Mounting best practices 1.Always mount to a solid, rigid surface when available 2.Whenever possible, it is recommended you mount the ShockLog directly.

Slides:



Advertisements
Similar presentations
Thule Smart RV™ Pod Kit Installation For Smooth-Sided Fiberglass RVs
Advertisements

Sectional Assembly and Installation
Electrical Trunking Lincoln Robinson Caliphor Fagan Richard Lawrence
FirstLight Voile Kit setup instructions.. All parts that are needed are supplied with the Firstlight Voile kit. Tools required are; 1.Protractor 2.Pencil.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
CORDLESS DRILL WHAT IS IT ? WHAT IS IT USED FOR ? click here
Optical Manufacturing Solutions 1 Probe Assembly.
Peppermill Demo Bayou Woodturners Demonstrator Jim Shackelford November 2009.
Click on this image to open the full PDF document.
Manual Screwdrivers –used for driving screws into a material and/or taking out screws HAND TOOLS Hammer –used for driving nails into a material and/or.
CONSTRUCTION OF A “LITTLE FREE LIBRARY” Gary Mehlum, pressed into service by wife and UHLS employee Mary Fellows (“When you marry a librarian, you marry.
Materials QtyLWHDescription 28’X4’X15/16”Plywood (15/16” is also known as ¾”) 88’X2”X1”Lumber – Pine 16Home Depot 5 Gal Bucket 48’Rolls of hook and tie.
Digital Counter Training Video’s & Instructions. Contents: Digital Counter Components Step 1: How to assemble the Digital Counter Step 2: How to attach.
How to diagram a pulley system!. Anchor point The anchor point should be a solid black box fixed to a surface.
Unit 42 Floor Framing Floor Unit Resting on Sill Plates • Floor Unit Resting on Cripple Walls • Posts and Beams • Floor Joists • Subfloor • Floor Underlayment.
Pneumatic Arm Assembly Instructions
ESD Constant Monitor System Packaging Bench set-up.
We Design Innovative Bus Interiors LED Retrofit Systems Designed ForPretoria Hadley/Transmatic L-20 and Hadley/Transmatic L-20 Fluorescent Aisle Lighting.
Institute of Marine and Coastal Sciences Glider Packing Instructions: Page 1 Step 1: Make sure the red stop plug is plugged into the glider and the green.
Robot Build IT Girls Allowed 2014 Updated 14 th August.
SANUS SYSTEMS THE UNION OF FORM AND FUNCTION Sanus Systems 2221 Hwy 36 West. St. Paul, MN
Polaris 6x6 UTV Instructions for Fuel Tank Vent Tube Modification 2005 – 2009 models For further information contact: Michelle Ryerson or Carl Dorsey,
Installation. Indoor Unit Installation Typical Installation.
How to build a small inexpensive low-tunnel hoop house.
Openergo A self-build rowing machine
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
Installation. Indoor Unit Installation Typical Installation.
AR4702 (cover plate replacement) Remove existing cover plate by removing the 2 x screws fixed through the top of the plate into the chassis (Phillips screw.
How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”
ShockWatch Flex.
Wire and spinning magnets Reference: Original Authur: William Beaty 1996.
VARCO PRUDEN’S Self Curbing Day Lighting Solution PrisMAX SL for SSR & HWR Roof’s.
Traditional Fixtures & Fittings 1 J. Byrne Fixtures & Fittings J. Byrne
J.Byrne Block Joint : Hard plastic Surface fitting, side to end Modesty Block : Hard plastic. Surface fitting, side to end Bolt & Cam : Metal.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
Thread Cutting Part 1: Cutting an internal thread.
Build a Simple Electric Motor Uses a stator made of windings, an armature with two coils, and a commutator.
Drilling machine. Introduction Drilling is a metal cutting process carried out by a rotating cutting tool to make circular holes in solid materials. Tool.
Lamp Housing Light Bulb Condensers Negative Carrier Bellows Lens Directions: Name each part Shown in the Diagram, starting At label “A”
Drill Press operations and such
Memory gift box leahfung.typepad.com. memory gift box opened.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
Section 2 Safety, Tools and Equipment, Shop Practices Unit 6: Fasteners.
Have your HW on your desk- Be sure that your work is shown- I need to be able to see how you got your answer. Work on IXL BB35 (nets)
Rotating Compost Barrel Construction
Assembly of steering.
VIEW SERIES with Sliding Door
STEP 1: ASSEMBLE ANGLE PLATES
INSTALLING BYRNE POWER BOX INTO FLEX SYSTEM
Objectives Describe the fasteners, anchors, and adhesives used in construction and explain their uses. f. Identify various types of mechanical anchors.
Hand Tools.
Chapter 12 Extension Surface Area of Composite Figures
STEP 1: ASSEMBLE ANGLE PLATES
Knock Down Fittings J.Byrne 2015.
Smitty’s Super Speed Drill for Memorization No. 3 Material Recognition
Louisiana Tech University
Assembly instructions for M-K all bolt together hoppercone kit.
Horizontal Installation Overview
Flag Installation on Roll-up Signs
Flag Installation on Roll-up Signs
Step-by-step assembly instructions
Traditional Fixtures & Fittings
Making a simple steady hand game
Fin & Countertop Sample Kit Instructions
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Omega Selection Center
Presentation transcript:

Mounting best practices 1.Always mount to a solid, rigid surface when available 2.Whenever possible, it is recommended you mount the ShockLog directly to the product being monitored using all four (4) supplied mounting bolts 3.When mounting inside packaging or crates, make sure the product is secured by foam or mounting screws to ensure the unit records accurate impacts to the shipment

Mounting best practices 4.Mount as low as possible, but note that it is more important to be nearest to the most sensitive part of your product 5.Long shipments (>20 ft) mount unit at both ends of the shipment 6.Irregular shipments mount the ShockLog as close to the most sensitive part of the shipment as possible.

Mounting best practices cont… 7.If you can't drill holes or are testing at different points on shipment, it is possible to use an aggressive adhesive or double sided tape 8.If the unit will be mounted externally to the product or packaging, a waterproof and/or tamperproof box is recommended 9.If monitoring a large shipment, always use the anti-vibration bushes

Mounting Diagram The isolation bushes must fit as shown. For the bushes to work correctly, the ShockLog 298 must not make metal-to- metal contact with the mounting plate

Mounting Plate If drilling holes in your product is an issue, a predrilled mounting plate with four isolation bushes and one fixing hole in the middle of the plate that attaches to the shipment. The mounting hole is supplied drilled for an M8 bolt but can be drilled out to accept a larger bolt. Single fixing bolt to surface

Not recommended Duct tape Twist ties Zip strips Nails