Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.

Slides:



Advertisements
Similar presentations
Operations Scheduling
Advertisements

Operations Scheduling
Scheduling.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Manufacturing’s Objectives
Operations Scheduling
Scheduling. Production Planning Process Process Planning Strategic Capacity Planning Aggregate Planning Master Production Scheduling Material Requirements.
DOM 102: Principles of Operations Management Operations Scheduling
Short Term Scheduling Introduction What – Scheduling or timing of operations Where – Timing of operations affects the overall strategy Why – Reduce costs,
Short-Term Scheduling
Inputs and Outputs to Aggregate Production Planning
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Short-Term Scheduling Chapter 15.
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
Scheduling.
Chapter 16: Learning Objectives
Operations Scheduling. Scheduling in a Process-Focused Environment.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1.
1. Facility size 2. Equipment procurement Long-term
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
ISQA 407 Introduction to Global Supply & Logistics Management Winter 2012 Portland State University.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
1 CAPACITY PLANNING (Chapter 6) How capacity is measured. p. 221 Capacity utilization = Avg output/Max capacity 221 Capacity planning over ST/MT/LT Factors.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
Operations Management
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Material Requirements Planning
Operations Management Short-Term Scheduling
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Scheduling Process and Production Management.
Operations Management Operations Scheduling
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
1 Slides used in class may be different from slides in student pack Chapter 19 Operations Scheduling  Work Center Defined  Typical Scheduling and Control.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Aggregate Planning and Resource Planning Chapters 13 and 14.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
1 Forecasting, Planning and Scheduling
Activity Scheduling and Control
Materials Requirements Planning
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Scheduling.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
15 - 1© 2014 Pearson Education, Inc. Short-Term Scheduling PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh Edition.
Inputs and Outputs to Aggregate Production Planning
PRODUCTION ACTIVITY CONTROL (PAC)
Operations Management
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
13 Aggregate Planning.
PRODUCTION ACTIVITY CONTROL (PAC)
Chap 11 Learning Objectives
Dr Sh Salleh bin Sh Ahmad
Operations Management
Manufacturing’s Objectives
Inputs and Outputs to Aggregate Production Planning
Presentation transcript:

Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001

Introduction What – Determine the quantity and timing of production for the immediate future Where – To meet forecasted demand Why – Minimize costs

The Planning Process Aggregate planning ties strategic goals to production plans Medium range – 3 to 18 months Requires: Measure of sales and output Forecast of demand for the period Method of determining costs Model that combines forecasts and costs

Aggregate Plan Relationships Aggregate Production Plan Marketing Customer Demand Engineering Design Completion Management Return on Investment Capital Human Resources Manpower Planning Procurement Supplier Performance Finance Cash Flow Production Capacity Inventory

Capacity Options Change inventory levels Change workforce size Change production rates Subcontracting Using Part-Time Workers

Demand Options Influence demand Back order during high demand periods Counterseasonal product mix

Strategies Chase strategy Level strategy Mixed strategy

MRP Introduction What – Plan requirements for components Where – Where components of a product are known Why – Individual component needs are dependant on the aggregate plan

Dependant Inventory Model Requirements Master Production Schedule Bills of Material Modular bills Planning bills Phantom bills Accurate Inventory Records Purchase Orders Oustanding Lead Times for Each Component

Dealing With Changing Requirements System Nervousness Time fence Pegging

Lot Sizing Lot for Lot Economic Order Quantity Part Period Balancing

Extensions of MRP Closed Loop MRP Capacity Planning MRP II

Short Term Scheduling Introduction What – Scheduling or timing of operations Where – Timing of operations affects the overall strategy Why – Reduce costs, improve response

Scheduling Forward Scheduling Backward scheduling Scheduling criteria Minimize completion time Maximize utilization Minimize work-in-process Minimize customer waiting time Objective: Optimize resources so that production objectives are met

Scheduling in Process- Focused Work Centers Job shop, low volume, high variety Schedule incoming orders without violating capacity constraints Check availability of tools and materials before releasing an order Establish due dates and check progress Check work in progress Provide feedback Monitor work efficiency statistics

Loading Jobs in Work Centers Input-output control Gantt charts

Sequencing Jobs at Work Centers Priority Rules First Come, First Served Shortest Processing Time Earliest Due Date Longest Processing Time

Critical Ratio Time Remaining / Workdays Remaining Highest Critical Ratio is selected for processing next

Limitations of Rules Scheduling is dynamic Rules do not look upstream or downstream Rules do not look beyond due dates

Finite Scheduling Computerized Short Term Graphical Interactive

Constraints and Bottlenecks Limit output in the production sequence Increase capacity Reroute work Change lot size Change work sequence Accept idleness