4.10.20151 General Info and Procurements Výroční schůzka v TIC Praha, 07.září 2010 Podklad Contract and Procurement Group.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Fusion Power Associates Meeting, 5 December 2012 Slide 1/16 ITER Achieve 500 MW of fusion power. Demonstrate the scientific and technological feasibility.
Everyone can access. Contents Mer-links context The route of decision-making What is Mer-link? Lessons Learned.
Mozal Linkages Program (IFC PEP Africa). PEP Africa Pipeline in Mozambique  Mozlink II  Tourism Anchor Project  SME EDI  IFC Against AIDS.
Office of Central Integration and Engineering
July 28, 2011 ITER Thomas J. Vanek Senior Policy Advisor Fusion Energy Sciences.
Development of Ventspils District Heating System in Latvia 2005/LV/16/C/PE/001.
SB 854 – Public Works Contractor Registration Program
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
EPICS Collaboration Meeting – Aix-en-Provence June 2010 Page 1 ITER welcomes EPICS WD Klotz ITER int. Organiztion That’s me.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
PROCEDURES FOR SELECTING THE CONTRACTOR
Page 1 Assembly and Installation Information Day – 21 st May 2015 © 2015, ITER Organization ITER_D_RDUX69Page 1 Tender Processes and Rules Françoise Flament.
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
ITER International Team 16th ANS Topical Meeting on Fusion Technology
The Lean Sourcing Process
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
E-Procurement Experience in Korea : Implementation and Impact June 2012 Ho In Kang | Administrator Public Procurement Service (PPS), the Republic of Korea.
Page 1 Electrical Supply Contract Information Day – 16 th July 2015 © 2015, ITER Organization IDM UID: iTER_D_R6QAFK Page 1 Tender Processes and Rules.
Norbert Holtkamp, October Status of the ITER Project Norbert Holtkamp Status of the ITER Project Norbert Holtkamp Principal Deputy Director General.
General Overview of the Korean Domestic Agency Procurement Activities K. J. Jung ITER Korea (KODA) National Fusion Research Institute.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
ILO Meeting #26 Ongoing and forthcoming Procurement activities 29 th September San Sebastian F4E Market Intelligence group - ILO Meeting #26 – 29th.
30 June 2010 THE ODYSSEY OF GREEK PUBLIC FINANCE STATISTICS a serious communication issue Tim Allen, Head of Press Office, Eurostat.
Hutch Neilson Princeton Plasma Physics Laboratory K-DEMO Project Meeting 26 June 2013 NFRI-PPPL K-DEMO Project Status and Plans Overview.
1 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 International Co-operation FP7 Energy Theme Energy EU-Russia Call European.
The State Procurement Agency of the Republic of Azerbaijan Welcomes the participants of the 9 th Public Procurement Exchange Platform “Efficient Implementation.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
Page 1J. Hourtoule, Electricity contract: scope and forecasted consumption, 16/07/2015 © ITER Organization Electricity Supply Contract: For the ITER Site.
Slide 1 Children & Young People’s Services Change in Children & Young People’s Services Integrated Family Support Market event 7 November 2012 “Bristol's.
Click to edit Master title Open Water Transition by Workstream OWML Board Paper June 2015.
MICE Collaboration meeting (CM20) At RAL 10 – 13 Feb 2008 AFC Magnet – Status and Progress W. Lau, Oxford University.
Safety Stand Down – Together We Will Make the Difference.
May, 2011 Shinji Kakuno Agency for Natural Resources and Energy METI, Japan Report on APEC Low-Carbon Model Town Task Force.
Future Qualification and Skills Needs in the Construction Sector European Builders Confederation 2008 Knud Erik Hilding-Hamann Danish Technological Institute.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Ensuring Good Quality PPP Projects Martin Darcy United Kingdom.
M. Gilchriese Overview of Production Plan for Pixel Global Support and Disk Support Rings M. G. D. Gilchriese Lawrence Berkeley National Laboratory February.
Norbert Holtkamp, October The Engineering Challenges of ITER The Engineering Challenges of ITER Norbert Holtkamp PDDG Nominee October 16th, 2006.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
EIROforumSchool on Instrumentation A. Murari May 2013, CERN. JET: the European Fusion Device Andrea Murari EFDA-JET Close Support Unit EIRO School.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Charles C. Baker Deputy US ITER Planning Officer presented at the Fusion Power Associates Annual Meeting and Symposium Washington, DC November, 2003.
HNSciCloud Pre-Commercial Procurement Project Procurement Framework and Schedule Dante Gregorio CERN 26 January
© The Concept Factory © Science Link | 2© Science Link 2013  Three calls during Results:  66 applications, companies from 8 countries.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
1 Preparation and Positioning of Korea for the ITER Project 2004 KSTAR US-Korea Workshop May 19-20, General Atomics.
INTER-AMERICAN DEVELOPMENT BANK Business Opportunities IDB Financing in Latin America and The Caribbean May 2016.
Electronic PROCUREMENT IN MONGOLIA Gantsogt Khurelbaatar Ministry of Finance.
Southeast strategic regional coastal monitoring programme Strategic Regional Coastal Monitoring Programme Procurement & Contract Management.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
St. Lawrence Fluorspar Project St
CSP 25th November 2010 Technical agreement number 3: overview
“Everyone can access”.
PUBLIC PROCUREMENT SYSTEM IN UZBEKISTAN
The Lean Sourcing Process
Steps during and after a Pre-commercial Procurement
Status of DS Procurement
The Engineering Challenges of ITER Norbert Holtkamp PDDG Nominee October 16th, 2006 Norbert Holtkamp, October 2006.
Fusion for Energy & ITER Contribution to EU Added Value
Steps during and after a Pre-commercial Procurement
United Nations Procurement Division
A High Intensity Neutrino Oscillation Facility in Europe
Candidate Registration & Induction
Presentation transcript:

General Info and Procurements Výroční schůzka v TIC Praha, 07.září 2010 Podklad Contract and Procurement Group

General News  ITER Council: the IC approved the replacement of Kaname Ikeda by Osamu Motojima An extraordinary IC is planned end of July for baseline approval  New baseline: the November 2019 scenario (for the first plasma) has been accepted by the Governing Board in January.  F4E with all DAs: Contracts & Procurement headed a visit to JAEA/JA-DA. One outcome of the meeting was the agreement to study the opportunity of 2 Joint procurements (TFC RP, Cold Test & Insertion) 1 st Industry Working Group IO + all DAs was done

F4E news 1/2  Budget: a pluri-annual financing will be defined and presented to next F4E GB  F4E website: mock-up tested. Migration of data on-going.  Industrial Portal: 450 legal entities registered  2010 Human Resources: +200 people now work at F4E (Barcelona + Cadarache + Garshing); an increase of human resources is expected by end 2010 to face the ramp-up of activities.  Competed ITAs: calls for expressions of interest now published as well on the Industry Portal.

F4E news 2/2  Participation of companies: still rather satisfying. F4E does not have problems to find qualified tenderers (cf. contractual conditions improvements).  F4E next CFTs visibility: new list of calls updated on the portal June 25 th.  Industrial Policy: more measures for SMEs. Document to request % dedicated to SMEs in F4E contracts is under legal investigation.  Subcontracting: F4E published on its portal the name of bidding companies on the VV.

Site and building  1 st Phase is now over (AE, Health & Safety, Support to the owner, Tokamak excavation, Anti seismic pads etc..)  2 nd Phase covering main constructions topics starts now: Information meeting will be organized Q in Cadarache

Signed contracts  Plasma System - Heating Current Drive Group Neutral Beam Supply of Ion Source and Extraction Power Supplies EC UL Concept Testing at Low and High Power of a Window for the EC Upper Launcher EC PS Supply of Mirrors for the RFCU  Machine Systems - Magnet Group Conductor Testing in SULTAN 2010  Machine Systems - In Vessel Group Blanket Thermo-mechanical analyses of NHF FW

Contracts approved  Significant contracts have been approved by the Ex-co 21st June and are planned to be awarded shortly then signed: TF Coil winding Packs Cabling and Jacketing Support to the owner Anti Seismic Bearings Divertor RH design updates and DTP2 testing

Contract figures  Signed so far in 2010: around 200 M€  Approved at June ExCo/GB: around 240 M€  To be awarded by fall 2010: around 400 M€ TOTAL > 840 M€ signed by end 2010

Conclusion GB has approved award of the TF WP contract, a key milestone in procurement activity Buildings and linked contracts (ex A.E.) have been signed or awarded on time in order to meet schedule. Other big contracts handled in line with schedule (ex. winding pack) provided validation is on time. F4E presents contracts for signature on time. The agency has proven its efficiency despite many difficulties. European industry is showing willingness and capability to handle the project. Now we need to manage cost containment.