1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University.

Slides:



Advertisements
Similar presentations
1 of 21 Information Strategy Developing an Information Strategy © FAO 2005 IMARK Investing in Information for Development Information Strategy Developing.
Advertisements

FACTORS AFFECTING CONSTRUCTION COSTS IN SAUDI ARABIA By Yaser Abdulla Al-Juwairah Presented by Shaikh Imran Abdul Qayyum Gani.
SEMINAR ON “NSC RECOMMENDATIONS ON CONTRCTUAL MINING” ON DATED 3 rd November, 2012 ORGANISED BY KUTCH LOCAL CENTRE OF MEAI, AHMEDABAD CHAPTER.
Split Questionnaire Designs for Consumer Expenditure Survey Trivellore Raghunathan (Raghu) University of Michigan BLS Workshop December 8-9, 2010.
Summary of “Factors Affecting Construction Practices in Makkah, Saudi Arabia” Written by: Sami Barhamain October 1986 (CEM 520) Presented by: Ehab A. Qahwash.
Joint Ventures in Construction Firms in Saudi Arabia By Kamal Khalil Khairaddin Abbasi A thesis paper summary Summarized by Mahdi Fida Al-Adel.
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS DHAHRAN, SAUDI ARABIA Construction Engineering & Management CEM-520 CHANGE ORDERS IN CONSTRUCTION PROJECTS.
Presentation for Thesis of Master Degree Done by Ali Abdullah Al Salman CEM – 520 Term Project (Paper Presentation) Assessments of Risk Management Perception&
Factors Governing Housing Construction Costs in Saudi Arabia Abdelrahman Al-Gwaiz Kamal Al Dihan Faisal Al Ankary.
KING FAHD UNIVERSITY OF PETROLEUM AND MINERALS COLLEGE OF ENVIRONMENTAL DESIGN Dhahran, Saudi Arabia THERMAL AND ECONOMIC PERFORMANCE OF INSULATION FOR.
Learning Objectives 1 Copyright © 2002 South-Western/Thomson Learning Qualitative Research CHAPTER five.
A Fuzzy-Based Assessment Model for Faculty Performance Evaluation Mohammed Onimisi Yahaya College of Computer Sciences and Engineering King Fahd University.
King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management CEM Instructor: Dr. Soliman Al-Mohawis Important.
© 2004 Prentice-Hall, Inc.Chap 1-1 Basic Business Statistics (9 th Edition) Chapter 1 Introduction and Data Collection.
By Dr. Sadi A. Assaf, Dr. Abdul Mohsin Al-Hammad, Dr. M. Osama Jannadi, Mr. Sami Abu Saad By Dr. Sadi A. Assaf, Dr. Abdul Mohsin Al-Hammad, Dr. M. Osama.
Overhead Costs in Building Construction in Saudi Arabia Mohammad Al-Shahri Ahmed Al-Ojairi.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
1 FACTORS AFFECTING FACILITY MAINTENANCE MANAGEMENT AUDTING IN SAUDI ARABIA BY Al-Hammad,A. and AL-Zahrani A., College of Environmental Design, King Fahd.
Quality Function Deployment for Curriculum Design: A Framework
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS DHAHRAN SAUDI ARABIA DEPARTMENT OF ARCHITECTURAL ENGINEERING ARE 520: Advanced Construction and Maintenance.
Priority-rating of Public Building Maintenance Work By Mohammad AL-Majed Abdul-Mohsen AL-Hammad Saleh Daffuaa King Fahd University of Petroleum and Minerals.
TOOL TO DESIGN FOR CONSTRUCTION WORKER SAFETY An Article Written by Gambatese, Hinze and Haas 1997.
OAG Office of the Auditor-General Promoting Accountability in the Public Sector Using Audit to Oversee Public Procurement Edward Ouko Auditor-General Kenya.
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
Cost Implications of Architectural Design Variables Ahmed S. Al Zahrani December 2005 King Fahd University of Petroleum & Minerals Department of Construction.
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS COLLEDGE OF GRADUATE STUDIES CONSTRUCTION ENGINEERING AND MANAGEMENT For Dr. Sadi A. Assaf A Conceptual Model.
Abdallah M. Al-Mahasheer
CORRELATIO NAL RESEARCH METHOD. The researcher wanted to determine if there is a significant relationship between the nursing personnel characteristics.
Customer Survey Van Bennekom Book. Introduction Surveying has become a commonplace tool on the business landscape due to the drive of the quality management.
Falah-ud-Din Butt, Dr. Niaz Ahmed Bhutto & Ghulam Abbas
ADVANCED RESEARCH METHODS. I.The methodology of survey research Descriptive research, also known as statistical research, describes data and characteristics.
1 Construction Claims in Residential Houses in Saudi Arabia Presented by Adel Al Rabee.
ولقد خلقنا السماوات والأرض وما بينهما في ستة أيام وما مسنا من لغوب (سورة ق )
CEM 520: Construction Contracting and Administration 03 June 2007
Business and Management Research
4/21/2017 Evaluation Of Performance Measures For Materials Management Process In Industrial Construction Projects Term Project for CEM 520 Instructor:
Contractor Management
Knowledge Management Systems: Emerging Views and Practices from the Field Maryam Alavi and Dorothy Leidner Proceedings of the 32nd Hawaii International.
Quality Function Deployment in Maintenance Work Planning by S.O.Duffuaa, A.H.Al-Ghamdi, A.Al-Amer.
INTRODUCTION RATIONALE OBJECTIVE METHODOLOGY DATA ANALYSIS RECOMMENDATION CONCLUSION.
Introduction Time Quality Cost Project Constraints Success Introduction.
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS DHAHRAN, SAUDI ARABIA ARE-512 Life Cycle Costing – Cost Data Bank For By G. C. SOFAT S.K. TYAGI Presented.
Joint Venture in construction company in West Bank.
FACTORS INFLUENCING IMPLEMENTATION OF MAJOR INFRASTRUCTURE PROJECTS IN KENYA: A CASE OF THE SOUTHERN BYPASS ROAD, KENYA By 1. Dr. Charles Wafula Misiko.
The Marketing Research Project. Purposes of the Project 1.Give you practical experience at conducting a marketing research project. 2.Examine some factors.
Data Collection Methods. After choosing a sampling method, we need to collect data from the sample selected. Can you name some data collection methods.
Identify some of the major reasons for conducting survey
Measuring and Evaluation Instruments: Labour insertion Survey Carlos Mateo Quality Assessment Unit UNIVERSITY OF ALICANTE.
College of Environment Design Construction Engineering Technology Assessment of Constructability Practice Among General Contractors in The Eastern Province.
King Fahd University of Petroleum and Minerals
Contractor Alternate Design Serving the Public’s Best Interest.
Kick-off Meeting Granada, 16-17/04/2009 Agri-Multifunctionality II: Phases and Objectives.
Briefing to the Portfolio Committee on the Comparison on Procurement Methodologies 6 June 2006.
GROUP LENDING ENHANCEMENT WORKSHOP The Enhancement Options Process.
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
© 2010 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
1.5 Conducting start-up market research. Candidates should be able to: define market research explain the difference between primary and secondary research.
Nagraj Rao Statistician Asian Development Bank CROP CUTTING: AN INTRODUCTION.
Chapter 29 Conducting Market Research. Objectives  Explain the steps in designing and conducting market research  Compare primary and secondary data.
Nagraj Rao Statistician Asian Development Bank CROP CUTTING: AN INTRODUCTION.
Planning Planning is considered the most important element of the administrative process. The higher the level of administration, the more the involvement.
Overview Introduction to marketing research Research design Data collection Data analysis Reporting results.
Cost Overrun in Construction Projects Supervisor : Eng.Reema Nassar.
Why do we need a compensation survey
Unit – iii Sources of product for business
WHAT GOES INTO A BUSINESS PLAN?
WHAT GOES INTO A BUSINESS PLAN?
Build operate and transfer project delivery System in Saudi Arabia
Factors Affecting Bid/No Bid Decision Making IN The West Bank
Business valuation in the republic of Croatia – challenge or problem?
Presentation transcript:

1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University of Petroleum and Minerals Dhahran – Saudi Arabia

2 CONTENTS INTRODUCTIONOBJECTIVESMETHODOLOGY DIRECT LABOR CONTRACT FACTORS INFLUNENCING CHOICE STUDY SURVEY RESULTS OF THE STUDY CONCLUSIONS

3 INTRODUCTION  Nowadays, many maintenance managers are challenged to manage their maintenance activities with limited resources including direct labor.  Under certain conditions maintenance managers may choice to hire a maintenance contractor.  Based on their experience, maintenance managers do differ in their policy of when and at what level they recruit maintenance contractors

4 INTRODUCTION (continued)  In order to make a proper decision in making a chose between direct labor or a contract, the advantages and disadvantages as well as the factors influencing the chose between the two options must be identified and assessed.  Literature has identified these issues but none indicated their assessment and ranking.

5 OBJECTIVES OF THE STUDY To assess, from the view points of the maintenance managers, the advantages and disadvantages of direct labor versus maintenance contractors and the criteria that are needed to make a choice between the two options or combined.

6 RESEARCH METHODOLOGY The study was carried out in two phases: The first phase included a literature search and interviews. It help in the identification of the factors In the second phase a questionnaire was developed using the aforementioned factors and then a survey was conducted to assess the relative importance of those factors. The data gathered from the survey was analyzed statistically.

7 Direct Labor Based on a literature review and a pilot study of interviews with maintenance managers, the advantages and disadvantages of direct labor can be outlined as follows: (a)Advantages of Direct Labor 1.Full Control of the Allocation of Work 2.Direct Labor Familiar with Work 3.Better Cost Control 4. Better Control of Quality 5. No Delay in Execution 5. More Control on Security Risk

8 Direct Labor ( Continued) (b)Disadvantages of Direct Labor 1.Lack of Skilled Labor 2.It is More Expensive 3.Hard to Recall People in Emergency Case

9 CONTRACT Based on a literature review and a pilot study of interviews with maintenance managers, the advantages and disadvantages of the contract can be summarized as follows: (a)Contract Advantages 1.Providing Skilled Labor 2.Increasing Productivity of Maintenance 3.Less Investment in support Equipment 4.Less Management Problems 5.Choice of Changing Contractor 6.Control Manpower

10 CONTRACT ( Continued ) (b)Contract Disadvantages 1.It is Expensive 2.More Supervision required 3.Tendering Procedures Delay Work

11 Factors Influencing Choice The factors, which influence the choice between direct labor and contractor, may be identified as follows: 1. Nature of Work 2. Volume of Work 2. Response time Emergency work Urgent work Normal work 4.Location 4.Location 5.Quality 5.Quality 6.Market conditions

12 STUDY SURVEY Considering the above mentioned factors, a survey of a randomly selected sample of 30 professional maintenance managers in Saudi Arabia was carried out to measure their assessment of the relative importance of each of the above factors.

13 RESULTS OF THE SURVEY Based on the response of the survey, an importance index was calculated to reflect the level of importance of these factors. This index was calculated as follows: Importance Index (i)= Importance Index (i)=

14 ANALYSIS OF DATA Tables 1,2, and 3 show the importance index of all factors related to direct labor or a contract as well as the factors influencing the chose according to the evaluation of the professional maintenance managers. The importance indices were grouped to reflect the respondents rating as follows: Extremely important80 < I < 100 Important40 < I < 60 Somewhat important20 < I < 40 Not applicable0 < I < 20

15 Table 1: Result of the survey for Director Labor

16 Table 2: Result of the survey for Contracts

17 Table 3: Result of the survey for Factors Influencing Chose

18 CONCLUSIONS Based on the result of this study and as shown in Tables 1,2, and 3, the following can be concluded: The major advantages of direct labor were evaluated as follows: 1. Providing full control of work 2. Providing better cost control 3. Providing more control on security risk 4. Providing better control of quality 5. Direct labor familiar with work

19 CONCLUSIONS (continued ) The major disadvantages of direct labor were evaluated as follows: 1. Lack of skilled labor 2. It is more expensive 3. Hard to recall people in emergency cases

20 CONCLUSIONS (continued ) The major advantages of contract were evaluated as follows: 1. Availability of skilled labor 2. It increases the productivity 3. Flexibility in controlling manpower 4. less management problems 5. Choice of change contractor 6. Less investment in support equipment

21 CONCLUSIONS (continued ) The major disadvantages of contract were evaluated as follows: 1. It is expensive 2. Required more supervision 3. Tendering procedures will delay work 4. Quality is not easy to control 4. Quality is not easy to control

22 CONCLUSIONS (continued ) The major factors influencing choice were evaluated as follows: 1. Work requires conventional craft skills in joined with direct labor 2.Direct labor will be joined to high standard of maintenance 3. Market condition effect 4. Specialist work 5. Peak work loads 6. In emergency cases, contractor will respond better

23 THANK YOU