Transparency of the CDM Communication with Project Participants and Stakeholders 1 Andrei Marcu Head of Policy and Regulatory Affairs.

Slides:



Advertisements
Similar presentations
The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
Advertisements

Key provisions and institutional arrangements of the CDM Christine Zumkeller UNFCCC/Cooperative Mechanisms
BASELINE STANDARD UNFCCC secretariat workshop
T HE W ORLD B ANK C ARBON F INANCE U NIT UNFCCC W ORKSHOP : S TANDARDS FOR BASELINE SCENARIO IDENTIFICATION AND BASELINE EMISSION CALCULATIONS M ARCH 2011.
Transparency and promotion of the CDM
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
The CDM Policy Dialogue Margaret Mukahanana-Sangarwe Member, High-level Panel on the CDM Policy Dialogue FIRST SDM JOINT COORDINATION WORKSHOP Bonn, Germany,
UNFCCC secretariat, Sustainable Development Mechanisms Programme Conor BARRY Improving and demonstrating efficiency in CDM processes 7 th Joint Coordination.
UNFCCC secretariat Enhanced Interactions and Direct Communication – Policy matters First SDM Joint Coordination Workshop Bonn, Germany, March 2012.
CDM Regional Distribution Ensuring Broader Participation in the CDM Presented by: Albert Altarejos MAGALANG DNA Forum Chairing Committee.
Wrap-up session 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn Germany, March 2012.
Enhancing Interaction between the DNA Forum and the Executive Board Presented by: Albert Altarejos MAGALANG DNA Forum Chairing Committee.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Modalities and procedures for direct communication with stakeholders 3/CMP 6, para. 21,
T HE W ORLD B ANK C ARBON F INANCE U NIT Standardised Baselines Framework March 24-25, Bonn.
Regulators’ Code July Regulators’ Code A statutory Code Came into effect in April 2014, replacing the Regulators’ Compliance Code All local authorities.
Service Learning Joe Bandy Center for Teaching Vanderbilt University.
Student Integrity and Misconduct Training and support for decision makers and Academic Integrity Officers.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
Chapter 10 Teaching and Learning Strategies
Project Monitoring Evaluation and Assessment
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
Frequently Asked Questions (FAQ) prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9.
Reporting on SD co-benefits using the new CDFM SD Tool and opportunities for monitoring to enhance the profile of CDM projects and CER price: what the.
ACTIVITIES UNDERTAKEN IN ADVANCING THE WORK ON “GOOD AND BEST PRACTICES” IN POLICIES AND MEASURES AMONG PARTIES INCLUDED IN ANNEX I TO THE CONVENTION Katia.
Learning from the CDM First UNFCCC workshop on Article 6 projects under the Kyoto Protocol May 2004 Moscow, Russian Federation John Shaibu KILANI.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Standards experts. Accreditation solutions. Andrea Spencer Coordinator, WTO/NAFTA Enquiry Point (Canada) TBT Special Meeting on Procedures for Information.
1 Public Outreach October 2008 By Adelina Murtezaj – Public Relation Officer For Inaugural Partnership Activity between ICC and ERO.
Designing Public Participation in Environmental Impact Assessment Presentation & Exercise.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
Training Workshop on the use of the CRF Reporter for European Community Experts Introduction Copenhagen – 12 September 2005 James Grabert Inventories sub-programme.
Energy Regulatory Partnership Program of the National Association of Regulatory Utility Commissioners with the National Commission Exercising State Regulation.
VCOSS Forum: Homelessness and human rights in Victoria HRBA: Achieving organisational change Tuesday 16 th November 2010.
Citizens Redistricting Commission Civic Engagement Proposal February 11, 2011 Center for Collaborative Policy, California State University, Sacramento.
Registrant Engagement Through CPD Aoife Sweeney, Head of Education, CORU - Health and Social Care Professionals Council, Ireland.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
Espoo Convention on Environmental Impact Assessment in a Transboundary Context Workshop on “Making Aarhus work in international forums” Geneva, 23 February.
COMPLIANCE. Importance Environmental integrity Credibility of the carbon market Transparency in actions of Parties.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
Strengthening Science Supporting Fishery Management  Standards for Best Available Science  Implementation of OMB’s Peer Review Bulletin  Separation.
Roundtable on Validation and Verification Issues in LULUCF Projects The World Bank, Washington DC August 24-25, 2009 Issues in Validation of A/R Projects.
UNFCCC Secretariat Utilizing the existing CDM institutional arrangements for NAMAs Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
The Commission's Impact Assessment system 18 September 2014 María Dolores Montesinos Impact Assessment unit Secretariat General 1.
First UNFCCC Workshop on the implementation of JI projects under Article 6 of the Kyoto Protocol Moscow, May, 2004 Proposal on procedures of registration.
Module Calibration regarding accreditation assessment requirements Calibration through enhanced CDM-AP direct communication with stakeholders (DOEs/ATs)
Catalogue of decisions CDM Executive Board EB September 2006.
Conclusions Buenos Aires, – December 5 th, 2004 CDM Methodologies and Project Design Workshop for CDM Project Developers.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
Introduction of information note Compilation and analysis of available information on the scope, effectiveness and functioning of the flexibility mechanisms.
Change Management CAMP JUNE 11, Change Management – why?  Why is it necessary?  Why is it important?  Proactive  Cost effective  Transparent.
DEVELOPING THE WORK PLAN
Steps for Submission of New Baseline Methodologies National Workshop on Baseline Methodologies CD4CDM Project (Phase II) 31 March – 1 April 2004 Sami Mostafa.
CDM: ISSUES FOR CMP 2 AND THEIR IMPLICATIONS TO LDCS Presentation made to the LDC Negotiators Workshop, Nairobi, 3 November, 2006 Richard Muyungi United.
Activities on regional distribution of Clean Development Mechanism (CDM) Projects With reference to LDCs.
REDD+ negotiations and key milestones from Cancun to Durban Geneva, 9 May 2011 Clea Paz-Rivera, UN-REDD Secretariat.
Community Development Department May 2, 2016 NEW CPAC MEMBERS TRAINING WELCOME.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
UNFCCC secretariat, SDM Rocío N. Correia, Associate Programme Officer Efforts undertaken to deliver the expected work Singapore, 28. October 2010.
Engaging the Private Sector through Transparency, Public Consultations, and Advisory Committees 1 Bryan O’Byrne August 2014.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
Cluster Host Preparation Meeting Autumn Term 1a Overview and Action Planning Judith Carter Senior Adviser Complex Needs/Vulnerable Learners
Stakeholders engagement in the climate negotiations Challenges and opportunities Sebastien Duyck, University of Lapland,
Clean Development Mechanism
THE 22ND SESSION OF THE CONFERENCE OF PARTIES TO THE UNFCCC (COP 22), AND THE 12TH SESSION OF THE CONFERENCE OF THE PARTIES SERVING AS THE MEETING OF.
The view from the ‘regulator’
Species at Risk (SAR) Legislation & Program Renewal Project
Q&A sessions at UNFCCC SB26
OECD good practices for setting up an RIA system Regional Capacity-Building Seminar on Regulatory Impact Assessment Istanbul, Turkey 20 November 2007.
Presentation transcript:

Transparency of the CDM Communication with Project Participants and Stakeholders 1 Andrei Marcu Head of Policy and Regulatory Affairs

Why Communication is Important CDM is a successful but complex system Totally regulatory system –Impact of regulator and regulatory system magnified –Impacts individual projects but also D/S balance For CDM to be successful –Environmental integrity –Transparency –Cost effectiveness 2

Communication Should be: Increase efficiency On the record Objective Transparent Part of the process A right and an obligation [for the regulator] Ensure that the regulatory objectives are achieved at a lower cost/effort Should not: Add new layers of complexity to the CDM process Provide opportunity to gridlock the system 3

History Better communication recognized historically as critical by stakeholders –Project developers –DOEs –DNAs –Environmental community –Etc Areas of communication identified –Website –Reasons for decision –Status of projects –Project assessment – submission and decision making –Etc 4

History Direct communication recognized by the CMP in Copenhagen and Cancun CMP 5 referred to “ direct communication between PP and EB o project related matters” CMP 6 broadened and referred to in 3 area –Para 21 “to PP and stakeholders, including…” –Para 18 “Appeals process” –Para 59 – “Completeness check” 5

Communication with the UNFCCC Process SBI request for “ways to enhance the engagement with Observer organizations Article 1.b.vii of Bali Action Plan ICC submission –Improving engagement with Observer organizations on policy matters –Creation of Business Consultative Mechanism (BCM) Not an actor in UNFCCC negotiating process – “seat at the table” Recognized by the UNFCCC process as a chanel for interaction for policy related matters Organized and funded by business in a transparent way with good governance Present views and organize input - Clearinghouse Draw from all business stakeholders Multiple windows – CDM policy window being one 6

Direct Communications Two types of interaction needs to be recognized –Policy/general guidance matters –Project specific, part of the CDM project cycle Purpose –To identify/draw attention to issues –For decision making/assesment Group –Open interaction available to all –Pre selection based on submissions Interaction –EB. Interaction with EB at the request of the EB –UNFCCC Secretariat. Most of the interaction will be UNFCCC staff to clarify matters, get information, etc –Its bodies 7

Direct Communications Trigger –Mandatory. There could be places were the regulator has to initiate (e.g. when there is a request for review) –Discretionary. Where there regulator perceives a net benefit from initiating a direct interaction (e.g. completeness check), or where is it seen as solving problems (e.g. EB decisions on Issuance where EB can request presence and discussion with PP and/or DOE) Contribution –In preparation for the meeting – consultation on agenda, speakers, etc –During the meeting 8

Policy/Guidance Interaction –Unsolicited communication Should be used to draw attention to matters of importance Reply/outcome within max 30 days –Request for written input Should result in decision/outcome Reasons for decision to accompany with reference to input provided Outcome within clear timeline Could be open or pre selection –Direct interaction such as workshop, hearing Based on pre-selection Outcome within clear timeline Reasons for decision tied to content of workshop/hearing 9

Project Related Interaction Should not add new steps in the CDM project cycle Same interlocutors as in the current project cycle, depending on the step – PP, DOEs Flexibility on new material to be introduced Available to the regulator at points of assessment –Registration –Issuance –Renewal of crediting period –Methodology work stream Must be part of the project record on the UFCCC web site, except commercial confidential information Requires assignment of UNFCCC staff to projects – “who handles this file”. Why ‘anonymity” in CDM process ? Digitize the project cycle process 10

Project Related Interaction Modalities –Written communication Letter –Phone call/conference call Plus: easy, low costs Minus: more difficult for complex issues that require in depth discussions –In person meeting Plus: can solve problems that require in depth, very substantive discussions Minus: more time to schedule, additional costs involved for attendees. Could be offered as an option to PP 11

MERCURIA ENERGY TRADING SA 50 RUE DU RHÔNE, 1204 GENEVA, SWITZERLAND T