Vincent MASSAUT Meeting 28/03/2006 1 Meeting on Revision of the Occupational Radiation Exposure assessment for the Port-Interfacing Systems (WBS5.0) Garching.

Slides:



Advertisements
Similar presentations
IAEA International Atomic Energy Agency Responsibility for Radiation Safety Day 8 – Lecture 4.
Advertisements

IE 486 Work Analysis & Design II
1 Engineering Economic Decisions Lecture No.1 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Protection of the environment from ionising radiation - views of a regulator.
Protection Against Occupational Exposure
IAEA International Atomic Energy Agency International Workshop on the Safe Disposal of Low Level Radioactive Waste WG3 debriefing.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
S/W Project Management
Authorization and Inspection of Cyclotron Facilities Inspections.
Risk-Informed In- Service Inspection (RI-ISI) Ching Guey.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 1 Agenda Kick Off Meeting of the contract EFDA-ENEA 05/ Task TW5-SEA 4.2 “Update Failure Mode and Effect.
MODULE “PROJECT MANAGEMENT AND CONTROL” RADIATION PROTECTION SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 1 Kick-off Meeting TW5-TSW-001, -001B and -002 Garching 18/01/2006 Participants: CEA, ENEA, NNC,
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
Prime Responsibility for Radiation Safety
System Planning (Preliminary Investigation Overview)
Vincent MASSAUT 10/10/ EFDA Task TW6-TSS-SEA 2.1 Occupational Radiation Exposure - ALARA in ITER: further refinement Kick off meeting Garching, 10/10/2006.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Revision of the ORE assessment for the Port-Interfacing Systems Garching – 25th April 2006 Comment on the main received comments EFDA Task TW4 TSS SEA2.1.
Radiation Protection optimisation 3D planning tools and their applicability to occupational exposure at a fusion power plant F.Vermeersch SCKCEN EFDA 24.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Procedure Writing ALARA Radiological Safety and Response RPT-243-PE-2.
Carl Vance Combustion Air Pre-heater Design Review Presentation ME 486 3/13/03.
Fusion Technology - Safety & Environment Via E. Fermi 45, I-00044, Frascati (Rome), Italy ENTE PER LE NUOVE TECNOLOGIE,
Radiation Protection optimisation 3D planning tools and their applicability to occupational exposure at a fusion power plant F.Vermeersch SCKCEN EFDA 27.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency. IAEA Dr. Abraham Gregorio de Rosa,Sp.Rad Radiologist in HNGV Dili, Timor Leste 2 Perspectives on regulatory models.
Associazione EURATOM ENEA sulla FUSIONE KOM Meeting of the contracts TW5- TSW-001 and -002 Garching. January 18 th, 2006 Kick Off Meeting of the contracts.
Workshop EU Fusion Roadmap April 13-15, 2011, Garching, Objective 1 STAC AHG Report on Objective 1: ITER construction Workshop EU Fusion Roadmap, April.
-1- UNRESTRICTED / ILLIMITÉ Demonstrating the Safety of Long-Term Waste Management Facilities Dave Garrick 2015 September.
Vincent MASSAUT 24/10/ of ? slides Final meeting tasks TW5-TSW-001, -001B, -002 Recycling issues Introduction V. Massaut October 2006 UKAEA,
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
University of Sunderland CIFM02 Unit 5 COMM02 Project Hazard Management and Contingency Planning Unit 5.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 1 Monitoring Meeting TW5-TSW-001, -001B and -002 Mol 27/06/2006 Participants: ENEA, NNC, STUDSVIK,
ASPEC Damaging Energies New Staff Induction What is this course about? This course is designed to talk through the major damaging energies on site. It.
Vincent MASSAUT Meeting 28/03/ Meeting on ITER water chemistry and implication on the PACTITER development / CORELE experiments Garching / Cadarache.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
Ergonomics Risk Management: Strategies and Interventions at Workplace Level Back to Basics Conference June 13 th 2014 Frank Power Inspector (Projects Manager)
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
Radiation Protection computing tools Gérald Dumont HSE/RP.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Revision of ORE assessment for port-interfacing systems – Garching, Comments from EFDA Physics Integration 1 Main recommendations Comments from.
DARSHANA RAGHU MANAGEMENT. Risk Management Risk management is the identification, assessment, and prioritization of risks followed by coordinated and.
LIEBE Target Design Review. Schedule This comment is no longer valid as the schedule has been postponed and the beam permit will be requested for Q
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
1 Advantages of combining gamma scanning techniques and 3D dose simulation in dose optimisation problems. F.Vermeersch IDPBW, Nuclear Studies Occupational.
Enhancement of Radiological Safety Culture within Ignalina NPP and Contractors Viktor PLETNIOV Ignalina Nuclear Power Plant Lithuania Gintautas KLEVINSKAS.
G5/4 Revision Project Progress Update Andrew Bower
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Need for a Regulatory program.
1 Assessment of previous ORE evaluation by comparison with 3D exposure analysis. Analysis of the main difference contributors and optimisation of the calculation.
CHAPTER 2 SYSTEM PLANNING DFC4013 System Analysis & Design.
RADIATION PROTECTION 04/12/2016.
Vincent MASSAUT SCK•CEN and EFDA
QUALITY IMPROVEMENT FINAL QUARTERLY COLLABORATIVE WORKSHOP
Autonomous Robotics in the Nuclear Industry
The pathological effects of ionising radiation
Principles of Radiation Protection
Communication and Consultation with Interested Parties by the RB
Optimization of radiation protection at Bohunice NPP
Introduction to Projects
DCLL TBM Safety Status Brad Merrill, Fusion Safety Program
Class Project Guidelines
EU Tyre Industry comments on document ECE/TRANS/WP.29/GRB/2019/6
Analysis of the notification of compensatory measures
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

Vincent MASSAUT Meeting 28/03/ Meeting on Revision of the Occupational Radiation Exposure assessment for the Port-Interfacing Systems (WBS5.0) Garching / Cadarache 25/04/06 Introduction and objectives Vincent MASSAUT

Vincent MASSAUT Meeting 28/03/ Occupational Radiation Exposure (ORE) evaluation: main objectives The main general objectives of the ORE optimisation has important impact on:The main general objectives of the ORE optimisation has important impact on: –The safety of the operation personnel –The availability of the machine –The overall impact of fusion For the safety analysis and the licensing, the ALARA approach of the operation of the machine is important and makes part of the overall safety approach of the fusion plant.For the safety analysis and the licensing, the ALARA approach of the operation of the machine is important and makes part of the overall safety approach of the fusion plant.

Vincent MASSAUT Meeting 28/03/ In the RPrS  3 chapters –Radiological zoning –Network survey –Proof of the ALARA into the design KOM Radioprotection 23rd of March 2006 From CEA:

Vincent MASSAUT Meeting 28/03/ ALARA approach and radioprotection optimization in the overall safety approach

Vincent MASSAUT Meeting 28/03/ The ALARA approach Not only the reduction of dosesNot only the reduction of doses Not only the “good practice”Not only the “good practice” But mostly an optimization (…as Reasonably Achievable) based on other factors like economical factors, industrial safety, ethical values, etc…But mostly an optimization (…as Reasonably Achievable) based on other factors like economical factors, industrial safety, ethical values, etc… A complete ALARA approach should need to review the process from A to Z including the waste management, disposal etc. (NB this is in reality never done; but the overall principle should be kept in mind)A complete ALARA approach should need to review the process from A to Z including the waste management, disposal etc. (NB this is in reality never done; but the overall principle should be kept in mind)

Vincent MASSAUT Meeting 28/03/ The tasks involved There is an ITER/ITA task proposal (ITA 81-11), in the process to be signed, concerning “Occupational Safety to ensure worker safety and preliminary assessment to support licensing”. The present analysis and report belong mostly to the second deliverable of this task.There is an ITER/ITA task proposal (ITA 81-11), in the process to be signed, concerning “Occupational Safety to ensure worker safety and preliminary assessment to support licensing”. The present analysis and report belong mostly to the second deliverable of this task. Within EFDA it belongs to the task TW4-TSS-SEA2.1.a, contract 04/1205Within EFDA it belongs to the task TW4-TSS-SEA2.1.a, contract 04/1205

Vincent MASSAUT Meeting 28/03/ After various studies and reports, the current report summarizes the findings on the WBS 5.0 S. Sandri, “Analysis of the ORE assessment process applied to ITER project”, ENEA FUS-TN-SA-SE-R-50, September 2002S. Sandri, “Analysis of the ORE assessment process applied to ITER project”, ENEA FUS-TN-SA-SE-R-50, September 2002 J. Uzan-Elbez, “Justification of ALARA for ITER (design 2001)”, CEA/DEN/CAD/DTAP/CASI DO /11/03, Cadarache (France)J. Uzan-Elbez, “Justification of ALARA for ITER (design 2001)”, CEA/DEN/CAD/DTAP/CASI DO /11/03, Cadarache (France) A. Natalizio, M. T. Porfiri, "Worker Dose Estimates for NB & LH Heating & Current Drive Systems", ENEA FUS-TN-SA-SE-R-132, October 2005A. Natalizio, M. T. Porfiri, "Worker Dose Estimates for NB & LH Heating & Current Drive Systems", ENEA FUS-TN-SA-SE-R-132, October 2005 Some of the main reports/studies previously available:

Vincent MASSAUT Meeting 28/03/ Definition of WBS 5.x (following ITER documents) WBS 5.1 ITER Ion Cyclotron Resonance Heating and Current Drive (Task Officer : David Swain and A.Sakasai)WBS 5.1 ITER Ion Cyclotron Resonance Heating and Current Drive (Task Officer : David Swain and A.Sakasai) WBS 5.2 Electron Cyclotron Resonance Heating Systems (ECRH) (Task Officer : A.Sakasai)WBS 5.2 Electron Cyclotron Resonance Heating Systems (ECRH) (Task Officer : A.Sakasai) WBS 5.3 ITER Neutral Beam (Task Officer : A.Sakasai)WBS 5.3 ITER Neutral Beam (Task Officer : A.Sakasai) WBS 5.4 no info on ITER site (formerly LH&CD?)WBS 5.4 no info on ITER site (formerly LH&CD?) WBS 5.5 ITER Diagnostic (Task Officer : ?)WBS 5.5 ITER Diagnostic (Task Officer : ?) WBS 5.6 Test-Blanket Module (Task Officer : Masaaki Morimoto)WBS 5.6 Test-Blanket Module (Task Officer : Masaaki Morimoto)

Vincent MASSAUT Meeting 28/03/ The analysis of the ORE has been carried out with a “best practice” engineering approach The occupational exposure evaluation needs three main elements:The occupational exposure evaluation needs three main elements: –The dose rate or better the radiation field in the concerned areas These data are only partially known, and request often to make assumptions Only “general” values for the different working areas could be taken without taking into account the actual geometry, inner sources, ACP, etc. Internal exposure was not taken into account for this analysis –The work force (in terms of number of individuals concerned): here also, the data are based on assumptions for the main maintenance activities to be carried out –The duration (and frequency) of the intervention: the best engineering practices have been taken, based on the known design. But the actual design and maintenance scheme is important to better define this aspect

Vincent MASSAUT Meeting 28/03/ Some other uncertainties also affect this analysis The effects of difficulties for the workers (e.g. working in height, use of scaffolding, the wearing of masks or pressurized suits, the temperature in the rooms, the accessibility of the components to be worked on, etc…The effects of difficulties for the workers (e.g. working in height, use of scaffolding, the wearing of masks or pressurized suits, the temperature in the rooms, the accessibility of the components to be worked on, etc… The use of portable/removable shielding; the potential for partial decontamination of hot spots, the use of semi- autonomous tooling, etc…The use of portable/removable shielding; the potential for partial decontamination of hot spots, the use of semi- autonomous tooling, etc… The actual frequency of maintenance (probably to be discussed here) of the different concerned componentsThe actual frequency of maintenance (probably to be discussed here) of the different concerned components Etc…Etc…

Vincent MASSAUT Meeting 28/03/ Therefore, only important factors susceptible to change the figures are relevant to discuss The approach being still at the “pre-design” level, we must regard this study in view of the needs of the licensing documents and of what would then be asked for the “final” safety reports after the construction (it would be difficult to justify an important increase in the operators exposure at the time of start up !)The approach being still at the “pre-design” level, we must regard this study in view of the needs of the licensing documents and of what would then be asked for the “final” safety reports after the construction (it would be difficult to justify an important increase in the operators exposure at the time of start up !) So for this approach we need to remain pragmatic, realistic (in the limits of the current design) and, if possible, conservative.So for this approach we need to remain pragmatic, realistic (in the limits of the current design) and, if possible, conservative.

Vincent MASSAUT Meeting 28/03/ The main goals of this meeting are thus To review briefly the analysis done and the principles used throughout the studyTo review briefly the analysis done and the principles used throughout the study To analyze and discuss the comments and remarks gathered from designers and specialists of the concerned equipmentsTo analyze and discuss the comments and remarks gathered from designers and specialists of the concerned equipments To look how these comments can be integrated in the current study to improve it and tend towards the objectives (pragmatic, realistic and conservative)To look how these comments can be integrated in the current study to improve it and tend towards the objectives (pragmatic, realistic and conservative) To define how the interaction between designers, physics specialists and health physics analysts can be enhanced to avoid too much discrepancies between the analyzed machine and the current oneTo define how the interaction between designers, physics specialists and health physics analysts can be enhanced to avoid too much discrepancies between the analyzed machine and the current one To define how the potential detection of dose distributing events or components can be taken into account in the design, or how collaboration can be set up to decrease these levels.To define how the potential detection of dose distributing events or components can be taken into account in the design, or how collaboration can be set up to decrease these levels.

Vincent MASSAUT Meeting 28/03/ Proposal of agenda 9:00Short introduction on the main objectives of the meetingV. Massaut (EFDA-S&E) 9:15Summary report of the ORE study; methods and principlesM-T Porfiri (ENEA) 09:45Coffee Break 10:00Needed input for improving the analysisM-T Porfiri (ENEA) 10:15Comments on the main received commentsM-T Porfiri (ENEA) 10:45Discussion on the comments from ITERC. Walker (ITER) 11:15Discussion on the comments from ITER (cont’d)S. Chiocchio (ITER) 11:45Discussion on the main comments from the Physics groupE. Ciattaglia (EFDA – Physics) 12:15Discussion on the main comments from the Physics group (continued)NN (EFDA – Physics) 12:45Lunch 13:45Remote Handling aspects and approach; limit of applicability - the ITER approach : discussion C. Walker (ITER IT) 14:15General discussion on how to improve the ORE analysisAll 15:00Improvement of information exchangeAll 15:30Coffee Break 15:45Any other businessAll 16:00Closing addressW. Gulden (EFDA-S&E) 16:15End of the meeting Proposal

Vincent MASSAUT Meeting 28/03/ Thanks for your attention