Project Manager: Manolo Clar, SCP/RAC Contact SCP/RAC: Enrique Villamore Phone. (+34) Sub-component 2.3: Environmentally Sound Management of equipment, stocks and wastes containing or contaminated by PCBs in national electricity companies of Mediterranean countries Activity Awareness of importance of ESM of PCBs equipment Activity Technical capacity for ESM of PCBs equipment
Index 1. Main activities until end of project 2. Bottlenecks or issues in final delivery 3.Deliverables/successes and show-case events
Two (2) SCPRAC awareness workshops (0,5 days) and two (2) training courses (1,5 days) on PCBs management in Turkey and Egypt 1.Main activities until end of project Activity Technical capacity for ESM of PCBs equipment
1.Main activities until end of project Activity Technical capacity for ESM of PCBs equipment PCB awareness workshop (0,5 days) + training (1,5 days) ActivityLocationDateStatus PCB awareness workshop + training course (2 days) Ankara (Turkey)May-June 2015Planned PCB awareness workshop + training course (2 days) El Cairo (Egypt)May-June 2015Planned
Three Regional Meetings Three updated/new guidelines (PCB, Lube Oil, Tannery) and related fact sheets Best practices on Phosphogypsum 2 National Workshops on policy reforms 12 National workshops on NAP update Publications (two reports ) NAP implementation country fact sheets PCB disposal (over 850 tons) Training (100 people) 1.Main activities until end of project (2.1, 2.2 and 2.3) ( MEDPOL)
Tunisia Project Steering Committee operational/3 meetings Study tour abroad for 6 national experts 5 – 14 April The National workshop date to be held in 24 April 2015 Best practices in process of preparation Algeria Project Steering Committee operational/3 meetings Economic study ongoing and NAP on lube oil Draft law National workshop 21 April Policy reform in major industrial sectors (fertilizer and tannery industries and lube oil management)
Web based tool delivered. Guidelines for using the web based tool was prepared and agreed by MEDPOL. Regional Training workshop organized in Athens – Greece on 25 November ELV tool validated and found quite useful. hosting the web –based tool on UNEP/MAP web site in process Follow up – important Further validation would strengthen the tool Enthusiasm on the potential uses of the tool Setting ELV in industrial effluents and EQS in all participating countries for 10 parameters (streamlining EcAp in the LBS protocol implementation).
Regional meeting and training in Athens, Greece from November The Guidance Document on Environmental Inspection systems; Training on real cases from major pollutant sectors including illegal trafficking of HW Vision paper prepared with the countries on key future priorities to enhance compliance and enforcement in the Mediterranean Environmental Inspectorate and Enforcement
Environmental inspectorate/ National activities National Training workshop organized in Alexandria – Egypt at Hilton Hotel from 8-10 December National Training workshop organized in Rabat – Morocco at Mercure Hotel from December 2014.
2.3 Environmentally Sound Management of equipment, stocks and wastes containing or contaminated by PCBs in national electricity companies of Mediterranean countries
PCB ESM Guide Draft Fact Sheets for 5 key sectors Regional workshop to review the guidelines/guide and fact sheets in Istanbul 7-9 April 2015; Collaboration with H2020 Collaboration with Basel Convention to address illegal trafficking. 40 participants confirmed Legislative/institutional framework for implementation of ESM of PCBs
A PCBs website is up and running and continuously updated with project activities information: Raising awareness of importance of ESM of PCBs equipment
3.1 Developed PCB Video 3. Deliverables/ successes and show-casing events
3.2 PCB management trainings 3. Deliverables/successes and show-casing events
3.3 PCB brochures, toolkit and handouts 3. Deliverables/successes and show-casing events
3.4 PCB inventories (MEDPOL) 3. Deliverables/successes and show-casing events
3.5 PCB disposal and final destruction (MEDPOL) 900 tons PCB proposed for destruction under the project 3. Deliverables/successes and show-casing events
4 up to date guidelines produced (policy framework, hot spot assessment, pollutant inventories, CBA List of NAP indicators agreed 12 countries planned to be supported ( H2020, GEF and MTF) Strong links with H2020, SCP and EU MSFD PoM What to show: clear pollution reduction milestones and targets, innovation, synergies, ecap streamline! 3.6 NAP update a major policy development with good potential of ‘’show case’’ 3. Deliverables/successes and show-casing events
Thank you for your attention Eliminate PCBs or die! 900 tons will be eleminated by June 2015