An overview… Power Grid Corporation of India Limited OS deptt., POWERGRID.

Slides:



Advertisements
Similar presentations
POWERLINKS TRANSMISSION LIMITED a joint venture of TATA POWER &POWERGRID.
Advertisements

SYSTEM OF EVALUATION AND MANAGEMENT CONTROL RESULTS-BASED BUDGETING THE CHILEAN EXPERIENCE Heidi Berner H Head of Management Control Division Budget Office,
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
Increased Role of Finance Professionals in Power Sector – 12 th Plan & beyond Er. A. K. Bohra, Director, NESCO, WESCO, SOUTHCO and CEO, Central Services.
April, 2006 PRESENTATION BY POWERGRID. FORMATION OF POWERGRID POWERGRID was formed in 1989 and began commercial operation from 1992 – 93 with the following.
Proposed APDRP during 11 th Plan  Continue APDRP during the XI Plan with the revised terms and conditions as a Central Sector Scheme.  The focus of.
Funding for a brighter tomorrow 1 POWER SECTOR CONCLAVE 14th – July Avkash Saxena General Manager (APDRP) Power Finance Corporation Ltd. Restructured.
Australia’s Experience in Utilising Performance Information in Budget and Management Processes Mathew Fox Assistant Secretary, Budget Coordination Branch.
Financial Management for Africa Centers of Excellence Project Presented by Patrick Umah Tete, World Bank on May 20, 2014 during the launch of the project.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Ministry of Rural Development Pradhan Mantri Gram Sadak Yojana (PMGSY) Presentation for Standing Committee on Home Affairs on Infrastructure Projects and.
Transmission and Distribution - Role of Indian Electrical Equipment in the XII Year Plan. Presentation by: Sterlite Grid Ajay Bhardwaj COO.
 Strong reforms underway in Serbia, still numerous challenges ahead  Importance of setting priorities within national agenda  Joint efforts of all.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
0 Kestutis Rekerta Strategic Planning Division, Government Office of Lithuania World Bank Workshop, Bratislava, September 6, 2006 STRATEGIC PLANNING IN.
1 ADB Support to Transboundary Water Resources Management in Central Asia Hong Wei Country Director Uzbekistan Resident Mission Asian Development Bank.
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
1 THE INFRASTRUCTURE OPPORTUNITY : A MACRO PERSPECTIVE Rajiv B. Lall Managing Director & CEO Infrastructure Development Finance Company Limited JAPAN MAY.
Integration Development Programme in the Field of Statistics of the Eurasian Economic Union for EEC THE EURASIAN ECONOMIC COMMISSION.
Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Water Services Training Group 13 th Annual Conference 10 th.
From the Shredded Files of Big Business Assuring safeguards with effective Financial Policies Pam Baker and Ernest Werstler.
Sanjay Garg General Manager PGCIL/ Ministry of Power
Sterlite Grid Limited Committed to the nation's mission to provide quality power for all.
The Multilateral Fund and its Management Structure UNFCCC Workshop on the Adaptation Fund 3-5 May 2006 Alberta, Canada Maria Nolan Chief Officer - Multilateral.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
PUBLIC PROCUREMENT SYSTEM IN TAJIKISTAN RAVSHAN KARIMOV AGENCY FOR PUBLIC PROCUREMENT UNDER THE GOVERNMENT OF THE REPUBLIC OF TAJIKISTAN.
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
University of Minnesota Internal\External Sales “The Internal Sales Review Process” An Overview of What Happens During the Review.
Kiichiro Fukasaku Development Centre
Urban water supply The privatization process in Mozambique
National Hydrology Project The Way Forward Dr. Amit Prasad 15 th September, 2015, New Delhi.
Power Trading The Indian electricity sector has grown manifold since independence making India the third largest producer of electricity in Asia. The installed.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
By Rasa Snipiene, Director of PCU1 Education Improvement Project, Lithuania Management and Operation.
1 EUROPEAN FUNDS IN HALF-TIME NEW CHALLENGES Jack Engwegen Head of the Czech Unit European Commission, Directorate General for Regional Policy Prague,
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
Presentation on Capacity Addition targets for X th Plan MINISTRY OF POWER 2 nd May 2002.
Overall National Grid Development: Constraints & Options
TEN-T Executive Agency and Project Management Anna LIVIERATOU-TOLL TEN-T Executive Agency Senior Programme and Policy Coordinator European Economic and.
Business Process Mapping “Power Sector - Distribution”
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
1 Teaching Innovation - Entrepreneurial - Global The Centre for Technology enabled Teaching & Learning, N Y S S, India DTEL DTEL (Department for Technology.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
State IT Agency Briefing on Annual Report 2014/15 to Parliamentary Portfolio Committee on Telecommunications and Postal Services 16 October 2015.
Performance of the Integrated National Electrification Programme as at 30 June 2008 (4 rd Quarter) Presentation to the Select Committee on Finance 14 August.
Amman October 1-2, 2003 Presentation Evolution of Saudi Telecom During Sector Reform 3 rd Annual Private Sector Cooperation Meeting in the Arab Region.
POWERGRID Welcomes Shri Atal Bihari Vajpayee Hon ’ ble Prime Minister of India on Inauguration of Northern Region Unified Load Dispatch and Communication.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
Power Transmission Rehabilitation Project TERMS AND CONDITIONS OF INVESTMENT FUNDS “High Voltage Electric Networks” CJSC (HVEN CJSC) is implementing.
Reforms in the Albanian Public Procurement System 7 th Regional Public Procurement Forum Tbilisi, Georgia May 16-19, 2011 PUBLIC PROCUREMENT AGENCY 1.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
1 STRATEGIC PLANNING AND BUDGET PRIORITISATION IN CROATIA Francois-Roger Cazala, Rimantas Veckys SIGMA - Lithuanian Ministry of Finance.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
National Hydrology Project Dr
National Training Programme For C&D Employees (Variant 3-Financial Management ,Store Accounting and Office Admininstration) )
Damitha Kumarasinghe Director General
Introduction/Background Aim of the assessment was to assess the impact of the 3 institutions MOHCDGEC, PO-RALG and MOFP in the flow of funds from national.
Designated National Authority
Parliament and the National Budget Process
National Hydrology Project
PEMPAL, Moscow, October 2016 Natalia Pilets Deputy Head,
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
Challenges in Financing Renewable Energy
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
Somaliland PFM Reform Programme
Yangon Region Rural electrification plan
Ministry of National Economy of The Republic of Kazakhstan
Roles and Responsibilities
Portfolio Committee on Communications
Presentation transcript:

An overview… Power Grid Corporation of India Limited OS deptt., POWERGRID

Areas of Operation Telecom Development of Central Sector Transmission System Grid Management Generation Linked Grid Strengthening Inter-regional links International links Estb. of modern Load Despatch Centres Real-time Grid Operation Optimum scheduling & despatch Owns & Operate Fibre optic cable network Licenses - IP-I, ISP and NLDO Consultancy National & International Transmission Load Dispatch & Communication Distribution Telecom OS deptt., POWERGRID

POWERGRID – A snapshot Line length HVDC System 500 kV – 4368 ckm AC System 765 kV – 1297 ckm 400 kV – ckm 220 kV – 7823 ckm 132 kV – 2241 ckm 66 kV - 37 ckm Total ckm Substations 109 no. Transformation capacity MVA As on Carries % of India’s power Network availability > 99% (99.66%) OS deptt., POWERGRID

Equipment Population AC system Lines - Total 461 nos. 765 kV - 6 nos. 500 kV HVDC – 4 nos 400 kV – 290 nos 220 kV – 124 nos 132 kv – 36 nos. 66 kV - 1 no AC Transformers212 Shunt Reactors314 HVDC Transformers72 Circuit Breakers1810 CT4240 CVT2940 LA3110 HVDC system No. of HVDC lines4 No. of HVDC back to back stations4 Major Elements

Asset classification Internally - 8 Regions with RHQs at –NR-I, Delhi –NR-II, Jammu –ER-I, Patna –ER-II, Kolkata –WR-I, Nagpur –WR-II, Vadodara –SR-I, Hyderabad –SR-II, Bangalore –NER, Shillong For tariff purpose – 5 regions –( NR, ER, WR, SR & NER )

Reduced grid disturbances  No major grid disturbance in last 4 ½ years  Transmission losses 3-4% in line with international standards

Physical performance Transmission network addition (Ckt Kms) ( to ) ( to ) ( to )

Sub-stations Addition (Nos.) ( to ) ( to ) ( to ) Physical performance

Capital expenditure ( to ) ( to ) ( to )

Monitored Performance Parameters of Transmission System Availability –Availability of the transmission system Reliability –No. of trippings per line attributable to POWERGRID

Performance of the transmission system during against MoU target

No. of tripping / line - MOU Target Vs Actual (Reliability factor )

Capacity Addition Programme (MW) -XI Plan TypeCentral Sector State Sector Private Sector Total Thermal26,80024,3477,49758,644 Hydro9,6853,6053,26316,553 Nuclear3,380-- Total39,86527,95210,76078,577 Source: Ministry of Power (May’07) Ultra Mega Power projects (UMPP) of about MW is also envisaged

XI PLAN INVESTMENT PROGRAMME S. NoTYPE OF PROJECT/SCHEMEProject CostOutlay 1 On -Going Schemes Under Investment Approval - Transmission schemes Tr. System associated with Sasan (4000 MW) and Mundra (4000MW) UMPPs New Schemes -System under Finalisation Schemes under initial stage of discussion Inter-State Tr. System for DVC Projects Investment in JVs Completed Schemes Grand Total ≈ 55,000  An investment of about Rs. 55,000 Crore is estimated by POWERGRID covering more than 115 no. of projects/ schemes

Proposed Funding for XI Plan IEBR for XI Plan, considering IPO, sale of securitised bonds is summarized as under: S. No DescriptionAmount (Rs in Crore) i.Internal Resources16,500 ii.Domestic loans22,980 iii.Foreign loans15,520 Tied-up(PSDP-III & ADB-III of USD 400 million each) 2,800 New loan of USD 1000 million from ADB and first tranche of 600 million from WB under discussion 6,560 Un-tied 6,160 Total IEBR (i+ii+iii)55,000

Plan wise Performance

PHYSICAL PERFORMANCE Transmission network addition (Ckt Kms) ( to ) ( to ) ( to )

PHYSICAL PERFORMANCE Sub-stations Addition (Nos.) ( to ) ( to ) ( to )

CAPITAL EXPENDITURE ( to ) ( to ) ( to )

FINANCIAL PERFORMANCE Excellent growth achieved despite downward revision in tariff norms by CERC

Per capita consumption (kWh) Generation Capacity (GW) BEYOND XI PLAN  National Grid capacity : 1,50,000 MW by 2027  Power scenario:  Investment requirement for POWERGRID by 2027: Rs. 6,000 Billion

PERCENTAGE OF TIME FREQUENCY IN NORMAL BAND ( Hz) Improved System Performance COMPARISON OF BANGALORE VOLTAGE ON TYPICAL DAYS IN LAST 4 YEARS upto Aug' YEAR % OF TIME NorthernRegionWestern RegionSouthern RegionEastern Region POST ABT / ULDC PRE ABT / ULDC Post Sync. Of Central Grids i.e. NR, ER & WR, NER

 First Joint Venture (JV) project with M/s. TATA POWER successfully completed - Rs. 1,600 Crore  Commissioning of the project signifies the success story of Public-Private Partnership in Indian Power Sector.  This public-private participation model has been supported by premier institutions like IFC, ADB, SBI & IDFC. IFC appreciated the model in following words, “This is a unique model of public-private participation that has the potential for replication in India and abroad” FACILITATING PRIVATE PARTICIPATION

 JVs under finalisation -  Signed MoUs with Five Independent Power Producers at Rs Crore  Formed JVs with Torrent Power Ltd and Jaiprakash Hydro Ltd. (Rs. 1,300 Crore)  Koldam and Parbati transmission system at Rs. 660 Crore  Independent Power Transmission Company (IPTC) route  Part of Western Region Strengthening Scheme – II (Rs Crore) through 100% private participation – bids under evaluation FACILITATING PRIVATE PARTICIPATION

BUSINESS DEVELOPMENT  Strengths  In-house expertise in Planning, Engineering, Telecommunication, Load Despatch & Communication, Distribution, Sub-transmission, Contracting, Finance and Project Management  Providing Consultancy services to Power/ Telecom Utilities in India and at International level  Growth in Consultancy revenue:

 Accelerated Power Distribution & Reforms Programme (APDRP):  Advisor-cum-Consultant (AcC) in 18 States spread over 178 distribution circles/ towns/ schemes costing about Rs. 7,450 Crore  Implementing network expansion and strengthening schemes of about Rs. 1,315 Crore on behalf of 7 States - Bihar, Goa, Uttar Pradesh, Gujarat, Meghalaya, Tripura and Mizoram on deposit work basis under bilateral arrangement.  Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY):  Implementing rural electrification projects in 9 States involving 88,300 villages with a total Project cost of Rs. 9,400 Crore.  POWERGRID’s share in total rural electrification work of the country is a major 30%. In , POWERGRID successfully created infrastructure for electrification of 14,640 no. of villages, out of country-wide achievement of 40,000 villages. ROLE IN DISTRIBUTION REFORMS

TRANSPARENT POLICIES & PROCEDURES  Well defined “Works & Procurement Policy and Procedures (WPP)”, for both pre-Award and post-Award activities, in place to facilitate quick decision making.  Well defined “Delegation of Power” in place to empower officers at various levels  Developed Systems & Procedure Manuals for most of the functional areas like Construction, O&M, Human Resource, Quality etc.  Committees of Independent eminent experts for advising POWERGRID on various issues like, Research & Development, Upgradation of ESPP document and environment compliance assessment, Telecom, Financial Management, etc.  Online Complaint Handling system on website.

 POWERGRID is the first PSU in Power Sector to develop “Environmental and Social Policy & Procedures (ESPP)” through public consultation with various stake holders.  Based on the principles of Avoidance, Minimization and Mitigation.  Widely appreciated by various funding agencies like The World Bank, ADB etc.  Total Forest involvement reduced from 6% to 2%  Implementation of projects without any rehabilitation and resettlement disputes.  In recognition to outstanding contribution, The World Bank awarded Green Award 2006 TOWARDS GREEN ENVIRONMENT

Delegation of Powers to Board of Directors as MINIRATNA PSU Investment approval  Investment approval of a project costing upto Rs. 500 Crore Formation of JVs & Subsidiaries  Equity investment in JVs and subsidiaries up to 15 % of Networth in one project limited to Rs. 500 Crore.  Overall ceiling of equity in all projects - 30% of Networth.

 Generation linked schemes : Barh, Sipat I, Kahalgaon II, PH I, Korba III, Farakka III, Kawas II, Gandhar II, Koldam, Subansiri, kameng, Parbati III, Chamera III, Rampur, Power Evacuation from Sikkim projects, Neyveli II, Kaiga 3 &4, RAPP 5&6, Kudamkulam APP, Kalpakkam, Ultra mega Projects etc.  Grid strengthening schemes: Strengthening schemes in Western, Eastern, Northern regions.  Inter –regional Schemes : To enhance the inter-regional capacity to about 40,000 MW.  National Load Dispatch Centre XI Plan – Major Projects

MANPOWER GROWTH Average Growth in manpower 1.4% p.a corresponding to about 50% growth p.a. in Asset base

Investment Approval by GoI  Appraisal by GoI if project cost > Rs. 500 Cr.  Prior approval under Sec. 68 of EA, 2003  Approval of FR/RCE from Management  Submission of FR cum DPR to MoP along with draft PIB note & checklist  Recommendation of Public Investment Board (PIB)  Approval by Cabinet Committee on Economic Affairs (CCEA)

Typical flow chart for approval of a project (Legend: AA-Appraising Agencies, MoP-Ministry of Power) POWERGRID to prepare FR and submit Draft PIB memo & DPR complete as per check list to MoP MoP to circulate DPR & draft PIB memo to Plang Commission/Concerned Min./ Appraising Agencies (AA) 4 Weeks Comments on Draft PIB memo by Planning Commission/AA Convening PIB meeting Preparation & Circulation of CCEA Note 2 Weeks Submission of proposal by MoP to Cabinet Secretariat for its consideration by CCEA 4 Weeks CCEA meeting and issue of minutes of CCEA Project Approved (24 weeks) 2 Weeks 5 Weeks 2 Weeks MoP to circulate final PIB memo after incorporating comments issued by Plan. Comm/ Concern Ministries/ (AA) Comments on draft CCEA Note by different Ministries/ Departments with approval of concerned Minister 3 Weeks Issuing Minutes of PIB meting Zero Date

DIVERSIFICATION IN TELECOM  Total Network Planned – 20,000 KM. covering 60 cities  Project cost: Rs. 1,000 Crore  Most of the planned Telecom Network already installed; connectivity provided to all metros, major cities & towns including NE and J&K  POWERGRID is one of the few telecom players with a marked presence in remote areas of the country.  Providing bandwidth capacity to major telecom players.

Laurels  Since , continuously rated “Excellent” for performance against Memorandum of Understanding (MoU) with MoP  “MoU Excellence Award” for 6 FYs:  , , , , and  “Scope Award for Excellence and Outstanding Contribution to the Public Sector Management” conferred on Dr. R. P. Singh, CMD, POWERGRID for the year  “National Awards for Meritorious Performance” in construction and operation during & (4 Gold shields and a silver shield ). PERFORMANCE DURING FY

Corporate Planning Roles and Responsibilities  Single window co-ordination with external agencies  Preparation of the Strategic Plan for the Company  Funds tie-up from Multi Lateral Funding agencies (WB,ADB, JBIC etc.)  Co-ordination with Finance/ Engg./ Contracts departments for proper resource allocation to various projects  Ensure expeditious investment approval from appropriate authority

Human Resource Development  Emphasis on integrated development of employees  Suitable budget allocation since we treat training as an investment – at least 1.5% of salary budget; can go upto 5%  Competency mapping at Sr. levels – right person at the right job – Capitalise on individual strengths and development of teams  An annual asset growth rate of about 50% has been achieved against a meager manpower growth of 1.4% per annum.

 Evolved most effective Disaster Management System to minimize the impact of natural calamities like floods, cyclones, Earthquake etc.  Quick restoration of power supply through Emergency Restoration System  Gujarat cyclone in 1998, restored within a week  Orissa Cyclone in October, 1999, restored within 11 days  Gujarat earthquake in January, 2001  Restored power supply within one week  Reconstructed 10 damaged Sub-stations within a record time of 3 months, dedicated to the Nation by the Hon’ble Prime Minister  Restoration work in Andaman after Tsunami  Tower collapse in Delhi & Karnataka  Employees contribution during Earthquake in Kashmir POWERGRIDS RESPONSE TO SOCIAL CAUSES

No Yes RCE APPROVAL OF REVISED COST ESTIMATE First RCE, Variation entirely due to change in allowable fiscal factors within PTC Variation upto 10% after excluding allowable fiscal factor within PTC Variation from 10-20%after excluding allowable fiscal factor within PTC <5% of the latest approved cost excluding fiscal factor within PTC >5% of the latest approved cost excluding fiscal factor within PTC Variation>20%after excluding allowable fiscal factor within PTC Shall be approved by MP in consultation with PC Shall be appraised by PC and approval by MP & FM Shall be appraised by PIB & approval by CCEA Shall be appraised by PC and approved by MP Shall be appraised by PIB & approval by CCEA Cost  Rs. 500 Cr COD on RCEs Yes No BoD – Board of Directors, COD – Committee of Directors, PC - Planning Commission, PTC – Project Time Cycle, MP – Minister of Power, FM – Minister of Finance, PIB – Public Investment Board CCEA – Cabinet Committee on Economic Affairs, Approval by BoD

TRANSPARENT POLICIES & PROCEDURES Benefits:  Effective & efficient systems & procedures in place  Facilitating quick and effective decision making through empowerment  Commissioning of projects within schedule or ahead of schedule  Minimal Contractual disputes  Efficient dealing of statutory requirements like environment issues, audit issues etc.  Minimizing adverse comments from external auditing agencies.  Minimising public contact.  Increasing confidence of stake holders.