REVISION OF SCHEDULES/REQUISITIONS A)OUTAGE OF GENERATING UNIT B) REVISED DECLARATION OF AVAILABILITY BY CGS C) OUTAGE OF A TRANSMISSION ELEMENT D)UNFORESEEN.

Slides:



Advertisements
Similar presentations
1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Advertisements

1 FREQUENCY CONTROL -- Bhanu Bhushan -- (April, 2011)
ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
FREQUENCY SPECTRUM FROM AUGUST 06 TO OCT 06 (UPTO 20 TH OCT 06) < 49.0 HZ< 49.5 HZ< 50.0 HZ HZ>50.2HZ>50.5 HZ Aug
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
1 MondayTuesdayWednesdayThursdayFriday January February March April May
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Miao Lu 1. Content Overview I. Load Models II. Economic Dispatch III. Disturbance and Recovery IV. Demand-Side Management V. Energy Storage Units VI.
Effects of the Transmission Network on Electricity Markets © 2011 D. Kirschen and the University of Washington 1.
Consumer and Producer Surplus
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
SCHEDLING MECHANISM AND RELATED ISSUES T. SRINIVAS MANAGER,SRLDC BANGALORE.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Scenarios for a South African peaking CSP system in a short term Stellenbosch University Energy Postgraduate Conference 2013 Cebo Silinga Supervisor: Paul.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
1 August 14, 2003 Blackout MAC Meeting October 8, 2003 Paul Murphy IMO.
SUMMARY OF THE IG DISCUSSION PAPER ON THE BALANCING IN THE BALTICS Aistija Zubaviciute, NCC Baltic Electricity Market Mini-Forum 23rd November 2006, Vilnius.
Leader-Follower Framework For Control of Energy Services Ali Keyhani Professor of Electrical and Computer Engineering The Ohio State University
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
Quiz III Consumer and Producer Surplus. 1. Determine the consumer surplus at the equilibrium price shown below
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
LEASING. A Contract whereby the owner of the asset (The Lessor) grants the exclusive right to another party( The Lessee) to use the asset for an agreed.
MERIT ORDER OPERATION AND GRID DISCIPLINE S.P.KUMAR MANAGER(IT), SRLDC,BANGALORE.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
-- Bhanu Bhushan -- < > (August, 2011)
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Co-ordination of Power Balance Penalty Curve, VOLL, SWOC for AS Demand Curves.
Electricity pricing Tariffs.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
SRLDC 1 COMPETITION IN GENERATION Power Grid Corporation of India Limited New Delhi, India.
Availability Based Tariff (ABT) in Northern Region.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
Transmission Tariff V.Balaji Chief Manager SRLDC.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
Operations Update ERCOT Board Meeting March 18, 2003.
UTILISATION OF IDLING CAPACITY OF CAPTIVE POWER PLANTS-A VIABLE ALTERNATIVE BHANU BHUSHAN DIRECTOR(OPERATION),POWERGRID.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
AVAILABILITY BASED TARIFF. - Tariff structures - Two part tariff - Concept of ABT - ABT structure - Expectations from OEMs/Utilities Session outline.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
SEMs Specification Static type Composite meter Highest accuracy available in the power industry 3 Phase – 4 wire connections/measurement Direct measurement.
Energy Emergency Alert (EEA) UPDATE F EBRUARY 8, 2011.
Intro To Microeconomics.  Cost is the money spent for the inputs used (e.g., labor, raw materials, transportation, energy) in producing a good or service.
1 10. BUSINESS STRATEGIES IN ANCILLARY SERVICE MARKETS Asko Vuorinen.
Chapter 4 Consumer and Producer Surplus >> ©2011  Worth Publishers.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Issues involving Contract and Spot Sales of Hydropower in Peru.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Reactive Power and Voltage Control
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Impact of Wind Farms Aggregation on Large System Scheduling Cost Under Frequency Linked Deviation Settlement Mechanism Presented by Anoop Singh Authored.
Cost Accounting for Decision-making
National Institute of Wind Energy(NIWE)
Presentation transcript:

REVISION OF SCHEDULES/REQUISITIONS A)OUTAGE OF GENERATING UNIT B) REVISED DECLARATION OF AVAILABILITY BY CGS C) OUTAGE OF A TRANSMISSION ELEMENT D)UNFORESEEN LOAD-CREASH TAKES EFFECT FROM A)4 TH TIME BLOCK IN CASE OF -FORCED OUTAGE OF A GENERATING UNIT -TRANSMISSION CONSTRAINT -GRID DISTURBANCE -SUO MOTO BY RLDC B) 6 TH TIME BLOCK IN CASE OF -REVISION OF DECLARED AVAILABILITY BY CGS

SEB’S OPTIONS TO EVENTS 1.PROSPECTIVE REVISION OF CGS AVAILABILITY (UPWARD/DOWNWARD) SCHEDULE REVISED FOR REMAINING PART OF THE DAY 2. TRIPPING OF A CGS UNIT (KNOWN AFTER THE EVENT) IMMEDIATE FREQUENCY DIP ALL OPERATING UNITS PICK UP EXTRA MW SEB’S DRAWAL REDUCES  SEB RECEIVES UI PAYMENT SEB’S OPTIONS: (I)DRAW AS PER SCHEDULE AND FOREGO ADVANTAGE OF UI (II)REDUCE NET DRAWAL BY INCREASING OWN GENERATION AND/OR REDUCING LOAD > RECEIVE UI PAYMENT TILL CGS REVISES ITS AVAILABILITY AND NEW SCHEDULES COME INTO EFFECT

3.TRIPPING OF THE SEB’S OWN GENERATING UNIT SEB’S NET DRAWAL INCREASES  SEB HAS TO PAY UI SEB’S OPTIONS (I)CONTINUE TO OVERDRAW AND PAY UI (II)REDUCE NET DRAWAL BY CARRYING OUT CORRESPONDING LOAD SHEDDING AND/OR RUN UP ALL AVAILABLE GENERATION (III) INCREASE CGS REQUISITION, IN CASE FULL ENTITLEMENT WAS NOT REQUISITIONED EARLIER (IV) ENTER INTO A BILATERAL WITH OTHER SEB/CGS TO DRAW ANY SURPLUS/IDLING CAPACITY

4.LOAD CRASH IN THE STATE: FREQUENCY INCREASES UNDER DRAWAL FROM THE GRID  UI IMPLICATION (NET GAIN/LOSS) SEB’S OPTIONS: (I)INCREASE DRAWAL BY REDUCING OWN GENERATION (IF UI RATE IS LOWER THAN THE RESPECTIVE ENERGY RATE) RESTORE DISCONNECTED LOADS (IF UI RATE IS LOWER THAN THE RECOVERY RATE) REDUCE CGS REQUISITION (IF UI RATE FALLS BELOW CGS ENERGY RATE) CONTINUE TO UNDER DRAW, IN EFFECT SUPPLYING UI TO THE GRID. THIS IS ADVANTAGEOUS AS LONG AS THE UI RATE IS HIGHER THAN THE ENERGY RATE

FOUR SCENARIOS …1 A.FREQUENCY IS GOOD OR HIGH, AND THE STATE IS OVERDRAWING: -NO PROBLEM, AND NO ACTION REQUIRED FOR ENHANCED OPTIMIZATION, HOWEVER TO THE EXTENT POSSIBLE. (I)REDUCE OWN GENERATION TO THE EXTENT POSSIBLE AND INCREASE OVERDRAWAL SO LONG AS FREQUENCY IS ABOVE ABOUT 49.8 HZ. (II) RESTORE CONSUMER LOAD THAT HAD BEEN SHED, PROVIDED TARIFF/REALIZATION RATE IS HIGHER THAN CURRENT UI RATE. (THIS ALSO INCREASES OVERDRAWAL) (III) INCREASE CGS REQUISITION, IF SOME PART OF THE ENTITLEMENTS HAD NOT BEEN REQUISITIONED EARLIER, PROVIDED THE FREQUENCY IS (AND IS LIKELY TO REMAIN) BELOW ABOUT 50.2 Hz. (THIS WOULD INCREASE THE DRAWAL SCHEDULE AND THEREBY REDUCE OVERDRAWAL)

FOUR SCENARIOS …2 B. FREQUENCY IS GOOD OR HIGH, AND THE STATE IS UNDER DRAWING: ACTION REQUIRED (I)REDUCE OWN GENERATION TO THE EXTENT POSSIBLE, IF THE FREQUENCY IS ABOVE ABOUT 49.8 HZ. (THIS WOULD REDUCE UNDERDRAWAL) (II) RESTORE CONSUMER LOAD THAT HAD BEEN SHED, AND REDUCE UNDERDRAWAL (III) REDUCE CGS REQUISITION, PROVIDED THE PREVIOUS TWO ACTIONS HAVE BEEN TAKEN AND THE FREQUENCY CONTINUES TO BE ABOVE HZ. IF FREQUENCY IS LIKELY TO REMAIN ABOVE 50.2 HZ., BILATERAL SALE TO A NEEDY NEIGHBOUR CAN BE TRIED C. FREQUENCY IS LOW, AND THE STATE IS OVERDRAWING: ACTION REQUIRED (I)INCREASE OWN GENERATION TO THE MAXIMUM POSSIBLE EXTENT (II) CURTAIL CONSUMER LOAD, LOAD SHEDDING TO BE GRADED BALANCING BETWEEN UI PRICE AND CONSUMER CATEGORY (III) INCREASE CGS REQUISITION TO FULL ENTITLEMENT (IF NOT REQUISITIONED FULLY EARLIER), AND ARRANGE FOR BILATERAL PURCHASE FROM ANOTHER SEB/CGS

FOUR SCENARIOS …3 D. FREQUENCY IS LOW, AND THE STATE IS UNDERDRAWING: NO ACTION REQUIRED; FOLLOWING CAN BE DONE FOR ENHANCED OPTIMIZATION. (I)INCREASE OWN GENERATION TO THE EXTENT POSSIBLE, PROVIDED THE FREQUENCY IS BELOW ABOUT 49.5 HZ. (COMPARING VARIABLE COST WITH CURRENT UI PRICE) (II) CURTAIL CONSUMER LOAD,BY SHEDDING LOW PRIORITY LOAD (PROVIDED UI EARNING FOR THE SEB JUSTIFIES SUCH LOAD SHEDDING). THIS IS TOTALLY OPTIONAL, AND HELPS THE GRID (III) INCREASE CGS REQUISITION TO FULL ENTITLEMENT (IF NOT REQUISITIONED) FULLY EARLIER), AND EARN UI OR SELL THE SURPLUS THROUGH A BILATERAL AGREEMENT ACTION DEPENDS ON PREVAILING FREQUENCY, AND IS INDEPENDENT OF SHETHER OVERDRAWING OR UNDERDRAWING. IT FOLLOWS THAT ON-LINE MEASUREMENT AND DISPLAY OF CORRECT NET DRAWAL IS NOT ALL THAT CRITICAL.

MANAGEMENT OF DRAWALS CURTAILMENT OF DRAWAL BY SEB A)IF UI RATE IS HIGHER THAN THE HIGHEST ENERGY RATE OF THE STATIONS SCHEDULED, THEN CURTAIL DRAWAL BY MAXIMISING CHEAPER GENERATION B) IF UI RATE IS HIGHER THAN CONSUMER LOAD NET RECOVERY RATE THEN CURTAIL DRAWAL BY LOAD SHEDDING