4th CSE ERI Stakeholders Group meeting AEEG – European regulatory affairs 15 maggio 2012 Overview of the regional work programme towards 2014.

Slides:



Advertisements
Similar presentations
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Advertisements

Cross-regional roadmap for Day-Ahead Market Coupling XXI Florence Forum Florence, 5 December 2011.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling Work in progress, This version: 22 September 2011 updated after 5 th AESAG, 20 September 2011,
How to do intraday capacity pricing in a continuous trade environment? 10 October 2011 NRA-TSO-PX meeting (Informal minutes, made during workshop, of the.
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
TITRE 28/03/2012 NWE IG meeting – Amsterdam Schiphol NWE day-ahead price coupling – cost issues.
SWE IG Meeting Paris, CRE XBID Overview Supported by.
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
NWE Day-ahead price coupling project Cost Issue 2 nd IG Meeting 26 October APX ENDEX.
Cross-Regional Roadmap for Intraday DRAFT Updated 31/10/2011.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Cross-regional roadmap for Capacity Calculation XXI Florence Forum Florence 5 December 2011.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
1 Intraday in the CWE region NWE and Bilateral initiatives Common RCC CSE - CWE 28 September 2010.
Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
EURELECTRIC vision on market development – what can the industry provide to accelerate market development? Peter ŠTULC Chairman of EURELECTRIC TF flow-based.
09/12/2011 NWE Stakeholders Group meeting-London Getting to 2014 A contribution from the Regional Initiatives Process Christophe Gence-Creux Head of the.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
3. Update on status and implications of NWE intraday project (selection of the solution for the platform) 11 th Implementation Group Meeting 1 st March.
ERI CS REM, 11th IG meeting. Milan, 21 November 2008 Towards a single auction platform in the SW region Rafael Gómez-Elvira Deputy Director for European.
IFE-CASC long term auctions Project status Implementation Group Meeting - Lisbon,
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
Progress with coupling FUI and CWE region
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
Introduction of an Intraday market on the Italian borders for the year 2011 Terna proposal Electricity Regional Initiative – CSE Region 15th Implementation.
Draft Cross-regional roadmap for Capacity Calculation Still work in progress, for discussion 27 June 2011.
GRI NW European Energy Work Plan 2011 – 2014 Programme Office RCC meeting, 15 September 2011.
Directie Toezicht Energie 11 Roadmap GRI NW Robert Spencer, NMa/DTe.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
The Capacity Allocation & Congestion Management Network Code An overview & status update Antonio Lopez-Nicolas Manager - Markets.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
EURELECTRIC Views on the Regional Integration process CSE Stakeholder Group Meeting EURELECTRIC Views on the Regional Integration process Marco Foresti,
European Federation of Energy Traders 1 8th SG meeting ERI South-West Europe 6 th October 2014, Madrid.
Global Competitiveness in a Liberalised EU Energy Market The Role of ENTSO-E Ifiec Energy Forum Brussels Daniel Dobbeni.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Draft cross-regional roadmap for Day-Ahead Market Coupling - Work in progress - NWE day-ahead price coupling project IG meeting 26 October 2011.
Draft cross-regional roadmap for Long-Term Transmission Rights Still work in progress, for discussion 27 June 2011.
IG FUI, Brussels, 21 st of May European thinking on intraday target model.
PCR Status report AESAG, September Supported by:
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
Continuous Cross-Border Implicit Intraday Trade Status update XXI. Florence Forum Dec 05th, 2011.
José Sierra, RIG Chair Rafael Gómez-Elvira (RIG Chair Team) XIX Florence Forum 14 December 2010 ERGEG Electricity Regional Initiatives Status Review.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
European Commission views on intra-day and balancing markets
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Introduction of an Intraday market on the Italian borders for the year 2011 Electricity Regional Initiative – CSE Region Milan, 16/11/2010.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
ACER’s view on the future role of the Gas Regional Initiative
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
ERGEG Benchmarking report on long term transmission rights
ACER’s view on the future role of the Gas Regional Initiative
Presentation transcript:

4th CSE ERI Stakeholders Group meeting AEEG – European regulatory affairs 15 maggio 2012 Overview of the regional work programme towards 2014

Autorità per lenergia elettrica e il gas 2 At a cornerpoint The CACM NC preparation is marking an important step towards a common set of binding rules towards the implementation of the target model Nevertheless the voluntary approach is going to keep a fundamental role in the coming months/years Role of the stakeholders in identifying key development areas A region at the border of the main ongoing integration processes (NWE): what role, what inputs to the creation of the IEM?

Autorità per lenergia elettrica e il gas 3 Long term timeframe The subject is already considered as cross- regional In line with the workprogramme: from 2011 a single set of auction rules almost harmonized between CSE and CWE regions Single auction office for the 2 regions Still significant differences exist in the 2 regions (products, firmness management) mainly deriving from the different ways in which capacity is calculated (top-down vs bottom-up approach).

Autorità per lenergia elettrica e il gas 4 Long term timeframe /2 Harmonization of capacity calculation method is perceived of special importance to improve also auction rules harmonization; The CSE region has played an important role in PTR allocations, what about FTR? The WP foresees a decision towards FTR already in 2012 (roadmap towards implementation in 2014) (too early?) anyway important local experiences (Italian market already uses FTRs) could be helpful also at a cross-regional level.

Autorità per lenergia elettrica e il gas 5 Long term timeframe /stakeholders views CASC operation: any comment / suggestion? FTR role in the region: when should discussion be started what involvement for the stakeholders? Products definition and duration: any comment/suggestion?

Autorità per lenergia elettrica e il gas 6 Day ahead timeframe The workprogramme foresees a gradual adotpion of the PCR algorithm (once developed and validated) in the markets of the region 2012 and 2013 to adapt local market arrengements hampering the integration with European coupling Implementation of price coupling in the region by beginning of 2014

Autorità per lenergia elettrica e il gas 7 Intraday timeframe The workprogramme foresees the implementation of the first interim solution by April 2012 (little delay) Development of a roadmap towards the target solution to be approved by regulators by Q Go Live of the target solution by the end of 2014

Autorità per lenergia elettrica e il gas 8 Intraday timeframe /potential obstacles TSOs invited to work – in coordination with PXs – on the roadmap towards the target model; The implementation of the target solution is not so smooth also in more advanced regions (NWE) where different solutions are being tested in different borders The cohexistence of continuous trading and auctions represents an additional constraint for our region, but a joint working group already established to study pilot solutions on selected borders

Autorità per lenergia elettrica e il gas 9 Balancing WP foresees first possible solutions to be adopted from 2013 on selected borders The increasing amount of RE generation capacity in the region may represent a driver for exchange of balancing energy It will be important to go hand in hand with the development of the future NC on balancing

Autorità per lenergia elettrica e il gas 10 Capacity calculation The current WP foresees a possible revision of the product definitions so to allow offering capacity with a higher level of firmness Work on FB to be started in 2013 What about the CWE and CEE experiences? The regional dimension is extremely important also for the CACM NC, but what is the ideal regional scope for activities linked to FB calculation

Autorità per lenergia elettrica e il gas 11 Prioritization Could it be considered a feasible approach to define prioritization criteria on the different topics so to concentrate the efforts on selected issues? What are the stakeholders views?