BOX JACKING. EXPLANATION It is the process in which a pre-cast R.C.C box or a rigid box is pushed into the soil with the help of hydraulic jacks It is.

Slides:



Advertisements
Similar presentations
CONSTRUCTION DRILLING INC.
Advertisements

The living environment and maintenance theory of tunnel Tongji University Xu P. Yao.
SITE INVESTIGATION.
BOX PUSHING TECHNOLOGY
Lorong Halus Interchange Introduction: Project to build a new $26 million interchange for the Tampines Expressway starting The site was situated.
Environmental Drilling By: Josh Humphreys October 8,2006.
Marine Construction SCM 330 Tyler Mason Pratt Tyler Mason Pratt
Chp12- Footings.
Click to continue…. Railroad Track wetland Image Date: December 2003.
CONSTRUCTION OF SOIL NAILING WALLS
Trench Support Methods
Groundwater Control Affects design of: –Permanent Works –Temporary Works May affect viability of scheme Safety Issues –May cause instability of excavation.
Trenching and Excavating Safety. Asphyxiation Each time a breath is exhaled the weight of the load restricts inhalation of the next breath. Slow suffocation.
GROUNDWATER CONTROL.
Soils and Foundations.
Chapter 34 Bridge Construction.
The Construction of Qinghai-Tibet Rail line dealing with problems of frozen earth Msc Xi Deng Ke Wang.
Foundations Excavations
Foundation Systems.
Warm Up Think about where water comes from. Is there more or less water on Earth than there was 1 billion years ago?
1 Pile Installation Pile installation is as important as design. In this section, two types of methods: a)Installation by Driving b)Installation by Boring.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
CONSTRUCTION.
Competency: Draw Foundation Plans
JAMES THOMSON C. ENG JACKED STRUCTURES SA JACKED STRUCTURES SA A New Approach to Constructing Underground Stations.
Basic Civil Engineering-Foundation
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
Chapter 18 Foundations.
Construction Dewatering
Foundation Engineering CE 483
TRENCHLESS TECHNOLOGY
Chapter 2b Foundations Shallow & Deep Foundations.
Other Construction Projects
Details of Construction Lecture-2 “Shallow Foundation”
Dam Placed across a river to block or control the flow of water.
CAISSON FOUNDATION.
Head works.
ESS 315.  Any rock/soil at or below the freezing point of water.  Remains below 0 degrees Celsius continuously for two years.  Ice is not necessarily.
Drilling Interlocked O-Pile Walls with DTH + PPV FINLAND.
Track Drainage CE2303 Railway Engineering. Drainage-General Drainage is the natural or artificial removal of surface and sub-surface water from an area.
Foundations of Marine Structures SOIL MECHANICS CIVIL ENGINEERING DEPARTMENT BMCET JOSLIN JOSH GATHA DESAI.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
Sardar Vallabhbhai Patel Institute Of Technology,Vasad.
Understand foundation design and construction
CAISSON FOUNDATION.
SOIL MECHANICS AND FOUNDATION ENGINEERING-III (CE 434)
BUILDING CONSTRUCTION
Excavation & Trenching Awareness Plus
PILING TECHNIQUES.
J.PRATHYUSHAG.TEJASRI DEPARTMENT OF CIVIL ENGINEERING.
Piling.
Substructure Groundworks - Hazards
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
Science- Chapter 4.
FOOTING AND FOUNDATION
TRENCHLESS TECHNOLOGY
INTRODUCTION TO TRENCHLESS TECHNOLOGY
BOX JACKING.
Ground improvement techniques
EXCAVATION, LATERAL RESTRAINMENT FOR IT AND DEWATERING
Pipejacking Advantages & Disadvantages
Arch205 Materials and building construction 1 foundation
CONSTRUCTION METHODS & TECHNOLOGY
Arch205 building construction foundation
Foundations Four Basic Types Footings Piers Pilings Slabs
Building Construction I Sofia Sebastian 1
Competency: Draw Foundation Plans
Factors to Consider in Foundation Design Chapter # 02
BUILDING CONSTRUCTION Foundation
Presentation transcript:

BOX JACKING

EXPLANATION It is the process in which a pre-cast R.C.C box or a rigid box is pushed into the soil with the help of hydraulic jacks It is non-intrusive method beneath the existing surface. It is more often used when a subway or a aqueduct or a underground structure is to be constructed. It enables the traffic flow without disruption.

R.C.C BOX JACKING First the box section is designed and cast at the site or can be transported to the site according to the requirement. The foundation boxes are jacked into the ground designed to carry the dead and the live loads. Then the high capacity jacks are placed at the back and it pushes the box into the ground. A purpose designed tunneling shield is provided in the front end.

Then the box is jacked carefully through the earth. Excavation and jacking are done in small increments in advance. Measures should be taken to prevent the soil being dragged towards the box. R.C.C BOX JACKING Cont…

R.C.C BOX JACKING

ARCHED JACKING

THRUST BORING METHOD It is a process of simultaneously jacking the pipe through the earth while removing the earth inside the box by means of a rotating auger. Unstable conditions- the end of auger is kept retracted inside the encasement so as not to cause voids. Stable conditions- the auger can be successfully extended beyond the encasement. This can be successfully used in any kind of soil conditions.

PROBLEMS ENCOUNTERED IN JACKING Settlement of the above ground. Seepage of ground water. Caving in of soil etc.

FREEZING OF GROUND This method is used when we encounter the problem of ground water seepage and settlement of ground. In this method a brine solution is continuously passed through the pipes fixed in the soil. The temperature of the brine would be -30°c. So when this brine solution is circulated through these pipes it freezes the ground and the ground behaves like an ice block.

FREEZING OF GROUND Cont… The spacing of the freezing pipes will vary according to the type of soil, its permeability and other factors. Generally it is kept at a spacing of 1.2 m

PROBLEMS IN FREEZING The main problem in the freezing method is the UPHEAVING of the above ground. To avoid the upheavement problem we should be careful in the ground freezing process and the temperature of the brine solution.

CASE STUDY - SOUTHERN BOSTON PIERS TRANSIT WAY The carriageway has to go beneath – a Russian building,100 year old 2m thick soil was frozen. Under pinning was also done using mini piles.

PLAN OF THE RUSSIAN BUILDING

ADVANTAGES Timely completion of project. No disruption of traffic. No need to divert the traffic. DISADVANTAGES Cost of project increases. Skilled personnel required. Safety precautions to be done properly.