A Quick Guide Total Cost of Ownership calculator tool (ver. 1.1)

Slides:



Advertisements
Similar presentations
1 Conservation Program Cost-Effectiveness Tests Presentation to the: Florida Public Service Commission Workshop on Energy Efficiency Initiatives November.
Advertisements

QUALITY AND TECHNOLOGY
Will CO2 Change What We Do?
Energy Alternatives (A) Diesel (B) Combined Diesel/Hydro Dam (C) Medium Hydro Dam (D) Large Hydro Dam.
26-1 C APITAL B UDGETING LONG-RANGE PLANNING CHAPTER 26.
Capital Investment Decisions
Platinum Energy, Inc. Slide No. 1 PROJECT EVALUATION Joseph A. Orlando, Ph.D, PE Platinum Energy, Inc. Springfield, Virginia
11-1 Typical Capital Budgeting Decisions Plant expansion Equipment selection Equipment replacement Lease or buy Cost reduction.
By: R.M. Chitranshi. ECBC With the background of high energy saving potential and its benefits bridging the gap between demand and supply, reducing environmental.
Energy Efficient LED Lights Mohammad Alhasawi Managing Director and partner Green Tech Solutions co w.l.l. 1.
Electrical Engineering Department, Amirkabir University of Technology, Tehran, Iran M. Poursistani N. Hajilu G. B. Gharehpetian M. Shafiei CHP Systems.
City of Boulder Meeting Kyoto -- Carbon Emissions Reduction: Commercial Lighting.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
4. Project Investment Decision-Making
Short Summary from second Meeting of the Ecodesign CF Subgroup on Large Power Transformers Brussels Distribution Transformers (medium PT) Power.
EML EML Engineering Design Methods Engineering-Economics Introduction Economic Decision Rules Hyman: Chapter 8.
Energy, Society, and the Environment Unit 3 Energy Economics.
1 BREAKEVEN ANALYSIS Introduction Introduction What is Break-even Analysis? What is Break-even Analysis? Break-even in comparing alternative propositions.
Energy Saving Opportunities for Transformers Hans De Keulenaer Outokumpu Tara Mines Energy Efficient Motors & Transformers Workshop May 7, 2002.
Sustainability is Good for Business PURCHASING. Introduction –Our customers are looking for accommodation that is working to improve its sustainability.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
Value and Cost of Distributed Generation ACC Staff Workshop #1 – May 7, 2014 Docket No. E-00000J DG Valuation ─ Lessons from the APS Distributed.
Commercializing environmental innovative products Environmental alternative Energy technology Reduced energy consumption technology (Tribology) What does.
CTC 475 Review  Course Requirements  Applications  Multiple Decision Criteria  Selling The Project  PSP.
ACCTG101 Revision MODULES 10 & 11 TIME VALUE OF MONEY & CAPITAL INVESTMENT.
Smart Buildings Srirangarajan Kadaba National Manager – Energy Edge Buildings Business Schneider Electric 21June 2010.
Juan Carlos Alonso Eco-Innovation - SIMPPLE - Spain 8th European Forum on Eco-Innovation, Bilbao, Spain April 2010 Making Eco-Innovation happen in.
STST Copyright (c) 2007 by Surya Technologies 1 Supply Chain Environmental Analysis Tool: SEAT TM Kumar Venkat Surya Technologies
B BASF Eco-Efficiency C. Wall BASF Corporation HELPING MAKE PRODUCTS BETTER TM 1 Eco-efficiency: Inside BASF and Beyond… Charlene Wall, BASF Corporation,
AT Benefit Cost Analysis Model Highway Design, Project Management and Training Section Technical Standards Branch Presented by Bill Kenny, Director: Design,
Northwest Power and Conservation Council The Northwest Energy Efficiency Market 2007 NAESCO Northwest Regional Meeting June 15, 2007 Tom Eckman Northwest.
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Only for internal use / © Siemens AG All rights reserved. Industry Sector Central worldwide Messages for energy efficiency, for customers, analysts,
Problem Statement Due to a rough history with the local power company, San Pablo has resorted to using power from the power company without paying their.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions’ reduction George Mavrotas.
Saving Energy and Improving Light Quality in Street Lighting P K Mukherjee Amit Khare CLASP Applications of the SEAD Street Lighting Tool Clean Energy.
Smartcool Systems Inc. Providing effective and reliable energy efficiency solutions for HVAC-R customers around the globe.
ClickSuper Guide for funds using the ClickSuper eRollover calculator.
1 Power Consumption in the Datacenter Computer Rm. AC 34% Server/Storage 50% Conversion 7% Network 7% Lighting 2% Source: APC Where Does the Power Go?
Pico-solar lights: Exposure, uptake and impact Elly White, M&E Coordinator.
Energy Conservation Physics /24/03. Reducing energy consumption may help alleviate environmental problems: Conserve fossil fuel resources Reduce.
Introduction to Economic Analysis Part 2 February 12, 2014.
Life-cycle cost analysis (LCCA)
Net Present Value and Other Investment Criteria By : Else Fernanda, SE.Ak., M.Sc. ICFI.
Eric Hittinger, Rochester Institute of Technology 1 STORE OR SELL? THE EMISSIONS AND ECONOMIC EFFECTS OF TAKING ROOFTOP SOLAR OFF-GRID.
Cost-Effectiveness Evaluation Calculator Walkthrough Energy and Environmental Economics, Inc. April 8, 2005.
Mindcraft is a registered trademark of Mindcraft, Inc. October 26, 1998Copyright 1998 Mindcraft, Inc. A Strategy for Buying Directory Servers Bruce Weiner.
1 Energy-efficient distribution transformers Case study.
CALCULATING PAYBACK PERIOD. Formula Payback Period = Initial Investment Net annual savings + Income.
Draft for discussions GT and/or HE Furnace - Energy use - Energy efficiency - Environmental issues - Markets - Cost - Scenarios - Scenarios bonus.
Amanda D. Kimball Brennan Johnson Andrew Bennett Timothy Hardy Engineering Science Research Building.
FACILITIES PLANNING ISE310L SESSION 13 Chapter 14, February 19, 2016 Geza P. Bottlik Page 1 OUTLINE Questions? Quiz Stories or experiences? New Homework.
Accounting Rate of Return mefielding.com1. Definition  Accounting rate of return (also known as simple rate of return) is the ratio of estimated accounting.
World Energy and Environmental Outlook to 2030
Power Factor Correction The Definitive power solution
Power Factor Correction The Definitive power solution
James L. Plummer, President, Climate Economics Foundation
PowerDsine 5524 Available now
Calculating Payback Period
VMware TCO / ROI Calculator
Manage costs and schedules for system replacement due to obsolescence
© 2018 Global Market Insights, Inc. USA. All Rights Reserved Structural Steel Market Research Analysis and Trends Report for
Economics of Energy Efficient Lighting Outdoor
Economics of Energy Efficient Lighting
❶ Start by selecting the MEPS – area where the motor will be placed
Modular Edge-connected data centers
Anna Garcia Air Innovations Conference August 2004
OUTLINE Questions, Comments? News? New homework Evaluating suppliers
Modular Edge-connected data centers
Modular Edge-connected data centers
Presentation transcript:

A Quick Guide Total Cost of Ownership calculator tool (ver. 1.1) 4/22/2017 ABB Transformers, 2015 A Quick Guide Total Cost of Ownership calculator tool (ver. 1.1)

TCO Tool / A Quick Guide 4/22/2017 © ABB Group February 6, 2015 | Slide 2

TCO Tool / A Quick Guide Pre-word 1 4/22/2017 Background of TCO and TCO tool The use of Total Cost of Ownership –method (also known as Total Ownership Cost –method) allows manufacturers to tailor the design to the unique economic situation of each transformer user, and allows the user to evaluate multiple designs in order to find out the optimal solution for his need The easy-to-use ABB Transformer TCO Tool supports customers to determine, based on their own situation and future scenario, the right loss capitalisation values to be used in their inquiry to be passed to the manufacturers The tool also helps in comparing different alternative transformer offers, calculates the monetary savings and evaluates the environmental impact and therefore supports the related decision making and increases the awareness Current version 1.1. supports in addition to English language also Chinese, German, French and Spanish languages © ABB Group February 6, 2015 | Slide 3

TCO Tool / A Quick Guide Pre-word 2 4/22/2017 TCO tool is an universal easy-to-use tool for Determining the transformer loss capitalization values (”A” and ”B” factors) Comparing transformers with different first cost and loss values from the following aspects Total cost of ownership with payback time on marginal cost Consumption of energy CO2 emission impact (in kg of CO2) with analogue to the number of trees needed to compensate the extra emissions caused by the trafo with lower efficiency Calculation formulas are based on IEC 60076-20 (current draft) on applicable parts (the results are fully applicable with ”IEEE” transformers as well) © ABB Group February 6, 2015 | Slide 4

TCO Tool / A Quick Guide Interface / inputs 1 4/22/2017 i-buttons for help © ABB Group February 6, 2015 | Slide 5

TCO Tool / A Quick Guide Interface / inputs 2 4/22/2017 i-buttons for help © ABB Group February 6, 2015 | Slide 6

TCO Tool / A Quick Guide Interface / comparison and results 4/22/2017 Peak efficiency index (IEC) is the highest efficiency that the transformer can reach at an optima loading point. It is calculated based on the IEC definition of efficiency. Total cost of ownership is the sum of the initial purchase cost and the net present value of the cost of losses during the lifetime. In this calculation, differences in other lifecycle cost components such as installation, maintenance, possible out-time and decommission costs are not included. Total lifetime savings during the lifetime of the transformer in selected currency when comparing the “Lowest total cost” and the transformer x. Payback time in years for the marginal investment on the higher efficiency when comparing the “Lowest total cost” and the transformer x. Simple payback calculation method. Energy savings per year and total – The amount of energy saved when selecting the “Lowest total cost” instead of transformer x. CO2 emission reduction per year – The amount of CO2 emission avoided in tons when selecting the “Lowest total cost” instead of transformer x. Calculated using the global average CO2 emission of 489 g per kWh generated. CO2 absorption capability of trees – The number of trees needed to offset the higher CO2 emissions caused by a transformer with lower efficiency based on the average annual absorption capability of 22 kg of CO2 by a single tree. © ABB Group February 6, 2015 | Slide 7

TCO Tool / A Quick Guide TCO Tool / interface / basic reporting (pdf print) 4/22/2017 © ABB Group February 6, 2015 | Slide 8

TCO Tool / A Quick Guide Notes and remarks 4/22/2017 Cooling losses Cooling losses of a transformer equal the power consumption of the cooling equipment of the transformer. In case of cooling with natural oil and air flow (ONAN), the cooling losses are zero due to the fact that no additional power for pumps or fans is needed With transformers with forced oil flow (OFAF, ODAF or OFWF) the pumps for oil are usually energised at no load condition of the unit. Therefore, for a typical case the cooling losses at no load ( 𝑃 𝐶0 ) for those transformers equal the power consumption of the oil pumps © ABB Group February 6, 2015 | Slide 9

4/22/2017 © ABB Group February 6, 2015 | Slide 2