SB2009 Triage 20091203B1 SB2009 Triage Summary 20091203B N.Toge.

Slides:



Advertisements
Similar presentations
Advanced Turabian Formatting:
Advertisements

N.Toge on SB20091 SB2009 Rebaselining Proposal Document - How do we get it done? /10/2 N.Toge (KEK) for SB2009 Efforts.
PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Homework of HLRF 1 Shigeki Fukuda KEK 2012/4/23 HLRF Homework1 in KILC12 (Fukuda) 1.
Linear Collider Positron Source and Central Integration Update N. Walker, J. Clarke, E. Paterson, V Kuchler, J. A. Osbourne, T. Lackowski, A. Wolski, S.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 Status of SB2009 Rebaselining Proposal Document, Known to the Editor As of vers.A N.Toge Check:
CHAPTER 4 Engineering Communication
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Marc Ross Nick Walker Akira Yamamoto XFEL – based HLRF scheme 07 Sept 2010 BAW 1 - Backup HLRF 1.
Cost Impacts of two e- ML cycles at sqrt(s) < 250 GeV purpose: not to generate a new ILC estimate, but to facilitate SB2009 decisions Peter H. Garbincius,
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
1 Availsim DRFS and klyClus setup, assumptions, questions Tom Himel August 11, 2009.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
How do I write a proper case study analysis?. What is the Case Study Model? The Case Study Model is to prepare senior students to interpret and analyze.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson Technical Board June 23,
Accelerator Laboratory 1 CFS Review of Asian Region (S. Fukuda) June 1/ Hz Operation in DRFS HLRF System KEK S. Fukuda.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
AAP Review 横谷 LC 定例 Preparation of AAP Review General charge sets the frame Version of early November Rough structure of the meeting has been.
BAW1 RDR Confg For Mntn Rgn (S. Fukuda) 1 RDR configuration for Mountain Region S. Fukuda/KEK.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
BCD Status: Strengths and Weaknesses Tor Raubenheimer.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
1 Status of SB2009 Rebaselining Proposal Document and Preview of Feedback from PMs + Editor Draft C N.Toge.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
AD & I 15 August 2012 Marc Ross R&D for TDR Summary of TDP R&D items and baseline changes to RDR – to be included and highlighted in TDR text
Injection Energy Review D. Schulte. Introduction Will review the injection energy So could answer the following questions: Which injection energy can.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
20 July 2006 Vancouver GDE Meeting Global Design Effort 1 Ring to Main Linac Peter Tenenbaum SLAC.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
Status of RTML design in TDR configuration A.Vivoli, N. Solyak, V. Kapin Fermilab.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Harmonic.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
Undulator Based ILC positron source for TeV energy Wanming Liu Wei Gai ANL April 20, 2011.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
SB2009 Triage A1 SB2009 Triage Summary A N.Toge.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
1 Status of SB2009 Rebaselining Proposal Document and Feedback from PMs + Editor This version includes the touch ups applied during the AD/I webex meeting.
1 DR 10 Hz Repetition Rate S. Guiducci (LNF) AD&I webex, 23 June 2010.
CR1: Insert Dogleg K. Yokoya CMB mtg /9/25 CMB Yokoya1.
Americas KlyCluster Cost Analysis Overview
Integration Ideas for the Central Region Some old some new
DRFS and Low Energy 10 Hz Option
General presentation about recent status of DRFS
AD & I : BDS Lattice Design Changes
ILC Cryogenics -- Technical Design Report Planning
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Barry Barish Paris ICHEP 24-July-10
ILC - Global Design Effort
Presentation transcript:

SB2009 Triage B1 SB2009 Triage Summary B N.Toge

SB2009 Triage B2 CFS (1) Safety study materials - quote the uris for existing work reports, add a short paragraph. No separate appendix (Vic K). –Safety table summary - Find out what we can do more... also, spell checking necessary! (Vic K + NKT)  Touch-up Semi done as of A (need URIs, however) Tunnel diameters to quote for the systems other than MLs (to go with the figs) - Look like some entries for EU and AS have to remain blank, since no quotable work exists for the central region: Explain that that is the situation and that they will be addressed during TDP2.  done Installation aspect - no presentable work being done. Responsible group not in existence. Just state that we will address this in TDP2. (Need concurrence by PMs)  Text touch-up done 3D stuff - Shall we say, in a more visible way, that the work is in progress?  Text touch-up done

SB2009 Triage B3 CF/S (2) Have to say a few words about the necessity of the regional variations and how we'd maintain them during TDP2, in a "to do in TDP2" section.  Text touch-up done ML length issue remains is dealt with in exact the same way as RDR (such as blank tunnel space for energy reserve ML HW which is not going to be initially installed), except  NKT to chew on MCR, fix Layout, quote Layout from CFS – additional length for undulator energy loss –additional length for QWT energy loss –additional length for bunch timing matching (416m which was missing in RDR). PMs to create lines to this effect, we quote this same text in the Layout and CFS sections. Missing URI for ref to quote on the heat load  done

SB2009 Triage B4 Electron System No discussion –NKT/MCR to chew on AB on some remaining details

SB2009 Triage B5 Positron System Quote the ref for Kubo's work (presented at Alburquerque) on the ML operability issue of alternate pulsing at low Ecm operation (Jim C). Mention that propagation of the beam emittance thru the undulator (besides energy spread) is a continued topic into TDP2 (Jim C). Reconcile the BDS Beamlie figure and Posi Conceptual Diagram  Deepa, JimC, Toge, ++ - Somehow import the animation (or sth equivalent) of the alternate pulsing,Also import the highlighted diagram for the aux source.  NKT

SB2009 Triage B6 DRs The fundamental conclusions for this section should be stressed, either in the beginning or at the end, i.e. – we think we are ok with the low-P with this ring. –we shall see how it goes with high-P (except more results next year) "Hanging" illustrations at the end of the manuscript have to be integrated within the text. Add a short text elaborating a bit on the kicker business (beam orbit stability req / feedback implementation / R&D) All pending, to be done by the authors.

SB2009 Triage B7 RTML Done

SB2009 Triage B8 ML a paragraph or two explaining for each of the following – –the 1.6ms pulse for low current option –the strategies for dealing with cavity performance variation. –the low energy operation where some portion of the ML would operate in zero-gradient or negative- gradient mode. –  CA to draft; MCR and NKT will figure out how to use this text in Overview / ML and apply the mods.

SB2009 Triage B9 KCS KCS shall present its implementation proposal with the bouncer modulators, and RDR-style power distribution WG systems; –The KCS section, the availability and CFS are presented with these assumptions. –However, Marx and tunable WGs shall be mentioned as good possibilities –to pursue into TDP2.  Text fix to be applied by CN. Insert a few lines concerning the implementation plans for the control electronics in the ML tunnels.  CN. Give more discussion on LLRF. We are dealing with more aggravated issues related to signal latencies, bandwidth. Present a bit more specifics of the current thoughts on technical solution if not a complete design proposal.  CN, CA

SB2009 Triage B10 DRFS Add more remark on the adequacy of the klys lifetime while this thing is dealing with a fairly big average power, if not the peak power. Sorting scheme and higher power klystron in case of dealing with high-grad cavs  Fukuda san!

SB2009 Triage B11 BDS Label the "matching section" in Fig (Deepa). Clean up the text to go with that Fig (NKT).  Done, as of A In consideration of the low Ecm operation with alternate ML pulsing, introduce one more beamline on the electron side to deal with high/low energy beams to do doglegs downstream of the undulator.  do this with word, not with fig. (Partial) response from the GDE Physics Question Comm: --> tomorrow, following the report by BF, who indicates everything the "stability“ issue are reasonably answerable. Expect circulation of his preview later today/tonight.  Shall we forget this? Part of the BDS line has to accommodate three / four beamlines. Extract corresponding tunnel cross-section views from CF/S drawing set and stick it into the Layout section (NKT). BDS will ref to it.  JMP (text!!!) + NKT (illustration) /MCR PMs have to determine how much spotlight we would give on the travelling forusing.

SB2009 Triage B12 Cost Complete the manuscript  PHG Implement part of the Cost summary in the Overview  PMs

SB2009 Triage B13 Layout 2D cross sections of the central region  NKT  JMP Clarification of the ML length issues  PMs / NKT  JMP Comparison of RDR cartoon and SB2009 cartoon … make sure we clean it up with “correct” numbers.  Overview (do not use yellow!!!)

SB2009 Triage B14 Still in ICU Intro / Overview Layout SRF gradient Availability Risk Analysis It would be highly helpful if a reasonably editable version of these sections become available by 7AM, Monday, 2009/12/7 JST.

SB2009 Triage B15 Finally, for All Let us make sure that we clearly say the “pros / motivations” for the changes, besides “cons / issues” in the beginning of each section. We should not be over- selling, yet we do not have to be shy  All Individual Section Authors. PMs, NKT

SB2009 Triage B16 From now on One more webex, next week, likely 2009/12/9? Drop-dead date: Friday, 2009/12/18