Brussels on the 4th of December 2008 - COBECOS 1 Costs and Benefits of Control Strategies Small- scale consortium meeting Brussels 4th of December 2008.

Slides:



Advertisements
Similar presentations
State University – Higher School of Economics
Advertisements

DNV No. 1 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS THEMES Plans and expected contribution WP VII - Network Management.
ERA-LEARN Supporting the ERA-NET Learning Platform by creating a toolbox for the ERA-NET community Roland Brandenburg, FFG.
ERA-NET 1 REPORTING REQUIREMENTS. ERA-NET 2 Contract The contract for an ERA-NET is a contractual link of all participants with the Commission defines.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Slide 1 Workshop on NAPs and IPM – Brussels, January 2009 FRAMEWORK DIRECTIVE ON THE SUSTAINABLE USE OF PESTICIDES - What is new for Member States.
ENSEMBLES General Assembly, Prague, Czech Republic, November 2007 Potential WP Participants (known absentees underlined): DJF, DISAT, FMI, FUB, LUND,
Kick-off meeting November 2008, SYKE, Helsinki, Finland Nordic Call: CARAVAN: Next steps Timothy Carter Finnish Environment Institute,
COBECOS SIXTH FRAMEWORK PROGRAMME PRIORITY 8.1 WP 4 – DATA HARMONISATION London, 5 – 7 September.
COBECOS mid-term meeting, 2-3 September 2008, San Sebastian Italian case study: GSA 9 bottom trawling fishery Status of model estimation at September 2008.
Draft Framework Guidelines on System Operation - Process Presentation Workshop, Ljubljana, 24 August 2011 Uroš Gabrijel (ACER)
1 Software development WP6. 2 Team CEFAS: architecture and documentation IC: modules for calculating new functions (penalty prob.; enforcement cost) AZTI:
Brest, 27 – 29 of February COBECOS 1 COBECOS SIXTH FRAMEWORK PROGRAMME PRIORITY 8.1 Policy-Oriented Research Second progress meeting Brest, 27 th.
COBECOS Brest of February COBECOS SIXTH FRAMEWORK PROGRAMME PRIORITY 8.1 WP 4 – DATA HARMONISATION Brest of February 2008.
COBECOS Costs and Benefits of Control Strategies WP-8 SIMULATIONS.
WP 6 progress Cefas, Imperial (IC), AZTI, JRC (all participants) San Seb – Sep 2008.
Brussels on the 3rd of December COBECOS 1 Costs and Benefits of Control Strategies SIXTH FRAMEWORK PROGRAMME Policy-Oriented Research Jenny Nord,
2nd Year: Estimation of Theoretical Relationships WP 5.
AERONAUTICAL COMMUNICATIONS PANEL (ACP) TWENTY THIRD MEETING OF WORKING GROUP F WACAF/ESAF BRIEF REPORT BY OMODELE AROWOLO Cairo, Egypt 21 – 27 September.
1 CARE-ASAS Action Plan Francis Casaux CARE-ASAS Action Manager on behalf of EUROCONTROL.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
2 HOME DELIVERED MEALS Waiver Workshop Presented by: Regional and Local Services (RLS) Access and Intake /Area Agency on Aging (A&I/AAA) May 27-28, 2009.
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Cellule Environnement – Santé / Cel Leefmilieu – Gezondheid / Zelle Umwelt- Gesundheit 1 Updated information on Life+ proposal « DEMOCOPHES » DEMOnstration.
IPCC Good Practices Guidance and the electronic reporting of GHG inventory tables: useful tools for improving the quality of national GHG inventories of.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edwards University.
VOORBLAD.
- 1 - Heinrich Knottenberg ET WISC: WIS Development in 2006.
The Euronet-PBL Project: Overview of the Work Plan Pekka Kämäräinen University of Bremen, ITB, Presented at the 1st International Meeting of the Euronet-PBL.
1 Overview of Testing Methodology Obtain generic Test Scripts Populate Self Testing Work Paper Template Prepare actual test scripts Determine sample Combine.
1 Development of Electronic Reporting Tools for IPPC Directive and WI Directive Workshop – Objective and next steps Tuesday 3 rd March 2009 Meeting room.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
EU Developments Transmission Workgroup 6th October 2011.
1 Phase III: Planning Action Developing Improvement Plans.
NCHRP Task 254 Project Vehicle Size & Weight Management Technology Transfer/Best Practices.
Weekly Attendance by Class w/e 6 th September 2013.
UNSW Strategic Educational Development Grants
COBECOS kick-off introduction. Work- package No [1] [1] Workpackage title Lead contract or No [2] [2] Person- months [3 ] [3 ] Start month [4] [4] 1literature.
EUfolio Review of Project Activities Project Kick-off Meeting 9-10 May 2013, Dublin.
UGDIE PROJECT MEETING Bled September WP6 – Assessment and Evaluation Evaluation Planning  Draft Evaluation plan.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy.
Reykjavik rd of June COBECOS 1 COBECOS SIXTH FRAMEWORK PROGRAMME PRIORITY 8.1 Costs and Benefits of control strategies Final consortium meeting.
Bill Edgar (Dundee University) Matt Harrison (RIS) Volker Busch-Geertsema (GISS) European Commission MPHASIS Mutual Progress on Homelessness through Advancing.
San Sebastian 2 – 3 rd of September COBECOS 1 COBECOS SIXTH FRAMEWORK PROGRAMME PRIORITY 8.1 Policy-Oriented Research Mid-term meeting San Sebastian,
Transregional Workshop – Sofia, October 30, 2008 R4R Tools and Methodologies.
EPOCA – 11. June EPOCAConsortiumOrganisation.
1 st -4 th December st BioXHIT Annual Meeting WorkPackage 5.2: Implementation of Data management and Project Tracking in Structure Solution Peter.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
European Commission - DG Environment Workshop on P&P and NP, September 1-2, Brussels CAFE and the NECD review Stefan Jacobi European Commission, DG Environment,
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
INFSOM-RI Project Overview Alberto Di Meglio Project Manager 2.
Implementation recommendations 1st COPRAS review Presentation at 2nd COPRAS annual review, 15 March 2006, CEN/CENELEC meeting centre, Brussels Bart Brusse.
ERA-PLANET KoM, Brussels February 2016 WP4- Follow-up and monitoring of projects Dr. Joan Masó Center of Research in Ecology and Forestry Application.
J-AGE I Status/Closing Report JPI MYBL - GA Meeting Brussels 21th January 2016.
WP1: Plan for the remainder (1) Ontology –Finalise ontology and lexicons for the 2 nd domain (RTV) Changes agreed in Heraklion –Improvement to existing.
OFFICE OF FINANCIAL MANAGEMENT 0 Office of Financial Management Office of Financial Management BASS Budget Officers May 1, 2002.
EC project periodic and continuous reporting
Theme 3 – Physical loss and damage to the seafloor
Activity on environmental objectives and exemptions
ESS.VIP ADMIN EssNet on Quality in Multi-source Statistics, progress report 19TH WORKING GROUP ON QUALITY IN STATISTICS, 6 December 2016 Fabrice Gras,
Marine Strategy Framework Directive reporting: progress and next steps
Projects under Pillar I of White Paper on Climate Change Adaptation
Presentation transcript:

Brussels on the 4th of December COBECOS 1 Costs and Benefits of Control Strategies Small- scale consortium meeting Brussels 4th of December 2008

Brussels on the 4th of December COBECOS 2 Aims and expectations of the mid-term meeting Decision on which questions to run for the simulation Discuss WP 7 Case study progress – identification of problems and problems to deliver Modification of the computer code

Brussels on the 4th of December COBECOS 3 Progress during the last 6 months (as agreed in San Sebastian) Contributions for the activity and management report, asap – Finalised in time WP 5 -Finalization of the estimations of theoretical relationships in the case studies To Raul before the 1 st of November. Finalised with small delay WP 6 - Include multi-species functions in the code – 1 st of November – V2 was created to facilitate for multi species WP 7 - Finalization of work package. Distribution of template. Contributions to Charlie before Month 24 – Month 22 template distributed WP 8 - Start of work package –Distribution of template. List of questions to Paolo before the 1 st of September – Finalised in time Workshop for managers and the European Commission – Finalised Final meeting - May 2009

Brussels on the 4th of December COBECOS 4 Progress month 23 - overall picture WPWP nameResponsible partnerDeliverableDeadline for delivery (excluding 45 days) Month of delivery StatusComments WP 10Project coordinationJRC, IoESWeb-site00Finalized on time WP 1Literature reviewNHHReport3 3Finalized on time WP 2Data CollectionCEDEMReport12 Finalized on time WP 10Project coordinationJRC, IoESInterim activity Report12 Finalized on time WP 4Data harmonizationJRCDatabase128Finalized on timeJRC and Mrag to write a report (no deliverable) WP 3Theoretical modelingIoESReport188, 9Finalized on time - Modifications to the final deliverable Modifications carried out after the Brest meeting. WP10Project coordinationJRC, IoESPeriodic activity report18Finalized on time WP10Project coordinationJRC, IoESPeriodic management report 18Finalized on time WP10Project coordinationJRC, IoESNewsletter18Finalized on time WP 5Estimation of theoretical estimations AZTIReport:(18)24Started WP 6Software developmentCEFASSoft ware package i) design phase ii)implementation phase iii) maintenance phase i - 6 ii - 24 iii - 30 i) 6The design phase finalized on time The implementation phase started First version of V1 and V2 delivered. WP 7Calibrating and testingICReport(21) 24Template prepared WP 8SimulationsIREPAReport 27Questions prepared WP 9ConclusionsJRCFinal report Executive summary 30Starting month 27

Brussels on the 4th of December COBECOS 5 Various activities Periodic activity reports delivered – evaluation in process Workshop for stakeholders and the European Commission Investigation of the possibility of making the COBECOS computer model available in interface looking application.

Brussels on the 4th of December COBECOS 6 Focus for the next 6 month All work packages but WP 9 to be finalized (Month 27). Templates for WP 7 to Charlie Next meeting May 2009 (Month 28): report of WP 8 guidelines for WP 9 agreement on lessons learned agreement of recommendations

Brussels on the 4th of December COBECOS 7 Continue. Aims and expectations of the mid-term meeting - WP 8 - Agreement on questions for simulations 3 categories of questions/simultations: 1. Compliance in the past in the case of different enforcement 2. Future arrangements of fisheries management and enforcement 3. Mix of enforcement tools Each case study needs to answer at least 3 questions