Operational Flood Forecasting for Bangladesh: Tom Hopson, RAL-NCAR Peter Webster, Georgia Tech A. R. Subbiah and R. Selvaraju, Asian Disaster Preparedness.

Slides:



Advertisements
Similar presentations
Evidence-based Climate Risk Management
Advertisements

Use of Weather and Climate information in Climate risk management Example of ACMAD-IFRCC collaboration ACMAD by Léon Guy RAZAFINDRAKOTO.
Team Leader- Hydrology
NOAA’s NWS and the USGS: Partnering to Meet America’s Water Information Needs Ernie Wells Hydrologic Services Division NOAA National Weather Service May.
Structural Mitigation of Disaster Risks – case study of the island Gram Panchayat of Mousini in the Indian Sunderbans Delta, West Bengal, India. Shelter.
Flood Management in GBM Basin: A Mechanism for Natural Resource Management Between Co-riparians Priyanka Mallick JNU.
Long Lead Flood Forecast Application to Benefit Society: Experience of 2007 Bangladesh Floods S.H.M. Fakhruddin Technical Specialist, EWS
Oct 12, 2010 Hydrologic Early Warning System for East Africa Ashutosh Limaye, John Gitau, Eric Kabuchanga CRAM Workshop September 26, 2011.
Lucinda Mileham, Dr Richard Taylor, Dr Martin Todd
Operational Seasonal Forecasting for Bangladesh: Application of quantile-to-quantile mapping Tom Hopson Peter Webster Hai-Ru Chang Climate Forecast Applications.
Today we are going to build a case study of flooding in Bangladesh. This will contrast with the MEDC case study of Boscastle that we have already studied.
Nidal Salim, Walter Wildi Institute F.-A. Forel, University of Geneva, Switzerland Impact of global climate change on water resources in the Israeli, Jordanian.
Performance of Flood Control Works around Dhaka City during Major Floods in Bangladesh (Part-1) A.K.M. Saiful Islam Institute of Water and Flood Management.
URBAN FLOODS IN GREECE Current situation and major research and development needs in Urban Flood Management Cost meeting, Warsaw, 29-31/5/2008 Vassilopoulos.
Dennis P. Lettenmaier Alan F. Hamlet JISAO Center for Science in the Earth System Climate Impacts Group and Department of Civil and Environmental Engineering.
Pakistan Flood 2010: P. J. Webster R. A. Houze, Jr. P. J. Webster R. A. Houze, Jr. International Weather & Climate Events of 2010, AMS Annual Meeting,
Mid-Range Water Supply Forecasts for Municipal Water Supplies Matthew Wiley, Richard Palmer, and Michael Miller Department of Civil and Environmental Engineering.
JRC information day, 11 May 2006, Romania European Early Warning Systems for Floods and Droughts - How could Romania benefit? Dr. Ad De Roo European Commission,
LCG-DER Meeting 10 July 2014 Flood / Monsoon Preparedness 2014 Department of Disaster Management Ministry of Disaster Management & Relief.
Advanced Study Program
Mohammad Khaled Akhtar & Slobodan P. Simonovic
Flood Forecasting for Bangladesh Tom Hopson NCAR Journalism Fellowship June 14-18, 2010.
1 Flood Risk Management Session 3 Dr. Heiko Apel Risk Analysis Flood Risk Management.
Bangladesh: Basic Facts Presented by: Syed Amdadul Huq Research Director (a.i.), FPMU 22/02/10 Presentation to Cambodian Food Security Team.
For the lack of ground data the verification of the TRMM performance could not be checked for the entire catchments, however it has been tested over Bangladesh.
Ali Shafqat Akanda, Antarpreet Jutla & Shafiqul Islam.
1 Presentation On Disaster and preparedness situation in Uganda At SILVER SPRINGS HOTEL, UGANDA 16 th -SEPTEMBER-2011 BY LAZARUS OCIRA
PRESENTATION ON ENVIRONMENTAL DEGRADATION in the northeast India context.
Water availability assessment in data scarce catchments: Case Study of Northern Thailand Supattra Visessri 1st Year PhD Student, Environmental and Water.
Operational Flood Forecasting for Bangladesh: Tom Hopson, NCAR Peter Webster, GT A. R. Subbiah and R. Selvaraju, ADPC Climate Forecast Applications for.
Application of a rule-based system for flash flood forecasting taking into account climate change scenarios in the Llobregat basin EGU 2012, Vienna Session.
Experience and Strategies for Combating Climate Change ASSOCHAM Global Leadership Summit on Climate Change and Calamities September 17, 2014.
Streamflow Predictability Tom Hopson. Conduct Idealized Predictability Experiments Document relative importance of uncertainties in basin initial conditions.
Flood Risk Management in Hat Yai, Thailand
Presented by Binaya Pasakhala Assessing Vulnerability of People’s Livelihood in Far-western Nepal: Implications on Adaptation to Climate Change.
Users FLOOD EARLY WARING IN THE LOWER MEKONG BASIN Manithaphone Mahaxay.
Bangladesh BY ELLIE JOHNSTONE. Tuesday, 14 April 2009  Physical factors:  Sources of rivers are in Himalayas so snowmelt adds to the discharge during.
LO:I can explain the effects of river flooding on people and the environment.
Combining CMORPH with Gauge Analysis over
© Crown copyright Met Office Met Office activities related to needs of humanitarian agencies Anca Brookshaw.
Daily to Seasonal Operational Flood Forecasting Tom Hopson, NCAR and ADPC Peter Webster, CFAB and Georgia Tech A. R. Subbiah, ADPC.
Waiting for the Rains: The Effects of Monsoons in South Asia
Bangladesh Progress of Flood Reconstruction Programmes
Environmental prediction, risk assessment and extreme events: adaptation strategies for the developing world by Peter J. Webster, and Jun Jian Philosophical.
Operational Short-term Flood Forecasting for Bangladesh:
Early warning systems in the Urban setting- A Caribbean Perspective Organization of American States Sustainable Cities 2 December 2014.
Technological Improvements in Flood Forecasting Thomas Hopson National Center for Atmospheric Research (NCAR)
Design of meteorological data networks Dr. Anil Kumar Lohani National Institute of Hydrology, Roorkee India Hydro-Met Network Design Workshop, April 6-11,
Upstream Satellite-derived Flow Signals for River Discharge Prediction
Operational Flood Forecasting for Bangladesh using ECMWF ensemble weather forecasts Tom Hopson, NCAR Peter Webster, Georgia Tech A. R. Subbiah and R. Selvaraju,
Asia Flood Network— A USAID Program for Flood Mitigation and Preparedness in Asia Asia Flood Network Program Objective –Identify and fill gaps in end-to-end.
Nathalie Voisin 1, Florian Pappenberger 2, Dennis Lettenmaier 1, Roberto Buizza 2, and John Schaake 3 1 University of Washington 2 ECMWF 3 National Weather.
Judith Curry James Belanger Mark Jelinek Violeta Toma Peter Webster 1
Food and Agriculture Sector Working Group Report Concerns Relating to Monsoon Flood 2004.
India has multiple hazards that it must combat namely: 1.Drought 2. Floods 3.Cyclone 4.Earthquake While previous disasters form the basis of developing.
DOWNSCALING GLOBAL MEDIUM RANGE METEOROLOGICAL PREDICTIONS FOR FLOOD PREDICTION Nathalie Voisin, Andy W. Wood, Dennis P. Lettenmaier University of Washington,
VERIFICATION OF A DOWNSCALING SEQUENCE APPLIED TO MEDIUM RANGE METEOROLOGICAL PREDICTIONS FOR GLOBAL FLOOD PREDICTION Nathalie Voisin, Andy W. Wood and.
Supporting Small Scale Farmers’ Access to Climate Information.
Coastal Aquifer Management in the Caribbean Workshop 14 th -16 th December 2011 The Water Resource Management Agency Ministry of Sustainable Development,
South Asian Climate Outlook Forum (SASCOF-5) (Pune, India, April 2014) Country Presentation-Maldives Zahid Director Climatology Maldives Meteorological.
Latin American and Caribbean Flood and Drought Monitor – What it does and does not do Figure showing current system Coarse resolution 25km, daily Satellite.
Which flood? Boscastle 2004 Bangladesh 2004 Slow onset Flood
Development of Flood Forecasting for the Ganges and the Brahmaputra Basins using satellite based precipitation, ensemble weather forecasts, and remotely-sensed.
Flood Forecasting for Bangladesh
By KWITONDA Philippe Rwanda Natural Resources Authority
Precipitation Products Statistical Techniques
ECMWF, GEOGlows, and support for developing countries
Nathalie Voisin, Andy W. Wood and Dennis P. Lettenmaier
Application of satellite-based rainfall and medium range meteorological forecast in real-time flood forecasting in the Upper Mahanadi River basin Trushnamayee.
Mohammad Khaled Akhtar Bangladesh
Presentation transcript:

Operational Flood Forecasting for Bangladesh: Tom Hopson, RAL-NCAR Peter Webster, Georgia Tech A. R. Subbiah and R. Selvaraju, Asian Disaster Preparedness Centre Climate Forecast Applications for Bangladesh (CFAB): USAID/CARE/ECMWF/NASA/NOAA Bangladesh Stakeholders: Bangladesh Meteorological Department, Flood Forecasting and Warning Center, Bangladesh Water Development Board, Department of Agriculture Extension, Disaster Management Bureau, Institute of Water Modeling, Center for Environmental and Geographic Information Services, CARE- Bangladesh

Climate Forecasting Applications for Bangladesh (CFAB) The CFAB project goals: Develop resilient forecast schemes that capitalize on skillful modeling techniques and advanced data sources at time-scales: 1-6 months, days, 1-10 days (2000) Develop an infrastructure within Bangladesh to: a) make use of the forecasts -- establish pilot projects at selected sites, showing measurable improvements (2006) b) eventually own the prediction schemes -- facilitate a technological transfer (2008)

2004 dry season river flows … … and during the July flooding event NASA Aqua/Modis images

Bangladesh background About 1/3 of land area floods the monsoon rainy season Size: sightly smaller than Iowa (144,000 sq km) Border countries: Burma (193 km), India (4,053 km) Population: 140 million 36% of population below poverty line Within the top 5 of: poorest and most densely populated in the world Natural disasters: Nov 1970 Bhola cyclone -- at least 300,000 died in 20 min (12m) April 1991 Bangladesh cyclone ,000 died (6m)

(World Food Program) Damaging Floods: large peak or extended duration Affect agriculture: early floods in May, late floods in September Recent severe flooding: 1974, 1987, 1988, 1997, 1998, 2000, 2004, and : 60% of country inundated for 3 months, 1000 killed, 40 million homeless, % total food production 2004: Brahmaputra floods killed 500 people, displaced 30 million, 40% of capitol city Dhaka under water 2007: Brahmaputra floods displaced over 20 million River Flooding

Overview: Bangladesh flood forecasting I.CFAB History -- sea-level backwater effects II day Discharge Forecasting 1. precipitation forecast bias removal 2. multi-model river forecasting 3. accounting for all error: weather and hydrologic errors III Floods and Warning System Pilot Areas

How important are (“forecastable”) interannual sea level variations on country-wide extreme flooding events? Answer: effects impact river heights roughly 200km upstream …

August 2002 floodsSeptember 1998 Upper-Catchment Flooding disasterous flood year“normal” flood season  Severe flood years affect whole country, with water depth variations of O(1m) => Look at precipitation-driven effects on flooding

CFAB Project: Improve flood warning lead time Problems: 1. Limited warning of upstream river discharges 2. Precipitation forecasting in tropics difficult Assets: 1. good data inputs: weather forecasts, satellite rainfall 2. Large catchments => weather forecasting skill “integrates” over large spatial and temporal scales 3. Partnership with Bangladesh’s Flood Forecasting Warning Centre (FFWC) => daily border river readings

Merged FFWC-CFAB Hydraulic Model Schematic Primary forecast boundary conditions shown in gold: Ganges at Hardinge Bridge Brahmaputra at Bahadurabad

Transforming (Ensemble) Rainfall into (Probabilistic) River Flow Forecasts Rainfall Probability Rainfall [mm] Discharge Probability Discharge [m 3 /s] Above danger level probability 36% Greater than climatological seasonal risk?

Daily Automated Operational Flood Forecasting Sequence

ECMWF 51-member Ensemble Precipitation Forecasts 2004 Brahmaputra Catchment-averaged Forecasts 5 Day Lead-time Forecasts

Pmax 25th50th75th100th Pfcst Precipitation Quantile Pmax 25th50th75th100th Padj Quantile Bias Adjustment Model Climatology“Observed” Climatology

Bias-corrected Precipitation Forecasts Brahmaputra Corrected Forecasts Original Forecast Corrected Forecast

Daily Automated Operational Flood Forecasting Sequence

2003 Model Comparisons for the Ganges (4-day lead-time) hydrologic distributed modelhydrologic lumped model Resultant Hydrologic multi-model

Multi-Model Forecast Regression Coefficients - Lumped model (red) - Distributed model (blue) Significant catchment variation Coefficients vary with the forecast lead-time Representative of the each basin’s hydrology -- Ganges slower time-scale response -- Brahmaputra “flashier”

Daily Automated Operational Flood Forecasting Sequence

Significance of Weather Forecast Uncertainty Discharge Forecasts 3 day 4 day 5 day 7 day8 day 9 day10 day 2004 Brahmaputra Discharge Forecast Ensembles Corrected Forecast Ensembles 7 day8 day 9 day10 day

Producing a Reliable Probabilistic Discharge Forecast Step 1: generate discharge ensembles from precipitation forecast ensembles (Q p ): 1/51 1 Q p [m 3 /s] Probability PDF Step 3: combine both uncertainty PDF’s to generate a “new-and-improved” more complete PDF for forecasting (Q f ): Q f [m 3 /s] 1 Probability Step 2: a) generate multi-model hindcast error time-series using precip estimates; b) conditionally sample and weight to produce empirical forecasted error PDF: forecast horizon time PDF Residual [m 3 /s] [m 3 /s] Residuals => a)b)

2 day 3 day4 day 5 day Confidence Intervals 7 day8 day 9 day10 day 50%95% Critical Q black dash 2004 Brahmaputra Forecast Results Above-Critical-Level Cumulative Probability 7 day8 day 9 day10 day

Overview: Bangladesh flood forecasting I.CFAB History -- sea-level backwater effects II day Discharge Forecasting 1. precipitation forecast bias removal 2. multi-model river forecasting 3. accounting for all error: weather and hydrologic errors III Floods and Warning System Pilot Areas

Five Pilot Sites chosen in 2006 consultation workshops based on biophysical, social criteria: Rajpur Union sq km -- 16,000 pop. Uria Union sq km -- 14,000 pop. Kaijuri Union sq km -- 53,000 pop. Gazirtek Union sq km -- 23,000 pop. Bhekra Union sq km -- 9,000 pop. (annual income: 30,000 Tk; US$400)

2007 Brahmaputra Ensemble Forecasts and Danger Level Probabilities 7-10 day Ensemble Forecasts7-10 day Danger Levels 7 day 8 day 9 day10 day 7 day8 day 9 day10 day

Response of National Institutions for 2007 flood forecasts Flood Forecasting and Warning Center (FFWC) incorporated the CFAB forecasts to produce water level forecasts for many locations along Brahmaputra and Ganges well in advance National level Disaster Emergency Response Group prepared emergency response plans, logistics for preparedness and relief in advance Selvaraju (ADPC)

Response of local institutions for 2007 flood forecasts Local project partners used community vulnerability maps to assess the risk of flooding Local NGOs and CBOs mobilise boats to rescue people and livestock from the “char” areas Selvaraju (ADPC)

Community level decision responses for 2007 flood forecasts (Low lands) Secured cattle, poultry birds, homestead vegetables, protected fishery by putting nets in advance Planed to evacuate and identified high grounds with adequate communication and sanitation facilities

Community level decision responses for 2007 flood forecasts (High lands) Protected homestead vegetables by creating adequate drainage facilities Livestock was protected in high lands with additional dry fodder (paddy straw) Early harvesting of B.aman rice and jute anticipating floods in Gaibandha and Sirajganj, respectively. Selvaraju (ADPC)

2007 ADPC Warnings issued … “We were able to inform the people in advance and on 25th July we started communicating the information to as many people as possible about the certainty of exceeding danger levels along the Brahmaputra…The local partners, non- government organization (NGO) networks and DMC members were advised to inform the poorest of the poor, especially those people living in river islands (“chars”)...” “On the 28th and 29 th, meetings were organized in villages near Rangpur (northern Bangladesh), where the Teesta River was flowing just a few inches below the rim... However, they perceived that the river water level would fall, but our forecasts showed a rising trend…We informed them the significant chance of overflow and breaches, as the embankments are weak in certain places. We engaged the local partner NGOs to prepare an evacuation plan urgently…” “We communicated the forecast to another pilot union DMC chairman (Uria Union in Gaibandha District) directly on July 26th so he could arrange to mobilize resources for evacuation through DMC members and volunteers. All the six villages in the union were later flooded to a height of 4-6 feet on July 29th. We contacted him again on the 29th to know more and he informed us that about 35% of the people in the union were evacuated in advance.” “The communities in Rajpur Union of Lalmunirhat (relatively medium lands), were able to use the forecast for preparedness activities like mobilizing food, safe drinking water for a week to 10 days, protecting their T. aman rice seedlings, fishing nets, and raising and protecting their fish pods.” “For the first time we have communicated 10-day in-advance official forecasts of significant chances of exceeding danger level in all the gauge stations along the Brahmaputra River through the FFWC (and not just in the pilot regions) and directly through all local NGOs, and the DMC members obviously had 8 days extra lead-time they otherwise would not have had.”

Conclusions 2003: CFAB forecast went operational 2004: -- Forecasts fully-automated -- Forecasts fully-automated -- CFAB became an entity of Bangladesh government -- CFAB became an entity of Bangladesh government -- forecasted severe Brahmaputra flooding event 2006: -- Forecasts incorporated into operational FFWC model -- 5 pilot study dissemination areas trained 2007: 5 pilot areas activated during two severe flooding events

Future Work Dartmouth FloodWatch Program river discharge estimates Improved river routing Fully-automated forecasting scheme applied to other river basins in Africa (and elsewhere) Climate change impacts …

Thank You!