C o m m e r c i a l & l e g a l p u b l I c p r o c u r e m e n t s p e c I a l i s t s I n s t r a t e g i c a l l i a n c e w I t h B a r t e l s S u.

Slides:



Advertisements
Similar presentations
Using public procurement to foster research and innovation More Research and Innovation COM(2005) 488 of 12 October 2005 Commission communication to the.
Advertisements

European Commission DG Development EC Responses to Soaring Food Prices Philip Mikos – DG Development Policies for the Sustainable management of natural.
Antonella Fresa Vilnius, 4th October 2007 Antonella Fresa Technical Coordinator MinervaEC MInisterial NEtwoRk for Valorising Activities in digitisation,
ACCESS TO GENETIC RESOURCES AND BENEFIT-SHARING UNDER THE CONVENTION ON BIOLOGICAL DIVERSITY by Valérie Normand Secretariat of the Convention on Biological.
European Economic and Social Committee Consultative Committee on Industrial Change "CCMI" P r e s e n t a t i o n of J á n o s T Ó T H Member of the EESC.
Legal framework for Green Public Procurement (GPP) Module 2 European Commission GPP Training Toolkit.
1 European Commission The role of regional networks in the EU policy making process Disclaimer: This contains the personal opinions of the author.
European Commission: Environment Directorate General Slide: 1 The Second European Climate Change Programme Working Group I ECCP review Draft Mandate Stefaan.
Implications for the Regions EU-Regional Policy 1 Governance White Paper Introduction Adoption of White Paper on European Governance, July 25, 2001 Aim:
Proposal for the Connecting Europe Facility (CEF)
DG REGIO – Unit "Thematic Development" EUROPEAN COMMISSION 1 Regions for Economic Change Communication (2006) 675 of 8/11/2006
Regional and national initiatives in support of European Technology Platforms Dr. Fiona Williams Chairman, eMobility steering board
10 Oct Creation of lead markets in ICT Public procurement of Security solutions Mr. G. Barontini.
ICT for Energy Efficiency
Pre-commercial Procurement of Innovation Building together innovative solutions Ulf Dahlsten, Director European Commission, DG INFSO.
European Commission: Environment Directorate General Slide: 1 ECCP Aviation Working Group Mandate and draft work programme Directorate C – Air and Chemicals.
General introduction to Community legislation in the field of Public procurement the classical sector – Directive 2004/18/EC Mr. Jari Kallio DG MARKT Directorate.
PPP and EC funding 2007 – 2013 JOHANN SOLLGRUBER DG REGIO
POLISH PRESIDENCY IN THE EU: COHESION POLICY AND EVALUATION-RELATED ACTIVITIES Presentation of Objectives and Programme Stanisław Bienias, Ministry of.
The Cohesion Fund: Programming and link to the Structural Funds Annual Meeting of ISPA Partners 2003: From ISPA to Cohesion Fund and Structural Funds Angela.
AUDIT AND CONTROL UNIT EUROPEAN REGIONAL DEVELOPMENT FUND (ERDF) AND COHESION FUND (CF) QUIRINO MEALHA DIRECTOR.
Asia-Pacific Regional Program on Mainstreaming ICT Accessibility for Persons with Disabilities August 2009 Bangkok, Thailand Overview of Public Procurement.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
0 - 0.
SCATTER workshop, Milan, 24 October 2003 Institutional issues in relation with the control of urban sprawl: from barriers to co-operation Analysis performed.
December 9, 2004 Preparation of Standard Contract Documents Using best Finnish and EU practices Liisa Lehtomäki Finnish Institute of Public Management.
EU Remedies Directives Update Florence Gregg figpc ltd, M:
European Commission Enterprise and Industry # European Standardisation: Proposal for a Regulation Presentation to IMCO – 5 October 2011 European Commission.
Experiences with procurement policy in the EU Procurement Seminar Delhi, May 2006 Georg Roebling DG TRADE European Commission.
1. European Commission GHS Implementation Status in the European Community ICCM Dubai UNITAR Side event 4-6 February 2006 Eva Sandberg European Commission.
Digital Agenda Unleashing the Potential of Cloud Computing in Europe Ken Ducatel Head of Unit Software and Services, Cloud European Commission (Directorate.
Public Procurement in Macedonia Achievements in 2011.
Sectoral Social Dialogue Committee Paper Industry 29 May 2013 Industrial Policy in Europe Ewa Oney European Commission, DG Enterprise and Industry Unit-F3.
RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger
EU Procurement – competitive dialogue and case-law Norman Ballantyne Yousof Khan.
CERUPT The Experiences so far Reginald Hernaus Ministry of Housing, Spatial Planning and the Environment.
Relevant Procedures and approaches in PPI Relevant procurement procedures subject to the Public Procurement Directive 2014/24/EU Potential tender approaches.
FP7 Preparations ISTC meeting 31 March Content FP7 preparation approach and timetable Context for FP7 and for ICT in FP7 Research in New Financial.
European Learning Network on a better future for the Social Economy Social Considerations in Public Procurement Guide to “Buying Social” CSR in the European.
Public Procurement Agency Public Procurement System in Bosnia and Herzegovina.
1 EFCA - 21th March 2002 Raul Mateus Paula. 2 This presentation underlines: The key objectives of the Relex Reform The division of the responsibilities.
Regional Policy ESIF : Technical Assistance Platform for financial instruments (TAP) DG Regional and Urban Policy, Unit B.3 Financial Instruments,
INNOVATIVE PROCUREMENT The Next Steps Anthony Cachia Director (Operations) Department of Contracts.
Public Procurement in the Republic of Cyprus By: Theodosis Tsiolas Public Procurement Directorate Treasury of the Republic.
1 Public Procurement of Innovations a driver for future health in Europe - Stockholm, 13 October 2009 Public Procurement Directives supporting innovation.
1 Social Considerations in EC Public Procurement Loredana Puiu Internal Market & Services DG Directorate C: Public Procurement Policy.
1 DG Enterprise & Industry European Commission Conference on Better Regulation: Practical Steps Forward Reykjavík 6 June 2006 OVERVIEW OF THE BETTER REGULATION.
Proposal for new EU procurement Directives 30 May 2012 Catherine Wolfenden.
1 European Commission Enterprise and Industry DG Entrepreneurship and Innovation Programme Management Committee, Brussels, 26 June 2008 Public Procurement.
Pre-Commercial Procurement (PCP) Actions Open call in Objective 11.1 Calls for PCPs in specific public sector domains in objectives 5.3, 5.4 and 3.5
The 2012 European Cloud Computing Conference Brussels, 21 March 2012 Building the European Cloud Computing Strategy Carl-Christian Buhr (All expressed.
1 Experience in performing electronic auctions Marc Christopher Schmidt.
DEVELOPMENT COOPERATION FRAMEWORK Presentation by Ministry of Finance 10 December 2013.
TEN-T Executive Agency and Project Management Anna LIVIERATOU-TOLL TEN-T Executive Agency Senior Programme and Policy Coordinator European Economic and.
2008 Communication “A European Agenda for Culture in a globalizing world” Published by the European Commission May 2007 Adopted by the Culture Council.
Logo area The PCP Principles Open Market Consultation 30 th of March Christophe Veys Procurement Service Procurement Legal Adviser
Social Dialogue Plenary Meeting
Pre Commercial Procurement
Workshop ESF and tendering 11 October 2006, Brussels Directive 2004/18/EC Tendering of public contracts Robert Wein, European Commission Disclaimer:
Steps during and after a Public Procurement of Innovative Solutions
Aim - Methodology - Results
Dr. Peter Trepte Barrister, London
Paris, 27&28 October 2015.
Steps during and after a Public Procurement of Innovative Solutions
Steps during and after a Pre-commercial Procurement
Steps during and after a Pre-commercial Procurement
Steps during and after a Pre-commercial Procurement
Steps during and after a Pre-commercial Procurement
Modernisation of EU public procurement policy
Presentation transcript:

C o m m e r c i a l & l e g a l p u b l I c p r o c u r e m e n t s p e c I a l i s t s I n s t r a t e g i c a l l i a n c e w I t h B a r t e l s S u e t e r s F i s c h e r P r o c u r e m e n t L a w y e r s © 2006 Corvers Procurement Services B.V. Innovative public & utilities technology procurement. Beyond purchasing : enhanced interaction Brussels, October, 10 th 2006 Mr. S.F.M. Corvers

© 2006 Corvers Procurement Services B.V. I n s t r a t e g i c a l l i a n c e w I t h B a r t e l s S u e t e r s F i s c h e r P r o c u r e m e n t L a w y e r s 2 Agenda Introduction Setting the scene : a program Conclusion

© 2006 Corvers Procurement Services B.V. I n s t r a t e g i c a l l i a n c e w I t h B a r t e l s S u e t e r s F i s c h e r P r o c u r e m e n t L a w y e r s 3 Legislation & information 2004/17/EC : utility sector 2004/18/EC : public sector 89/665/EC : remedies directive Communication from the Commission COM(2005), 488 final, Wilkinson report, September 2005 Independent ICT expert report on pre-commercial procurement of innovation, March 2006

© 2006 Corvers Procurement Services B.V. I n s t r a t e g i c a l l i a n c e w I t h B a r t e l s S u e t e r s F i s c h e r P r o c u r e m e n t L a w y e r s 4 Procurement Procurement : demand side policy instrument (pull mechanism) Pre-commercial procurement : to create lead markets / new technologies (DG INFSO) Commercial procurement : to foster the diffusion of newly created technologies (DG INFSO) To foster the creation of new technologies as a marginal part of traditional projects (Frauenhofer report / ICT projects)

© 2006 Corvers Procurement Services B.V. I n s t r a t e g i c a l l i a n c e w I t h B a r t e l s S u e t e r s F i s c h e r P r o c u r e m e n t L a w y e r s 5 Overview total process (IWT) Political decision making Political decision making Masterplan Platform: Technical dialogue Platform: Technical dialogue Innovation matrix Innovation matrix Pre-commercial Procurement Phase Pre-commercial Procurement Phase Commercial Procurement fase Preparation Execution Finalization Optie 1 Optie 2

© 2006 Corvers Procurement Services B.V. I n s t r a t e g i c a l l i a n c e w I t h B a r t e l s S u e t e r s F i s c h e r P r o c u r e m e n t L a w y e r s 6 Procurement process Strategy Procurement policy Strategy Procurement policy Preparation Execution Finalization Phase 1 Phase 2 Phase 3 Evaluation Needs analysis Internal analysis Market analysis Needs analysis Internal analysis Market analysis Contract notice Procedure Selection / award criteria Contract notice Procedure Selection / award criteria Notice of result Written report Contract Implementation Notice of result Written report Contract Implementation

© 2006 Corvers Procurement Services B.V. I n s t r a t e g i c a l l i a n c e w I t h B a r t e l s S u e t e r s F i s c h e r P r o c u r e m e n t L a w y e r s 7 Preparation: vital part Preparation phase is vital for pre-commercial procurement There is a need to structure the interaction between supply and demand side Result: Platform Platform is a way to organize the market consultation and the technical dialogue

© 2006 Corvers Procurement Services B.V. I n s t r a t e g i c a l l i a n c e w I t h B a r t e l s S u e t e r s F i s c h e r P r o c u r e m e n t L a w y e r s 8 Innovationmatrix

© 2006 Corvers Procurement Services B.V. I n s t r a t e g i c a l l i a n c e w I t h B a r t e l s S u e t e r s F i s c h e r P r o c u r e m e n t L a w y e r s 9 Procurement options Pre-commercial procurement : article 16f 2004/18/EC Commercial procurement

© 2006 Corvers Procurement Services B.V. I n s t r a t e g i c a l l i a n c e w I t h B a r t e l s S u e t e r s F i s c h e r P r o c u r e m e n t L a w y e r s 10 New legislative framework Enhanced and structural flexibilityOptional flexibility / depending on national implementation Technical dialogue (modified) Technical specifications (modified) Variants Performance of contracts (new) Procedures (open / restricted / negotiated/ design contest) Competitive dialogue Conduct of procedures (modified) Award of the contract

© 2006 Corvers Procurement Services B.V. I n s t r a t e g i c a l l i a n c e w I t h B a r t e l s S u e t e r s F i s c h e r P r o c u r e m e n t L a w y e r s 11 Conclusion Increased structural instruments and possibilities in new directives compared to old directives, e.g. technical dialogue, technical specifications and contract performance Pre-commercial procurement : additional instrument ?

© 2006 Corvers Procurement Services B.V. I n s t r a t e g i c a l l i a n c e w I t h B a r t e l s S u e t e r s F i s c h e r P r o c u r e m e n t L a w y e r s 12 Thank you. Corvers Procurement Services B.V. s-Hertogenbosch Rijswijk (The Netherlands) Tel: