17 November 2010 1 INTEROPERABILITY & Cross Acceptance Paul Maas Inspector.

Slides:



Advertisements
Similar presentations
SS6CG5b European Union.
Advertisements

IRSC October Denver, USA 1 Europe: an open space for rolling stock?
Intermodality in the area of Záhony Judit Thomka Regional Development Holding Ltd. Usti Nad Labem 17th April 2009.
Michael contribution to national and European strategies EVA Florence - 18 April 2008 MINERVA and MICHAEL fostering access to digital cultural and scientific.
Experience of a GIG - 17/11/2010 Experience of a GIG: Mutual recognition in practice.
Cross-Acceptance: UNIFE expectations Alice Polo Safety and Certification Manager.
EIMS EXPECTATIONS FROM CROSS-ACCEPTANCE WORK CROSS-ACCEPTANCE SEMINAR 17 NOV PHILIPPE GALLEY-EIM/RFF.
INDEPENDENT WATER SCHEMES IN SAMOA
17 November 2005Industry Meeting1 Fees & Charges Regulation Ralf Erckmann Certification Manager.
ADQ – An ANSP/AISP Perspective
The European Organisation for the Safety of Air Navigation Implementing DQR - A Practical View DAL/DQR Workshop Brussels, February 2013 Presented.
Michael in Europe London - 23 May 2008 « MICHAEL: Perspectives on cultural sector resource discovery »
The outlook of the insurance provider B NELVA-PASQUAL – June 2010.
Railway accessibility for people with reduced mobility Incoming works for the European Railway Agency Gilles Gardiol UNECE.
Knowledge requirements for rolling stock maintenance TU Eindhoven – 19th of June 2007 by Bob Huisman NedTrain - Fleet Management.
OTM TASK FORCE EFRTC General Meeting Sofia, Markus Hofmann, EFRTC OTM Task Force Chairman Franz Messerli, UNIFE OTM Task Force Vice-Chairman.
BAU 2011 Europe’s building industry after the crisis – What now? Erich Gluch ifo Institute for Economic Research, Munich BAU Information Talks on 28 October.
REDITER project Five national seminars Overall approach 20th December th December 2010.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
European Union Introduction to the EU.
Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST.
Reference Document Management 1 European Railway Agency (ERA) Cross-Acceptance Unit P. Mihm 17/11/2010.
The Future – the “Roadmap” SIMPLIFICATION. The Road Map 2 TSI in Place Hi Speed Conv Loc & pass Off TENS TSI Conformity New Vehicles Networks Open pointsUpdates.
1 8 July 2010 Cross – Acceptance and Safety Ralf Schweinsberg Vice-President Eisenbahn-Bundesamt UNECE Group of Experts on Unified Railway Law Secon Session;
Vancouver, October 08th 2013 DB Systemtechnik GmbH Marc Geisler The challenge of transforming a rule-based system into a risk-based culture on an example.
WELCOME EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli.
EP Transport Committee Fourth Railway Package - public hearing Brussels, 7 May 2013 Better governance of the railways – a freight perspective Tony Berkeley.
The European Railway Agency in development
ISARE : Health indicators in the regions of Europe André Ochoa for Isare team ISARE : Health indicators in the regions of Europe André Ochoa for Isare.
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
A litigious incumbent and a cautious regulator and other reasons why R&E networking is expensive in some countries Marko Bonač ARNES, Slovenia
EFRTC and Czech Technology platform “Interoperability of railway infrastructure” Imrich Korpanec EFRTC Secretary General.
BEWAG (UIP) General assembly European Railway Agency Jean-Marie DECHAMPS, Head of Sector (Safety) Brussels, 27 April 2015.
N° 1 The European railway Agency: an engine for the integrated railway area EFRTC, Vilamoura on June 24 TH 2005 Olivier PIRON 24 June 2005.
Lille, 17th November 2010 Ernest GODWARD The Report on Vehicle Authorisation - Costs and Complexities.
1 December 2010 NSA Belgium. 1 December 2010NSA Belgium - Michel Lambermont Constructing, modifying and changing the assignment of wagons.
UIC ERTMS World Conference Certification and Assessment of GSM-R Begoña DOMINGO, GSM-R Project Officer Istanbul, 3/04/2014.
The European Union. The European Union is a group of countries around Europe which have joined together to form political and economic agreements There.
1 Harmonisation within a merger of two spot power exchanges - Experiences by EEX and Powernext APEX CONFERENCE 2008 IN SYDNEY | 13 October 2008 Dr. Wolfgang.
European Railway Safety Strategy EIM Safety Group (PhGALLEY and J-Å HALLDEN) 29 september 2009.
Recommendation 2014/897/EC (DV29bis) Key Principles.
Liberalisation of the railway market A challenge to finance railway systems Benoit Chevalier Deputy Director for Rail Safety and Regulation French Ministry.
RE-E / IRSC / 27/09/ /10/09 1 The necessary evolution of railway safety regulations in Europe A challenge – Risks to be controlled.
Safety, Interoperability, Passenger Rights and Rail Regulation Page Facing the Challenge: Cleaning up the National Vehicle Rules.
1 Standardisation, Assessment, and Certification Legal Framework, Standards  Measurement Instrument Directive (2004/22/EC)  Interoperability Directive.
Bruxelles, 29/30 th January, 2014 Report on TSI OPE revision RISC 69 th.
General Meeting Florence Secretary General report on Items 5 of the agenda Imrich KORPANEC.
General Meeting Zurich Markus HOFMANN Chairman of OTM Task Force On Track Machine (OTM) autorisation and x-acceptance.
109 July 2009CER The Voice of European Railways Cross Acceptance CER Expectations ERA Seminar, Lille, Libor Lochman.
Workshop accreditation and recognition / conformity assessment Removing Technical Barriers - TSIs within New Approach and Safety Directive Dr.-Ing. Andreas.
UIC ERTMS CONFERENCE 2006 – BUDAPEST 5 th April 2006 Operational Interoperability through ERTMS.
Copyright © AEbt 2016 All Rights Reserved. AEbt Angewandte Eisenbahntechnik AEbt Angewandte Eisenbahntechnik (AEbt Applied Railway Technology) Further.
TRANSPORT SCIENCE: INNOVATIVE BUSINESS SOLUTIONS
Europe: an open space for rolling stock?
European Rail Infrastructure Managers
NAB/RB Training Workshop In Valenciennes, April 2016
EFRTC GENERAL MEETING Ny Tiana TOURNIER
4th Railway Package – Implementation of the Technical Pillar
Session II: System authority for ERTMS 4RP Trackside approval
PROPOSALS ON ETCS COMPATIBILITY TESTING & RE-AUTHORIZATION
Network/route compatibility
EUPAN/TUNED social dialogue meeting , Stockholm
Regional Accounts
European Railway Agency
Cross Acceptance State of play Jan 2014 RISC.
Regional Accounts ESA 95 Data Collection
Collecting methodological information on regional statistics
Fourth Railway Package Technical Pillar Hearing at the European Parliament, Brussels 7 May 2013 José GORTAZAR Chief Technical Officer, CAF.
Quality project regional GVA and employment
4RP – authorization of wagons
Presentation transcript:

17 November INTEROPERABILITY & Cross Acceptance Paul Maas Inspector

Interoperability Goals ( high level ): easier authorisation process : less national rules (and clearer) less time consuming (and clearer) less costs (single test when possible) more predictable delivery of PITS and keeping the same safety-level (at least)

Interoperability GOALS (lower level): Harmonisation of rules (Ministries and NSA) Harmonisation of rules and hardware (IM) Transparent rules (no changes/derogations) Sharing the workload is possible (for NSAs and NoBo/DeBos) Testing as much as possible in test centre/simulation

Cross Acceptance HISTORY Basis for CA starts in project at end 90s but without legal basis Task Force Interoperability (TFI: NSAs of DACHINL) founder of complete system in 2007 with legal basis by MoU on 07 June 2007 (Luxembourg) In 2006 bilateral agreement Germany – France for HS passenger trains based on the same principals 2008 ERA and NSA decide for CA in Europe 2009 EC decides for ERA task in CA

Cross Acceptance Today's situation: DACHINL MoU D – F agreement 2006 and update 2008, renewal 2010? BeNeFLuCh MoU on French agreements with Spain, Italy and Portugal Luxemburg and Belgium project with Germany (running) GIG with mid-south Europe GIG with the Nordic and Germany The Netherlands project with Check Republic (almost ready and now incorporating Germany) The Netherlands project with Poland (starting up and extending with ERA to NePoCSkALiG means they dont waite )

TSIs and ERA -Cross Acceptance needed as intermediate for TSIs and for existing rolling stock (in the next decades) -TSIs not complete (still: open points, interpretable!, no clear definitions, derogation possible) When we dont close this system soon and keep it closed it will be worse (in 5 or 10 years) then today's situation! (duty for ERA, NOBOs, Manufacturer, RO and NSAs)

TSIs and ERA - ERA plans and pace doesnt fit most NSAs/IMs so -planning must be agreed -Ministries have to realise that what is agreed they can handle in the ministry and at level of NSA/IM (personnel (number and knowledge) and for the cost) -Decision making in ERA not (always) clear or transparant

Infrastucture Manager What is effectively done by them in the last years to improve the Interoperability??? Did they clean up the rules? Did they make all the rules transparent? Did they harmonise anything? Is there a converge in hardware? Exception: some IMs because of ERTMS corridor!

Manufacturers The (bigger) manufacturers started to use Cross Acceptance where possible (with good help of IRL-database) In every new RS-project better and more! The manufacturers are (often) too optimistic in their planning (problems seem to arise at end of process, with the pressure on…) For the TSI CCS EVERY ERTMS-manufacturer built there own simulation centre of a specific track! ( x10 6 ) Improvement: bring costs down heavily by organising that simulations (also remote) can be used on each others simulation- and test centres! Next projects: - help yourself and NSAs to make clear what is or is not covered by TSIs and – make the translation in English

Railway Undertaking RUs have already profited from Cross Acceptance and will even more in next future RUs have to realise that TSIs have to be fulfilled: NO MORE interpretations and DEROGATIONS! (from 2day on!!) RU together with Manufacturer responsible for realistic project planning

NSAs Some NSAs have invested heavily in Cross Acceptance Some have done (almost next to) nothing Some NSAs/Ministries even make more and new rules! Some NSAs mostly unpredictable planning (depending on responsible employee; changes in staff, new questions, other questions, etc) In some countries NSA-personnel self- responsible!

NSAs Some ministries accept unknown UNSAFETY! by directly accepting authorised RS from an other country (IM does infracompatibility check without involvement NSA) More NSAs have so little budget that it isnt possible anymore to act properly (task ministry?) In the next 2-5 years (probably) all NSA have to face a big staff cut down (20 to 40%)

NSAs and Ministeries No Harmonisation yet for: Process for technical checking (NOBO/DEBO or NSA) Process for application Cost for PITS (from 250,- up to > , - for same RS-type!)

All Parties Whe have done a lot of work, but There is still a lot to do! For EVERYBODY!!

All Parties Questions? When done: thank you for your attention!