SAE J2579 Technical Information Report Fuel Systems in Fuel Cell & Other Hydrogen Vehicles Presented by Phil Horton To Hydrogen Fuel Cell Vehicle Subgroup.

Slides:



Advertisements
Similar presentations
Brian Somerday Sandia National Laboratories Livermore, CA, USA
Advertisements

Japanese Technical Standard for Hydrogen Containers
Craig Webster, P. Eng. Convener – ISO Standard May 6, 2014
Draft Deliberative Document1 of 15 Hydrogen Fuel Cell Vehicle Safety Research to Support Rulemaking/GTR Objectives September 2008 SGS
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
UN-ECE / WP.29-AC3 / HFCV Hydrogen / Fuel Cell Vehicles - Regulations Workshop „prenormative research“ Brussels - 26th September 2005 Workshop “prenormative.
1 MANUFACTURING AND PRODUCTION OF BIOLOGICAL PRODUCTS (ERT 455) HAZARD ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEM Munira Mohamed Nazari School.
May 22nd & 23rd 2007 Stockholm EUROTRANS: WP 1.5 Task Containment Assessment IP-EUROTRANS DOMAIN 1 Design WP 1.5 Safety Assessment of the Transmutation.
Christine Sloane International Conference on Hydrogen Safety Round Table Panel Discussion Pisa, Italy 7 – 10 September 2005.
Helfried Rybin 1 AUTOMOBILENTWICKLUNG / ENGINEERING Safety Demands for Automotive Hydrogen Storage Systems Helfried Rybin.
SQM - 1DCS - ANULECTURE Software Quality Management Software Quality Management Processes V & V of Critical Software & Systems Ian Hirst.
MVFRI 1 Fire Safety of Hydrogen-Fueled Vehicles: System-Level Bonfire Test by R. Rhoads Stephenson Motor Vehicle Fire Research Institute
1 Chemical Process Safety. 2 Outline of Lecture on Chemical Process Safety Inherent Safety Hazard Identification Risk Assessment Fire Protection.
Module 1, Part 1: Introduction and The VMP Slide 1 of 22 © WHO – EDM Validation Supplementary Training Modules on Good Manufacturing Practices.
Hydrogen Fueled Vehicle Global Technical Regulation (GTR) Subgroup Safety (SGS) Nha Nguyen 49 th GRSP Session May Informal document GRSP (49th.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
BRC Food Safety Quality Management System Training Guide
Introduction to ISO New and modified requirements.
1 29 CFR THE CONTROL OF HAZARDOUS ENERGY.
Understanding ISO 22000:2005 TCISys.com.
Transposition of GTR No.13 “Hydrogen and fuel cell vehicles” into UN Regulation - Explanatory material - 20/September/2013 The European Commission and.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
TÜV SÜD Automotive GmbH SGS HFCV, Japan, 24th – 26th September 2008 GTR-Development for H2- and FC-Vehicles a TÜV SÜD - opinion SGS
WHAT IS SYSTEM SAFETY? The field of safety analysis in which systems are evaluated using a number of different techniques to improve safety. There are.
GRPE GRPE CGH 2 Experts (A sub-group of the GRPE Informal Group “Hydrogen/Fuel Cell”) JASIC Presentation At The GRPE CGH 2 Experts Meeting.
BsysE595 Lecture Basic modeling approaches for engineering systems – Summary and Review Shulin Chen January 10, 2013.
Risk Management (“RM”) Program January Risk Management Objectives  Goal of the Halliburton RMProgram is to achieve: - Higher returns on capital.
EU Workshop – RCS on H 2 and FC Technologies for Vehicles Slide no. 1 EU-HarmonHy Workshop, Brussels, 26 September 2005 HyApproval Handbook for Approval.
IAEA - Department of Nuclear Safety & Security
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Multimedia Assessment for New Fuels: Stakeholders’ Meeting September 13, 2005 Sacramento, CA Dean Simeroth, California Air Resources Board Dave Rice, Lawrence.
Product Stewardship: Putting It into Practice GCWellon, Manager, Responsible Care Methanex Corporation June 2010.
Status of SAE FCV Safety Working Group Activities Developing Systems-level Performance- based Standards for Hydrogen and Fuel Cell Vehicles (FCVs) Presented.
Ergonomics Regulatory Requirements Bawan Saravanabawan, Labour Program, HRSDC February 4, 2008.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
DEVELOPING FIRE TESTS FOR FCV AND HYDROGEN VEHICLES Glenn Scheffler Consultant for the US Department of Energy August 2010 DEVELOPING FIRE TESTS FOR FCV.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Application – Identifying, Listing Equipment, and Documentation
PRODUCT STEWARDSHIP Code of Practice GCWellon June 2010.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
NFPA 2 Overview Susan Bershad, Staff Liaison, NFPA.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
Teknologi Pusat Data 12 Data Center Site Infrastructure Tier Standard: Topology Ida Nurhaida, ST., MT. FASILKOM Teknik Informatika.
Recent and future research for the fire safety of hydrogen-fueled vehicles in JARI Appearance of Hy-SEF.
Department of Transportation U.S. DOT National Highway Traffic Safety Administration Research & Development/Studies SGS-1-2.
US – China Symposium on Industry Participation in Standardization 30 May 2007 Dr. Christine Sloane.
What is a software? Computer Software, or just Software, is the collection of computer programs and related data that provide the instructions telling.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
Steve Griffith February 28th, 2017
Electric Vehicles Safety Global Technical Regulation
International Conference on Hydrogen Safety Yokohama, Japan
Continuous Codes and Standards Improvement
Proposal on Drafting Hydrogen Storage System Part of the HFCV-gtr
ROCKET TESTING TYPES OF TESTS
Hydrogen Safety in Transportation:
Informal document GRPE-73-21
JASIC Japan ______ 62nd GRSP Session December 2017
Statistical Product Acceptance
Sandia National Laboratories
Verification and Validation Unit Testing
Instrument PDR Summary of Objectives
Brian Somerday Sandia National Laboratories Livermore, CA, USA
HDV CO2 certification CoP provisions
SAE battery safety standards committee UPDATE January 23, 2019
PLANNING & SCHEDULING (First Part)
Energy Storage Roadmap & Flexibility Roadmap Information Session
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

SAE J2579 Technical Information Report Fuel Systems in Fuel Cell & Other Hydrogen Vehicles Presented by Phil Horton To Hydrogen Fuel Cell Vehicle Subgroup on Safety May, 2008 SGS 3 - 6

Topics Background Summary of SAE J2579 General Structure Guiding Principles Compressed Hydrogen Performance Requirements Key Attributes of SAE J2579 Validation Testing Workplan for Next Steps Summary

Background Work on motor vehicle hydrogen storage system code initiated in SAE Fuel Cell Safety Work Group circa Active participation by fuel cell vehicle and storage system manufacturers and testing organizations, including representation from Asia, Europe and North America. Existing codes including NGV2, EIHP, FMVSS 304 and CSA B51 considered, with focus to develop design-independent performance-based code. SAE J2579 balloted in late 2007 and published as Technical Information Report (TIR) in January Two-year period for evaluation testing and workplan items with goal to publish SAE J2579 as Recommended Practice in early 2010.

SAE J2579 – General Structure 1.Scope 2.References 3.Definitions 4.General Requirements 5.Performance Requirements 5.1 Liquified Hydrogen 5.2 Compressed Hydrogen Appendices A.Pressure Vessel Terminology B.Material Compatibility C.Compressed Hydrogen Qualification Tests D.Rationale for Section 5.2 Compressed Hydrogen Requirements E.Design and Selection of Components F.Conducting Material Qualification Tests G.Compressed Hydrogen System Integration

Verification of Compressed Hydrogen Storage System Performance Probability Demand Distribution (Simulate Exposures in Field) Capability Distribution Hydrogen Extreme Ambient Temperatures Pressure and Temperature Cycles Extended Static Pressure Holds Production and Handling Damage Chemical exposure Penetration and Fire Severity of Exposure

Typical Compressed Hydrogen System Includes all components and parts that form the primary pressure boundary for stored hydrogen Isolates stored hydrogen from -- the remainder of the fuel system the surrounding environment

Principle of “Design for Safety” No single-point failure should cause unreasonable risk to safety or uncontrolled vehicle behavior: Fail-safe design Isolation and separation of hazards to minimize cascading of events Fault management with staged warnings and shutdowns Isolation and containment of stored hydrogen is required to practice fault management on hydrogen and fuel cell vehicles.

Section 5.2 – Compressed Hydrogen Storage System Performance Requirements Expected service performance test sequence (pneumatic pressure cycling) Durability performance test sequence (hydraulic pressure cycling) Performance under service-terminating conditions

Expected Service (pneumatic) Production Proof Pressure 25%cy -40 o C a 25%cy +50 o C b,c 125%NWP Expected-Service Performance Verification Test 180%NWP 30 sec 150% NWP 500hr +85 o C 500hr +85 o C 25%cy +50 o C 25%cy -40 o C 125%NWP a System -40 o C 5cy +20 o C fuel; 5cy <-35 o C fuel b System +50 o C 5cy <-35 o C fuel c Service defuel rate >50cy *** Pressure  Leak/Permeation time Burst <20% %NWP Leak/Permeation

Durability Performance (hydraulic) #Durability Cy 125%NWP 30 sec 180%NWP 10cy T amb 150%NWP Durability Performance Verification Test % NWP Proof Pressure Pressure  Flaws & Chem Drop time burst burst <20% 48hr 125%NWP

Service Terminating Conditions BonfireNo burst & controlled PRD release PenetrationNo burst Burst Pressure Cycle Life Manufacturer will establish new-vessel burst pressure and cycle life criteria

Key Distinctions from other Pressure Vessel Codes System-level performance code that is independent of storage system design. Uses two sequences of tests (expected service and durability performance) rather than discrete testing of virgin tanks. Specifies end-of-life (EOL) burst margins rather than beginning-of-life (BOL) burst margins. In addition to requiring EOL burst margin to be at least 1.8 times maximum working pressure, also requires EOL burst pressure to be at least 80% of virgin-tank burst pressure. Includes pneumatic cycling and sustained stand time (in expected service sequence).

| Presented by Livio Gambone, P.Eng. SAE J2579 TEST PROGRAM Results Update > Powertech Labs

Project Background

Test Plan

Workplan for 2008 and 2009 Complete validation testing, and revise SAE J2579 as appropriate based on findings. Develop localized fire test procedure(s) and performance criteria for possible inclusion in SAE J2579. Consider refinements to specific provisions based on additional data analyses: Permeation requirements Number of pressure cycles Hold times and temperatures Criteria for redesign not requiring re-qualification. Re-qualification for additional service. Criteria for allowing parallel (versus series) performance testing.

Summary SAE J2579 provides performance based system level requirements to assess hydrogen storage safety while also facilitating future improvements in technology. Validation testing scheduled for completion during Pending successful completion of validation testing, SAE J2579 should be considered as basis for hydrogen storage portion of FCV Global Technical Regulation.