ASPERA-3 July 31, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_31/ Page 1 Monthly Status Report Report due 7/25/01 Schedule statused.

Slides:



Advertisements
Similar presentations
NAVAL REACTORS PROGRAM TMDE Status
Advertisements

0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
Laser Shoot-Out Game By Steven Noto and Laura Miller Advisor: Steven Gutschlag April 4, 2000 Senior Project Status Report 2.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
Harris JTRS Project The A-Team Garrett Wampole Ben Litchfield Jason Offord Jason Gillman David Bryant.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Development plan and quality plan for your Project
Natasha Benko, Kevin Jacobsen, Marcus LaRose, Scott Timme October 14, 2009 Our design will automatically calibrate your speedometer according to tire size.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Software Engineering Tutorial. Tutorial objectives  Direct application for the SW engineering activities.  Discuss real software development case studies.
Software Development Life Cycle Decisions Project Management Disciplines Stacey Shearn September 8, 2005.
Functionally Navigating/Balancing Patches and Fixes Session 1023 March 20, 2001 Presented by Melissa Grimsley, David Kline & Jane North.
Server Virtualization: Navy Network Operations Centers
1 NASA CUSTOMER NUMBER: PROJECT TASK: QUARTERLY TECHNICAL PROGRESS REVIEW TASK TITLE:Embedded Passives Characterization QUARTER:2.
Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.
From Research Prototype to Production
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
ASPERA-3 July 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_25/ Page 1 Monthly Status Report Report due 7/25/00 Schedule statused.
GLAST Large Area Telescope:
PowerSource NWOCA User Conference 11/02/2012. PowerSource: A Pearson website that provides resources for.
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
Sprint 112 Review / Sprint 113 Planning July 29 th, 2013.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Mixed-Signal Option for the Teradyne Integra J750 Test System May08-12 Emily Evers Vincent Tai.
ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 1 Monthly Status Report Report due 1/25/01 Schedule statused.
ASPERA-3 June 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 6_25/ Page 1 Monthly Status Report Report due 6/25/00 Schedule statused.
COMP 121 Week 1: Testing and Debugging. Testing Program testing can be used to show the presence of bugs, but never to show their absence! ~ Edsger Dijkstra.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
CS 111 – Dec. 3 Lab recap Problem solving approach for systems analysts –8 phases –Just understand the flow/process/sequence of the steps, not specifically.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
Presenter Date Page Project manager The PROGRAM The Company Name 03/21/01 STOPLIGHT METRICS Stoplight Charts provide a means of communicating the status.
ASPERA-3 June 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 6_25/ Page 1 Monthly Status Report Report due 6/25/01 Schedule statused.
Presented by D’Sunte Wilson Microsoft Dynamics Nav (Navision) Training – Day 2.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
SSC SI Data Processing Pipeline Plans Tom Stephens USRA Information Systems Development Manager SSSC Meeting – Sept 29, 2009.
T Project Review Sotanorsu I3 Iteration
ASPERA-3 May 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 5_25/ Page 1 Monthly Status Report Report due 5/25/01 Schedule statused as.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
ASPERA-3 Mar. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/01 Schedule statused.
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 1 Monthly Status Report Report due 2/25/01 Schedule statused.
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Development Report Engineering Node August 2006
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Thomas Kern | The system documentation as binding agent for and in between internal and external customers April 24th, 2009 | Page 1 The system documentation.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
1 PDS MC Requirements Process March 29, 2007 (v2).
ESSRT Status Report as of July 31, 2013
PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.
Status Reports: Messenger and Dawn S. Joy. MESSENGER It has been previously reported that the MESSENGER project did not plan on archiving any data EXCEPT.
DAA PEACE Status A. Fazakerley, B. Mihaljčić, I. Rozum, A. Lahiff, G. Watson, D. Kataria UCL Department of Space and Climate Physics Mullard Space Science.
EMCS Facility Status Thomas Niedermaier. This document is the property of Astrium. It shall not be communicated to third parties without prior written.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
Component D: Activity D.3: Surveys Department EU Twinning Project.
CyVerse Workshop Discovery Environment Overview. Welcome to the Discovery Environment A Simple Interface to Hundreds of Bioinformatics Apps, Powerful.
SWEA sensor FM model work remaining before delivery
Bill Raynor Naval Research Lab
Chapter 1 (pages 4-9); Overview of SDLC
STOPLIGHT METRICS.
HMA Follow-on Kickoff Meeting
LCLS Undulator System Status and Schedule
LCLS Undulator System Status and Schedule
DSC ChMC Switching Programme Update 10th July 2019
Presentation transcript:

ASPERA-3 July 31, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_31/ Page 1 Monthly Status Report Report due 7/25/01 Schedule statused TBD

ASPERA-3 July 31, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_31/ Page 2 Project Status Summary Technical May Jun July Detailed Description: (for items identified as yellow or red) Programmatic May Jun July Schedule May Jun July Resources May Jun July The unit returned to SwRI as reported last month was the flight spare housing and HVPS with the flight model amplifier board and MCP. After much trouble shooting and a handful of changes to the amplifier board components, the sensor is now behaving to spec. Count rates are what they should be and the output data looks very good. Remaining actions are to swap flight amplifier board into the flight housing, re-qualify and calibrate the flight assembly, and fix flight spare. Bottom line culprit was that the amplifier threshold was set a factor of ~10 too low based on now suspect data from MCP manufacturer. Latest project photos and videos are available on Aspera-3 web site.photosvideos

ASPERA-3 July 31, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_31/ Page 3 Problem and Concern Summary P=Problem C=Concern R=Resolved

ASPERA-3 July 31, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_31/ Page 4 Accomplishments of the Last Month -ELS Installed flight spare into characterization chamber sans housing for filament count rate test to try to reproduce problem at MSSL. Were able to reproduce the “saturation” problem. This eliminated the deflection system as the problem. We then continued trouble shooting ultimately leading to lowering the threshold of the amplifiers (2 resistors) to just above where they started to pick up noise on the bench. Based on the MCP data, this was well below the “valley” of the PHD. Repeated filament test. Count rate now at spec. Repeated characterization runs. Curves look very good. Repeated Ni63 runs that we were previously not able to do prior to board fix. (At that time, we blamed the poor results on the source as it was new and not proven). The data with the Ni63 now also looks very good.

ASPERA-3 July 31, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_31/ Page 5 Accomplishments of the Last Month - IMA No activities over the last month.

ASPERA-3 July 31, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_31/ Page 6 Accomplishments of the Last Month - Data Reduction Software Began Updates to APAF Project Data Management Plan (PDMP) for Version 1.2 Began Updates to APAF Data System Interface Document (DSID) for Version 1.1 Continued ELS IDFS Design –Began with Lab Data Review Continued Providing Technical Assistance for EPO Web Information Held monthly ASPERA-3 Software Status Meeting (July 31, 2001)

ASPERA-3 July 31, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_31/ Page 7 Planned Activities for the Next Month - ELS Get flight unit back from MSSL. Swap the amplifier boards from flight spare to flight unit (i.e. put flight unit board back into the flight unit housing). Make mods to flight spare amplifier board and reassemble flight spare. Re-qualify flight unit (random vibe, TVAC tbd). Re-perform characterization runs on the flight unit.

ASPERA-3 July 31, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_31/ Page 8 Planned Activities for the Next Month - IMA Support IRF in the assembly and test of the IMA flight model via telcon as needed.

ASPERA-3 July 31, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_31/ Page 9 Planned Activities for the Next Month - Data Reduction Software Tasks Continue Updates to APAF PDMP for Version 1.2 Continue Updates to APAF DSID for Version 1.1 Continue Dialog with Staff of PDS PPI Node and ESTEC Staff for Updates to the APAF PDMP and DSID Continue ELS IDFS Design Using Lab Data Continue Packet Definitions for NPI and IMA Continue Providing Technical Assistance for EPO Web Information Continue Defining and Implementing IDFS Web Tools

ASPERA-3 July 31, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_31/ Page 10 Problem and Concern Status Low count rate in ELS: We now think that we have the problem solved. The flight spare unit with the flight amplifier board and MCP performed very well during all of the “after fix” characterization runs. It is a fairly simple matter to make the amp board swap and then to re-run the characterization runs. Bottom line culprit was basing our amplifier threshold on data from the manufacturer. Lesson learned is to have variable threshold in the instrument that can be commanded external to the sensor. This would have allowed us to tailor the threshold as needed by command. We are currently negotiating with IRF over re-qualification requirements and re- delivery schedule to MSSL for calibration.

ASPERA-3 July 31, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_31/ Page 11 Schedule Summary ELS: ELS was delivered to MSSL / IRF on May 15. Problems surfaced during calibration and are still being worked. IRF is very aware of our activities and schedule. We are currently negotiating with both IRF and MSSL for upcoming schedule. Software: Software activities continue to be on schedule. The full-up schedule is available on the ASPERA-3 Web site.schedule

ASPERA-3 July 31, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_31/ Page 12 ASPERA-3 PHASE B/C/D MASTER SCHEDULE