The Mark II Vertex Detector A Perfect Detector for an Imperfect Collider Chris Adolphsen, SLAC, 3/31/2012.

Slides:



Advertisements
Similar presentations
Fast and Precise Beam Energy Measurement at the International Linear Collider Michele Viti.
Advertisements

X. X September Mo Tu We Th Fr Sa Su
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
For high fluence, good S/N ratio thanks to: Single strip leakage current I leak  95nA at T  -5C Interstrip capacitance  3pF SVX4 chip 10 modules fully.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
A Drift Chamber System for muon tomography Jo Pater and Roger Barlow Applied Nucleonics Forum Teesidel March 1 st
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
Sensors for CDF RunIIb silicon upgrade LayerR min (cm)1 MeV eq-n cm * * * * * *10.
Chicas, este calendario si es pa' nosotras !!!!!.
Drift Chambers Drift Chambers are MWPCs where the time it takes for the ions to reach the sense wire is recorded. This time info gives position info:
You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation. If you’d like to change.
2007 Monthly Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
T0 status1W.H.Trzaska HIP Jyväskylä Status of T0 project ALICE Comprehensive Review IV March 23, 2004.
September 2008 SundayMondayTuesdayWednesdayThursdayFridaySaturday
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
Status of Hamamatsu Silicon Sensors K. Hara (Univ of Tsukuba) Delivery leakage current at 150V & 350V number of defect channels wafer thickness & full.
Electron Detection for Compton Polarimetry Michael McDonald Outline -Compton Effect -Polarimetry -Detectors -Diamond Results.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
The End Station Test Beam (ESTB) at SLAC Carsten Hast For the everlasting never giving up SLAC Test Beam Gang R. Erickson, T. Fieguth, C. Hast, J. Jaros,
Refurbished Booster RF John Reid December 12, 2012.
The 21st International Conference on Ultrarelativistic nucleus-nucleus collisions, March 30 – April 4, Knoxville, TN Results from cosmics and First LHC.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
EIC Compton detector update October 24 th 2014 Alexandre Camsonne.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
BeamCal Electronics Status FCAL Collaboration Meeting LAL-Orsay, October 5 th, 2007 Gunther Haller, Dietrich Freytag, Martin Breidenbach and Angel Abusleme.
Report to LCFI Oversight Committee, January 2007 ■ Introduction – towards the ILC ■ Some international VXD developments ■ Progress with LCFI sensor development.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
FIRST RESULTS OF THE SILICON STRIP DETECTOR at STAR Jörg Reinnarth, Jonathan Bouchet, Lilian Martin, Jerome Baudot and the SSD teams in Nantes and Strasbourg.
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
ICT 1 SINTEF Edge-On Sensor with Active Edge Fabricated by 3D-Technology T. E. Hansen 1), N. Ahmed 1), A. Ferber 2) 1) SINTEF MiNaLab 2) SINTEF Optical.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
NUMI Primary Beam Review August 14, 2001 NUMI PRIMARY BEAM INSTRUMENTATION Multiwires, Loss Monitors, Toroids Gianni Tassotto.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
LumiCal High density compact calorimeter at the ILC Wojciech Wierba Institute of Nuclear Physics PAS Cracow, Poland.
CRYSTALS AS LONG-TERM IMPROVEMENT FOR LHC COLLIMATION
Tracking detectors/2 F.Riggi.
 Silicon Vertex Detector Upgrade for the Belle II Experiment
T980 STATUS AND CHANGES FOR
Simulated vertex precision
John T. Seeman DOE PEP-II Operations Review April 26, 2006
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
A Silicon-Tungsten ECal for the SiD Concept
Preparation of the CLAS12 First Experiment Status and Time-Line
Bubble Chamber – Beam Requirements
End Station Test Beam (ESTB) at SLAC
McDonald’s Kalender 2009.
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
McDonald’s calendar 2007.
J. Seeman Assistant Director for PPA/LCLS
FACET Accelerator Overview
Proud As A Peacock! We are very proud of__________________
Teacher name August phone: Enter text here.
Summary of Washington DOE Review
MEG II実験 液体キセノン検出器の建設状況
FACET Accelerator Overview
McDonald’s calendar 2007.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

The Mark II Vertex Detector A Perfect Detector for an Imperfect Collider Chris Adolphsen, SLAC, 3/31/2012

* NIMA, Volume 313, Issue 1-2, p , March 1992 Many thanks for editing this 40 page paper !

Detector Properties First Use of Silicon Strip Technology in a Colliding Beam Detector

SSVD Layout

Detector Layout Hamamatsu 4 Inch Wafer Technology

Microplex Chip – Enabling Technology (128 channels on a 4.7 by 6.4 mm chip)

SLAC Beam Line Sept, 1986 Microplex Patent

Min. Ionizing Particle Detection Resolution ~ 4 microns

Much Testing and Development Microplex chip qualification Radiation damage studies (chip good to 10’s of krad) Electronics to compensate radiation damage Detector leakage current and depletion voltage meas. Support structure design Optical alignment during SSVD assembly X-ray alignment after assembly In-situ global alignment with capacitors X-ray and light calibration of detectors Cable and BADC testing

Detector Alignment with an X-Ray Beam Vary angle and position of collimated X-ray beam in each detector to determine its position and orientation relative to others (few micron accuracy)

Staring Intently at the Detector to Ensure Optimal Performance

Ready to Go

SLC April 11, st Z detected by Mark II October, Task force disbanded Mark II had ~ 500 Zs LEP had begun physics in September, 1989 Loma Prieta earthquake December, SLC ‘White Paper’ Breidenbach, Burke, Himel, Paterson, Ruth, Seeman, Sheppard 1991 … will be the first full year of physics running with the new detector, the SLD. The integrated luminosity goal for 1991 is 10 5 Z particles with polarized electrons. August, Program Coordinator (NP) balance conflicting Mark II/ PEP/ SLD needs November, Mark II Run ended Record day was 15 Zs on tape PEP physics program terminated January, year freeze - December 23, 1990 SLC Steering committee formed From Nan Phinney’s History of the SLC SSVD and the Drift Chamber Vertex Detector installed Only ~ 300 Z’s recorded with the SSVD before the SLD detector (with CCDs) installed

The SSVD Works Beautifully

Indentifying Displaced Vertices

2011 PDG: Rb = / Physics at Last (Conclusion from Bob Jacobsen’s Thesis in 7/91)