ITEM 1.3 ON UAS Presented by John Taylor MID RPS for WRC-12 preparation.
Loftur Jónasson, ICAO 11 March 2013
Aerospace Vehicle Systems Institute Update on WAIC Issues ITU-R Working Party 5B and Future Regulatory Considerations Joe Cramer December 16, 2009.
Aeronautical Frequency Spectrum Management and ACP WG-F
ESA Iris Programme workplan of activities
ESA Iris Programme: status
WRC-15 Agenda Item 1.5 Fixed Satellite Service spectrum to support the safe operation of Unmanned Aircraft Systems Aeronautical Spectrum Workshop Preparation.
Direction générale de lAviation civile Ministère de l'Écologie, du Développement durable, des Transports et du Logement Direction des Services de la Navigation.
John Taylor Nairobi, Kenya Sept 3-4, 2013 Concept of ADS-B via Satellite 1.
Feb 2004ICAO ACP WGF,1 WRC 2007 agenda item 1.6 Work plan for Additional aviation spectrum allocation for AM®S Presented by C. Pelmoine, EUROCONTROL.
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
SATELLITE DATA LINK SYSTEM (SDLS)
Service Technique de la Navigation Aérienne NexSAT: Mission Hypothesis 20 may, 2003 STNA/31 ATM issues at horizon 2015 over ECAC Capacity: - VHF spectrum.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
Casa RPAS regulatory Development
PROPOSED AMENDMENT TO THE DRAFT ICAO POSITION FOR THE INTERNATIONAL TELECOMMUNICATION UNION (ITU) WORLD RADIOCOMMUNICATION CONFERENCE 2015 (WRC-15) APAC.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
WRC–12 Industry Debrief 23 April 2012 Agenda item Agenda item 1.2 – Enhancing the international spectrum regulatory framework Presenter: Jason Ashurst.
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.21 – Radiolocation service 15.4–15.7 GHz Presenter: Darrell Ninham.
ICT ONERA, Toulouse, France, 6. November 2007 Spectral Efficient COMmunications for future Aeronautical Services Jan Erik Håkegård
International Civil Aviation Organization WRC-15 Agenda Item 1.5 Fixed Satellite Service spectrum to support the safe operation of Unmanned Aircraft Systems.
International Civil Aviation Organization Remotely-Piloted Aircraft Systems Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok,
PRESENTATION ON THE WORK OF WORKING GROUP 11 ON SPECTRUM MANAGEMENT EACO Seminar for Chairpersons of National Regulatory Authorities 28 May 2015 Kigali.
10/31/06 F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Unmanned Aircraft Systems in Civil Aviation.
WRC-2003 Mike Goddard Spectrum Policy and International Director Radiocommunications Agency.
Spectrum for UAS UAS at WRC-12 European WRC-12 preparation Martin Weber, Federal Network Agency, Germany EU UAS Panel Workshop Brussels,
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.3 – Unmanned aircraft systems Presenter: Bill McDonald.
Frequency Management Office 1 The Space Frequency Coordination Group (SFCG) ESF WorkshopCagliari, 29 October, 2004.
Key results of World Radiocommunication Conference (WRC-07) DOCUMENT #:GSC13-GRSC6-12 FOR:Presentation SOURCE:ITU-R AGENDA ITEM:GRSC 8 CONTACT(S):Kevin.
WRC–12 Industry Debrief 23 April 2012 Agenda item 8.2 – Future WRC Agendas.
Agenda item 1.5 Use of the Fixed Satellite Service by Unmanned Aircraft Systems.
Mobile Broadband B3G for Professionals By Alan Dearlove Radtel Services and Steffen Ring Director, M.Sc.E.E. Chairman Project MESA Steering Committee.
International Telecommunication Union Document WRC-15-IRWSP-15/16-E 1 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
CEPT position on WRC-12 AI’s 1.3, 1.4, 1.7, 1.12 and 1.25
WRC-15 Agenda Item 1.5 Fixed Satellite Service spectrum to support the safe operation of Unmanned Aircraft Systems Aeronautical Spectrum Workshop Preparation.
Additional aviation spectrum allocation for AM®S
ESA Iris Programme: status
ESA Iris Programme workplan of activities
Preparations for WRC-12 WRC -12 AGENDA ITEM 1.3 ON UAS
ICAO Position for ITU WRC-15
broadband applications, in accordance with Resolution 233 (WRC-12)
Gerhard Mayer & Darrell Ernst ETTC 2007 Toulouse
Remotely-Piloted Aircraft Systems
PROPOSED AMENDMENT TO THE DRAFT ICAO POSITION FOR THE INTERNATIONAL TELECOMMUNICATION UNION (ITU) WORLD RADIOCOMMUNICATION CONFERENCE 2015 (WRC-15) APAC.
ITU Working Party 8B Activities
Loftur Jónasson, ICAO 11 March 2013
Military Airworthiness Harmonisation Workshop
Concept of ADS-B via Satellite
ICAO Position for ITU WRC-15
Agenda Item 6 GNSS Development Status and Future Work Eric Chatre, EC/ESA Rapporteur Technical WG, GNSS Panel Thank you… Good morning… I am ... and.
Bundesnetzagentur Use of the Fixed Satellite Service for RPAS C2 link (ITU Resolution 155 (WRC-15)) Martin WEBER REGIONAL PREPARATORY GROUP.
Future Communications Infrastructure – An update
Werner Mohr, Siemens Networks, Munich, Germany
WRC-12 A.I. 1.3 Eric ALLAIX DGAC-DSNA.
Doriana Guiducci, European Communications Office
Remotely-Piloted Aircraft Systems
WRC-15 Agenda Item 1.5 Fixed Satellite Service spectrum to support the safe operation of Unmanned Aircraft Systems Aeronautical Spectrum Workshop Preparation.
Draft ICAO Position for ITU WRC-15
WRC-15 Agenda Item 1.5 Fixed Satellite Service spectrum to support the safe operation of Unmanned Aircraft Systems Aeronautical Spectrum Workshop Preparation.
Draft ICAO Position for ITU WRC-15
Presentation transcript:

Presentation to European UAS Panel 2nd Workshop Frequency Spectrum Ivan Martin Thales On behalf of

With no Spectrum, UAS will not exist No Frequencies, No UAS UAS have a stringent need of radio-frequencies both for C2 and Payloads Depending on system requirements and architecture, data link diversity and redundancy is a crucial element for UAS design, certification, qualification and cost-efficient world-wide operation in non-segregated airspace. Spectrum is overcrowded, resource is scarce Interferences and poor communication protection can jeopardize the future use of UAS ITU is regulating Spectrum management and will hold its next WRC in 2012 with dedicated agenda for UAS: C2 ATC exchanges Sense & Avoid exchanges ITU-R process must be successful for UAS * With no Spectrum, UAS will not exist

ITU-R Status – WRC12 Agenda item 1.3 European position to be finalized Terrestrial component (LOS) Spectrum Requirement: 34 MHz New AM(R)S allocations (Safety of flight communication band) 5030 – 5091 MHz most likely band Satellite component (BLOS): Method A2 Spectrum Requirement: 56 MHz Current allocations (no need of new allocation) AMS(R)S: L band in early phase, 5 GHz later on or MSS/AMSS (if ICAO modifies its current position) No show stopper identified European Industry supports the elaboration of a consensual position

Stanag 4660 Industry perspective NATO NIAG SG-140 (2009-2010, 34 industries) has the objective to standardize C2 LOS data link for TUAV, MALE, HALE, UCAV STANAG 4660 Ed 1 ratification foreseen 2011 / beginning 2012 Bandwidth required: 50 to 100 MHz Trend is to adopt NATO C Band (4400 – 4990 MHz) or alternate L/S bands Industry position in favour of NATO C band Adoption of the bands [4400 MHz – 4900 MHz] for NATO and [5030 MHz – 5091 MHz] for civil is a technical optimum A single airborne terminal could be used both in segregated and non segregated airspace (like V/UHF radios) A good example of potential civil – military synergy

Key supporting studies SIGAT (contracted by EDA), study on the military frequency spectrum requirements for UAS GAT insertion, 23 partners, 9 Nations, 2009-2010 EDA / ESA (ARTES 20) study on satcom solutions for UAS ESA (ARTES 1) "ESPRIT" study on emerging system concepts for UAS C2 via satellite NATO NIAG SG140 (NATO Industrial Advisory Group) and STANAG 4660 : “Tuneable UAS Interoperable Command and Control Data Link” Supporting studies are a way to converge on jointly agreed industry positions in Europe

Industry Recommendations Support the preparation of future WRCs (2012 and beyond) on spectrum allocation Launch technical studies / demonstrations for proof of concept and to provide solutions reducing spectrum requirements A “follow on” to SIGAT is essential to support future European positions Studies and demonstrations, as part of the EFC, on future SATCOM architectures, terrestrial end-to-end architectures, communication system integration, autonomy … Take benefit from civil – military synergies Connect with SESAR for the consideration of interoperability with future ATM systems (LDACS in particular) Prepare for the implementation of future Satcom Services Address potential new technologies to be developed for UAS