1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.

Slides:



Advertisements
Similar presentations
Prototype Progress… The Stony Brook Crew & Bob Azmoun, Craig Woody.
Advertisements

1 HBD Update Itzhak Tserruya DC meeting, April 9, 2008 April 9, 2008.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
LAPPD status report. 6cm system status  System up and running since July –Temperature profile carefully mapped out in sealing and deposition chambers.
Tent Update 5 Feb 2008 Matt Durham for tent crew.
CsI Photocathode Production and Testing
1 HBD Update Itzhak Tserruya DC Upgrades meeting HBD, BNL, July 13, 2005 Prototypes  Full scale HBD  Readout board  FEM Final detector  HBD Design.
HBD Tasks Outline Thomas K Hemmick. New News  Second good QE result from Bob.  New quotes on reduced Glove Box:  $39,000 will not work (air lock too.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
MIT runs syn no label No Label was not connected TTL trigger from delay box CH A to syn.
1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
1 Searching for the QGT: Quantum Efficiency Gain Transparency TK Hemmick for the HBD Crew.
1 AGENDA: HBD NIM paper#2 Itzhak HBD HV system HBD monitoring Acceptance and total number of channels Proposal status Large GEM tests Lev Monte Carlo Ilia.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Sasha Milov HBD upgarde Feb 8, Assembly and testing facility. Sasha Milov Feb 8, 2005 Glove Box Other needs Testing.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
1 Stony Brook Update: Keep It Clean T.K. Hemmick for the Tent Crew.
1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
1 Progress on Cathodes Thomas K Hemmick, Richard Hutter, Alberica Toia, Bill Anderson, Jason Kamin.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
Status of NA62 straw electronics Webs Covers Services Readout.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
1 Sasha Milov DC meeting Nov 9, 2005 HBD upgrade status. Sasha Milov Nov 09, 2005.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
1 Sasha Milov DC meeting... March 7, 2007 HBD status Sasha Milov March 7, 2007.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Status Update Stony Brook Crew. Progress on Glove Box None to report. Bids still out. Have enough $$$ for big one. Expect no surprises.
6-Aug-02Itzhak Tserruya PHENIX Upgrade mini-Workshop1 Boris Khachaturov, Alexander Kozlov, Ilia Ravinovich and Itzhak Tserruya Weizmann Institute, Israel.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
Itzhak Tserruya, BNL, May13, HBD R&D Update: Demonstration of Hadron Blindness A. Kozlov, I. Ravinovich, L. Shekhtman and I. Tserruya Weizmann Institute,
HBD Status Report C. Woody For the HBD Crew DC Meeting June 13, 2007.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
PHENIX WEEKLY PLANNING 3/09/06 Don Lynch. BLM Test BLM Test Installation He Bags.
CLAS12 Drift Chamber Prototyping
GEM tests at BNL Zvi, Sasha, Ilia and others. Triple GEM detector tests Last Tuesday after HBD meeting we exchanged CF4 by Ar/CO2 but still there were.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
1 Sasha Milov DC meeting Sept 12, 2007 HBD status Sasha Milov Sept 12, 2007.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
1 Stony Brook Update: Another Frustrating week... However difference is isolated: CF 4 T.K. Hemmick for the Tent Crew.
1 Sasha Milov HBD meeting Oct 24, 2006 LAMP SUNYSB Craig, Matt & Sasha Oct 24, 2006.
1 Alexander Milov CIPANP06 June 02, 2006 Hadron Blind Detector for PHENIX experiment at RHIC Alexander Milov (for the PHENIX collaboration) Jun 02, 2006.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
1 HBD R&D: Update Itzhak Tserruya (for A. Kozlov, I. Ravinovich and L. Shekhtman) Weizmann Institute, Rehovot DC meeting Feb. 14, 2003.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
1 Recent Updates Stony Brook Crew. 2 Maintenance Week Cryo Gate Valve –Dirt-like black substance on Valve—cleaned –Repair Successful; no more leaks. Rebuilt.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
1 Sasha Milov Phenix focus HBD June 20, 2006 Hadron Blind Detector for low mass di-leptons in PHENIX Sasha Milov (PHENIX focus on HBD) Jun 20, 2006.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
1 Alexander Milov Goldhaber Mini-Symposium Jan 26, 2006 Hadron Blind Detector for PHENIX experiment at RHIC Alexander M. Milov Jan 26, 2006.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
LKr status R. Fantechi.
10/month is the present production rate 2 FTE + sporadic contributions
On the Prototype beam test: (I) Noise and signal extraction
Limited Streamer Tube Project Summary
Presentation transcript:

1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006

2 Sasha Milov DC meeting Jan 11, 2006  Mechanical assembly Mechanical parts are being produced PCB design finalized, Itzhak is at CERN negotiating production time. A backup option considered.  Photocathode production and measurement SUNYSB to start weekly cycles of evaporating and measurements  Testing GEM testing box is in work, needs to be equipped with LEMOs BNL makes preparations to measure CF 4 scintillation LEGS beam test is not happening soon (as planned)  Electronics and monitoring status ADC unit works yet without real input and looks good (see a backup slide) Takao shown framework to monitor HBD performanceProgress:

3 Sasha Milov DC meeting Jan 11, 2006 Mechanical parts and PCB. PCB final design. Quick MC shows no difference with standard cells Entrance window frames are ready, the window itself to be tight between them

4 Sasha Milov DC meeting Jan 11, 2006 Gas monitoring system. Input and two outputs measured by moving mirror. More expensive but clearly better Input and two outputs measured by switching gas

5 Sasha Milov DC meeting Jan 11, 2006 SUNYSB starts evaporation cycles.  Status: Evaporator – OK, as it was last time Laminar table – OK. Filters replaces, ready to go. Vacuum storage – almost OK, matter of days. Frames to hold GEMs are manufactured. Test box arrived needs connectors (~2 weeks) Glove Box new is still in the bidding stage, INFN may get some improvement for to be used for gearing up Gas system in assembly stage  Strategy is to start weekly cycles of going from start to end getting more and more operations in routine from cycle to cycle. Use laminar table assembly Pump to water drop, as seen last time Evaporate and measure Q.E. in situ Get chicklets to Bob A. for Q.E. control  Next cycle (reusing the same GEM for evaporation): Improve in situ Q.E. control add GEM triplet gain measurement

6 Sasha Milov DC meeting Jan 11, 2006 Back to prototype?  With “unexpected” return of Run6 we need to make sure the full scale prototype can go in and work to have something better. 1R, Bertan (4100V), I~330  A1R, LeCroy (2400V), I~194  A 2R, Bertan (4100V), I~165  A2R, LeCroy (4100V), I~165  A Bob checked that the LeCroy power supply can be used. It requires divider resistance to be doubled. No extra noise detected.

7 Sasha Milov DC meeting Jan 11, 2006  PCB (Itzhak)  Gas Monitoring System (Craig)  Glove Box (SUNYSB)  Signal Cables (BNL + Chi independently)  Infrastructure preparation in the IR (Don+) Important standing Issues.

8 Sasha Milov DC meeting Jan 11, 2006  Mechanical assembly is on its way. Pad plane design is finalized  SUNYSB is starting cycle to get up to a reliable routine operation.  First look at the ADC modules is encouraging. More to come when a preamp board prototype is attached to it  Glove Box is still waiting bids to come back. There are other items with long lead time and we are working on getting them out soon.  Prototype needs to be in a good shape no matter what. It can operate on LeCroy PS, which is available. However the gas tightness might limit gas purity one can achieve with it.  GEM testing box in in work. We might be able to measure GEM stacks in weeks from now. BNL will try to do a scintillation measurement.Summary:

9 Sasha Milov DC meeting Jan 11, 2006 BACKUPS

10 Sasha Milov DC meeting Jan 11, 2006 Electronics signals.