F D. Finley / Fermilab FARDOG / January 4, 2001 1 FARDOG 04JAN01 Discussion of FY01 Budget and Goals for RF Structures.

Slides:



Advertisements
Similar presentations
F October 4, 2001David Finley to FARDOG at FermilabSlide 1 Status of X-Band Structures Fabrication Our First X-Band Structure Progress of RF Factory at.
Advertisements

NLC - The Next Linear Collider Paul Czarapata Engineering Test Facility What is it and what does it do?
COOLING TUBE ACCELERATING STRUCTURE MANIFOLD COUPLER VACUUM INTERFACE FLANGE RF INTERFACE FLANGE TUNING STUD ENGINEERING DESIGN AND FABRICATION OF X-BAND.
Magnetic fields R&D update B. PlasternEDM November 2007 Collaboration Meeting Results from prototype studies of a 1/6-scale B 0 coil with Results from.
MuCool Outlook and Plans  Over the past year we have had a very successful program that will be detailed in the next two sessions: u MuCool Test Area.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Status of KEK production July 11, 2008 at SLAC KEK T. Higo et al., Accelerator div. T. Takatomi et al., Mech. Eng. Center.
CLIC RF structure master schedule and CERN production
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
September 9, 2002David Rubin/ Cornell 1 UCLC Briefing UCLC Briefing to the US LC SG Accelerator Review Committee September 9, 2002 David Rubin Cornell.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
April 22, 2002David Finley to TD HQ Slide 1 RF Technology Development Group Mission The mission of the.
May 9, 2002David Finley to NLC Fermilab Slide 1 Linear Collider R&D at Fermilab David Finley NLC MAC.
Status of X-band program at RadiaBeam
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
David Finley / LArTPC Group Meeting / June 13, Fermilab Slide 1 LArTPC Detector Costs Context History Next (perhaps) steps.
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
U.S. MICE Schedule, Cost, & Risks Peter H. Garbincius Mark Palmer, Alan Bross, Rich Krull Fermilab Presented at RAL – November 13, 2013.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
October 25, 2001David Finley to NLC SLACSlide 1 Status of X-Band Structure Fabrication at Fermilab Our First X-Band Structure Progress of RF Factory.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Low Emittance RF Gun Developments for PAL-XFEL
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
R&D, Collaborations and Closeout Fulvia Pilat MEIC Collaboration Meeting March
CLIC RF structure development meeting Structure cost study (introduction) G. Riddone,
January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal Shekhar Mishra (Hasan Padamsee, John Mammosser, Mike Kelly) For the WBS 9 Collaboration.
LIGO-G M Organization and Budget Gary Sanders NSF Operations Review Caltech, February 26, 2001.
1.3GHz Input Coupler for ILC
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Cavity Tuning Machines Project Update Ruben Carcagno January 11, 2010.
1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
SLAC NLC & ILC Cost Modeling Ray Larsen January 28, 2006.
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
5 th CLIC-ACE Structure production in laboratories and industries G. Riddone, 02/02/2010 (contribution from KEK/SLAC colleagues) 1.
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Tsinghua Collaboration Plan Jiaru Shi, CERN On behalf of Huaibi Chen, Tsinghua University, Beijing November Collaboration Meeting, CERN.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
Title 2 nd X-band Accelerator Structure Design and Test-Program Collaboration Meeting Discussion with WebEx on March 17 between CERN and KEK W. Wuensch,
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
GOLD- ELECTROPLATING COOLING FITTING ADAPTER ACCELERATING STRUCTURE CONCEPTUAL DESIGN OF X-BAND ACCELERATING STRUCTURE TD26 CC SIC Abstract Many accelerating.
HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,
LCWS11 WG4 Fully featured accelerating structure engineering design
Resource Loaded Schedule and Budget Profile
ILC R&D Board Meeting: SRF Cavities Status and Plans
The situation is far better than I had thought.
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
LARP Rotatable Collimators for LHC Phase II Collimation
Advanced Research Electron Accelerator Laboratory
EIC Collaborations EIC Collaboration Workshop, JLAB Oct 28-Nov 1st
Presentation transcript:

f D. Finley / Fermilab FARDOG / January 4, FARDOG 04JAN01 Discussion of FY01 Budget and Goals for RF Structures

f D. Finley / Fermilab FARDOG / January 4, FY01 LC R&D Goals / Technical Division RF Structure Factory Make first Fermilab Xband structure By about mid-March01 or so (we hope) (See below also) Occupy IB4 SW Corner Finish RF QC Lab Need expertise from BD and TD Using expertise from INR Collaboration (see later slide) Now have BD Network Analyzer from BD (Thanks, John) Need a second NA bySEP01 (Peter?) Get first furnace operating Full Size Furnace by SEP01 (we hope) Baby Furnace (~120K$) by APR01 Magnets Finish four prototypes Measure with mostly existing equipment Take over some motion control development Understand beam alignment requirements Collaboration High Gradient Tests Have made, now send, 20 disks to SLAC First, we do RF QA on them SLAC provides couplers etc and assembles into a complete structure “Same as” SLAC / Robertson model Make two entire “20 cell” structures aka “1st Fermilab Xband structures” To get on SLAC “High Power Testing” List, need to “Show me the structure!” IB5 CDR w/ FESS $25K from RAT, $25K from TD Assembly Line for beam line units Not necessarily “NLC Project” building … could instead be for additional space needed for ongoing TD activities

f D. Finley / Fermilab FARDOG / January 4, Industrial Building 4 (IB4) Notes: 1. Southwest Corner is lower right of picture 2. RF structure work - Uses all of SW corner (2 clean rooms, rf lab, work area, furnace area) - Shares QC Laboratory for mechanical QC - Shares Machine Shop 3. This is not an optimum arrangement for the work flow for making structures 4. “Beam Line Unit” Assembly area would occupy most (if not all) of IB4

f D. Finley / Fermilab FARDOG / January 4, IB4 SW Corner Note: Furnace area is large enough for baby furnace … full size furnace is mounted over Clean Room B (the one on the left) Copper parts go in … structures come out

f D. Finley / Fermilab FARDOG / January 4, INR Collaboration (Troitsk, Russia) Reference: Finley to Yarba 12/20/00 “INR and TD” Item 1: In support of the RF QC Lab Gennady Romanov (TD Guest) coordinating the setting up of the RF QC Lab with Ding Sun (BD), Tug Arkan, Brian Smith, Evgueni Borissov(TD) What is to be done in IB4? Short stack and full length structure measurements plunger and bead pull techniques FY01 New Guests Gonin: rf calculations to help understand measurements Khabibulin: improve throughput (aka automation) 3rd person: Brazing Small piece of hardware from INR Item 2: In support of understanding structure vacuum To be done at INR Develop realistic and useful computer codes Start with 1.8 meter RDDS as specific example at appropriate level of detail Example: Model the time development of the vacuum after a discharge and outgassing How fast does the gas move? Which direction? How long does it take to pump down so that processing can continue?

f D. Finley / Fermilab FARDOG / January 4, FY01 LC R&D Goals for TD / Background Budget $1.3M Top Down (see slide from LaDaune T.) Magnets (MAT) $195K Salaries, $70K M&S RF Structures (RAT) $540K Salaries, $495K M&S Sum $735K Salaries, $565K M&S Caution: November 2000 obligations already close to linear budget for FY01 … Develop funding “understandings” ~100K$ TD Equipment for Baby Furnace “Small%” FTEs not charged to LC R&D? Have made no changes in TD reporting yet, small changes might be needed. ~$75K TD Equipment for 2nd Network Analyzer ~$600K Full Size Furnace - NIU funds Update multi-year plan Integrate into SLAC tests Make Structures so that SLAC can do High Gradient tests on them Integrate into ETF Will force 1 structure / month issue Will force “beam line unit” issues into the open Integrate into Industry Need to determine appropriate strategy for scaling up industrialization issues Need to determine sensible role for SBIRs Note on throughput: R&D needs about 1 structure / month Project production rate is ~ 6 structures / day

f D. Finley / Fermilab FARDOG / January 4, TD NLC R&D Budget Report November 2000

f D. Finley / Fermilab FARDOG / January 4, FY01 TD LC R&D FTEs and Salaries Plan on FY01 Salaries = $735K Plan to add ~ 0.3 FTE / month through August 2001 Have 8.72 FTE at FY01 End Start with 5.42 FTE at FY00 End

f D. Finley / Fermilab FARDOG / January 4, Preliminary FY01 TD LC R&D Projection Note: Oct Nov are history

f D. Finley / Fermilab FARDOG / January 4, FY01 LC R&D … Waiting in the Wings Windowtron R&D $100K M&S estimate “Windowtron” = single cell (or less) rf breakdown studies led by SLAC Grew out of breakdown workshop Miss opportunity for more global involvement (CERN, Cornell, Fermilab) Moderately Damped Design … at least not under TD leadership ~ 0.5 FTE Beam Line Unit Design Unit = “rf structures and a magnet” on a support girder Unit is “repeated” throughout linac Need final structure design (Q: “Are there three or four per unit?) “Generic design” for support girder is not appropriate ~1 FTE Parametric Study on Bonding $75K to $150K M&S estimate initiated in FY00 when RDDS structure design was thought to be final...but is actually premature at this time “Parametric Study” = systematically map out costs of producing disks vs required performance of bond joints but will need to be done to determine a defensible cost estimate of the full linac … once a structure design has been determined settle the issue of brazing vs. bonding Equipment, equipment, equipment... optical measurements (>~ $200K) laser interferometer for magnet measurements (~$150K)