Economic Estimation Models Engineering Economics Lecture 19 19 January 2010.

Slides:



Advertisements
Similar presentations
Cash Flow Estimation Models Estimating Relationships and Problems.
Advertisements

Chapter 3: Cost Estimation Techniques
Design of Experiments Lecture I
Example 2.2 Estimating the Relationship between Price and Demand.
System Engineering & Economy Analysis Lecturer Maha Muhaisen College of Applied Engineering& Urban Planning.
Process Control: Designing Process and Control Systems for Dynamic Performance Chapter 6. Empirical Model Identification Copyright © Thomas Marlin 2013.
CHAPTER 7 Cost Estimation.
Arda ÇELİK DEÜ Endüstri Mühendisliği ABSTRACT Cost analysis can play strategic roles in organizations and plans. As industrial engineers,
Energy, Society, and the Environment Unit 3 Energy Economics.
Topic 2: Statistical Concepts and Market Returns
Development of Empirical Models From Process Data
Why forecasting? Understanding future possibilities. Understanding the possible changes in business conditions. Learning how to cope with the possible.
CHAPTER 1 INTRODUCTION TO ENGINEERING ECONOMY WHAT IS ECONOMICS ? The study of: –How to allocate resources effficiently to satisfy unlimited human wants.
Learning Curve Analysis
An Approach to Case Analysis
1 Engineering Economic Decisions Lecture No.1 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Session 5: Demand forecasting
Business Forecasting Chapter 5 Forecasting with Smoothing Techniques.
Slides 13b: Time-Series Models; Measuring Forecast Error
Conceptual Cost Estimating
FOOD ENGINEERING DESIGN AND ECONOMICS
Construction Cost Estimating Class #2: Concept Estimating Prof. Ralph V. Locurcio, PE.
Learning Curve Analysis. Learning Objective After this class the students should be able to: Calculate the hours required to produce determinate product.
CHAPTER 1 INTRODUCTION TO ENGINEERING ECONOMY $$
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
1 ECGD3110 Systems Engineering & Economy Lecture 3 Cost Estimation.
MIE Class #13 Manufacturing & Engineering Economics Term Project Term Project – Next week guest lecture Concerns and Questions Concerns and Questions.
Scientific Inquiry & Skills
NEW VISION OF ENGINEERING ECONOMY COURSE (VISION) MODULE 3 LECTURE 1-2 Cairo, 13 July 2005.
Engineering Economy Chapter 1: Introduction to Engineering Economy.
Ch 61 IT-390Preliminary and Detail Methods. 2 Design and Evaluation ä Preliminary Estimate requested during the initial evaluation for several reasons:
1. 2 Traditional Income Statement LO1: Prepare a contribution margin income statement.
FOOD ENGINEERING DESIGN AND ECONOMICS
Learning Curves Dr. Everette S. Gardner, Jr.. Learning Curves2 Learning curve concepts Predicts reduction in manufacturing costs or direct labor hours.
Capital Budgeting.
Chapter 10: Confidence Intervals
Applied Quantitative Analysis and Practices LECTURE#25 By Dr. Osman Sadiq Paracha.
Welcome to MM305 Unit 5 Seminar Prof Greg Forecasting.
UNIT - 3 DEMAND FORECASTING. MEANING Demand forecasting refers to an estimation of most likely future demand for a product under given conditions.
Machine Learning 5. Parametric Methods.
1/26/2016rdcw2a-1 Engineering Economic Analysis Chapter 2  Engineering Costs and Cost Estimating.
Forecasting Demand. Problems with Forecasts Forecasts are Usually Wrong. Every Forecast Should Include an Estimate of Error. Forecasts are More Accurate.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Uncertainty & Variability Charles Yoe, Ph.D.
Costs and Cash Flows Estimation. Engineering Economic Analysis - Seven Steps 1. Recognition and formulation of the problem. 2. Development of the feasible.
PROCESS DESIGN DEVELOPMENT
F5 Performance Management. 2 Section C: Budgeting Designed to give you knowledge and application of: C1. Objectives C2. Budgetary systems C3. Types of.
Prepared by Diane Tanner University of North Florida ACG Cost Estimation 4-1.
Welcome to MM305 Unit 5 Seminar Dr. Bob Forecasting.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Chapter 3: Cost Estimation Techniques
Determining How Costs Behave
Chapter 1: Introduction to Engineering Economy
Chapter 3: Cost Estimation Techniques
UNIT-III Operations Management PREPARED BY CH. AVINASH.
Costing and Project Evaluation
Determining How Costs Behave
(Additional materials)
Chapter 1: Introduction to Engineering Economy
THE FEASIBILTY STUDY LECTURE-5.
INTRODUCTION TO ENGINEERING ECONOMY
ENGINEERING ECONOMIC DECISION CHAPTER 1
Chapter 3: Cost Estimation Techniques
Chapter 3: Cost Estimation Techniques
Chapter 3 COST ESTIMATION TECHNIQUES
Costing and Finance P R Upadhyay.
Chapter 1: Introduction to Engineering Economy
CHPE308 Engineering Economy Estimation Of Capital Cost
Chapter 3: Cost Estimation Techniques
Presentation transcript:

Economic Estimation Models Engineering Economics Lecture January 2010

Estimation To calculate approximately A tentative evaluation or rough calculation A judgment based on one's impressions; an opinion

Difference between estimation and forecasting Estimation require calculation, forecasting may or may not require calculation Estimation require calculation, forecasting may or may not require calculation Forecasting always deals with future, estimation can be for future or past Forecasting always deals with future, estimation can be for future or past Forecasting require extensive data, estimation require accurate assumptions and valid approximations Forecasting require extensive data, estimation require accurate assumptions and valid approximations Estimation is approximation, forecasting is projection into future Estimation is approximation, forecasting is projection into future

Why estimation fail You are not a good estimator You are biased You are ignorant You are fixated and rigid You are to calculative You are sick You are over pushy - don’t try to hit the bull

Why estimation succeed Calm and balance Unbiased Know the facts and figures High morale Healthy Don’t aim high

Engineering Economic Analysis Seven Steps 1. Recognition and formulation of the problem. 2. Development of the feasible alternatives. 3. Selection of a criteria for determining best alternative. 4. Analysis and comparison of the alternatives. 5. Selection of the preferred alternative. 6. Implementation of the preferred alternative. 7. Performance monitoring and post-evaluation.

Developing Estimation – why necessary Because engineering economy studies deal with outcomes that extend into the future, estimating for feasible alternatives is a critical step in the analysis procedure.

Estimating Techniques Indexes Unit Technique Factor Technique Power-Sizing Technique Learning Curve

Indexes An index is a dimensionless number that indicates how a cost or a price has changed with time with respect to the base year. C n = cost or selling price of an item in year n C k = cost or price of the item at an earlier point in time (say year k ) I n = index value in year n I k = index value in year k C n = C k (I n /I k )

Example 1 Company XYZ installed an exchange in 1989 for $350,000 when the index had value of 312. This same company must install another exchange of the same size in The index in 1996 is 468. what will be the cost in 1996? C n = cost of an item in year n = ? C k = cost of item at an earlier point in time (year k ) = $ 350,000 I n = index value in year n = 468 I k = index value in year k = 312 C n = C k (I n /I k ) Approximate cost of new boiler = C 1996 = $350,000 (468/312) = $525,000

Unit Technique Involves a “per unit factor” that can be estimated effectively. Examples: – Operating cost per day – Construction cost per square foot – Maintenance cost per hour

Example 2 We need a preliminary estimate of the cost of a particular IT laboratory. Use the factor of, say, $550 per IT equipment kit and assume that the laboratory require approximately 2,000 kits. What will be the estimated cost? Estimated cost = $550 x 2,000 = $1100,000

Factor Technique The factor technique is an extension of the unit technique We need a refined estimate of the cost of the house. Assume that the house is approximately 2,000 square feet of living space, has one porch and two garages. Use the factor of, say, $50 per square foot of living space, $5,000 per porch and $8,000 per garage. Estimated cost of the house = $50 x 2,000 + $5,000 + ($8,000 x 2)= $121,000

Power-Sizing Technique Also sometimes referred to as the exponential model Often used to cost industrial plants and equipment C A = cost for plant A C B = cost for plant B S A = size of plant A S B = size of plant B X = cost-capacity factor C A /C B = (S A /S B ) X C A = C B (S A /S B ) X

Example 4 Make a preliminary estimate of the cost of a 600 MW power plant. It is known that a 200 MW plant cost $100 million 20 years ago when the appropriate cost index was 400. That cost index is now 1,200. The power-sizing factor is Today’s estimated cost of a 200-MW plant = –$100 million x (1,200/400) = $300 million Today’s estimated cost of a 600-MW plant = –$300 million x (600/200) 0.79 = $714 million

Mathematics of the Learning Curve u = the output of desired number Z u = the number of input resources for output number u K = the number of input resources for the first output unit s = the learning curve slope parameter Z u = K u n where n = log s / log 2

Example 5 A student team is designing a telecom systems for national competition. The time required for the team to assemble the first system is 100 hours. Their learning rate is 0.8. The time it will take to assemble the 10th car = ? Z u = K u n where n = log s / log 2 Z 10 = 100 (10) log 0.8/log2 = 100 (10) = 100 / = 47.6 hours

Example 6 A rare product is made in batches of 50 units. Within a batch, each unit take less and less time to be produced because of a learning process of 75%. The time needed to assemble the first unit = hrs The time needed to assemble additional units is Z u = ( u ) log 0.75/log2 = ( u ) The total time taken for all 50 units = Z 1 + Z 2 + Z Z 50 = hours

Compensatory Quiz