Wide area SPS for Integrating SR with national grid Approach Document prepared by.

Slides:



Advertisements
Similar presentations
Advanced Energy Conference New York, NY October 31, 2012
Advertisements

Central Research Institute of Electric Power Industry D2-01_24 Prototype and Evaluation of Communication Network for a WAMPAC System Based on International.
Marianna Vaiman, V&R Energy
Washington DC October 2012 A Vision for an Advanced Supervision and Control System for the Electric Grid Ramón A. León XM S.A. E.S.P Colombia.
and Trend for Smart Grid
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
Synchrophasors: Improving Reliability & Situational Awareness
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Integrating Multiple Microgrids into an Active Network Management System Presented By:Colin Gault, Smarter Grid Solutions Co-Authors:Joe Schatz, Southern.
Substation Automation (S.A) System Project Supervisor: Stuart Wildy.
Team Dec13_11: Cole Hoven Jared Pixley Derek Reiser Rick Sutton Adviser/Client: Prof. Manimaran Govindarasu Graduate Assistant: Aditya Ashok PowerCyber.
Duke Energy Carolinas Smart Grid Investment Grant Tim Bradberry Tim. NASPI Work Group Meeting October 12-13,
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
Wide Area Protection (WAP) for a Major Load Center using a Fast Load Shedding Scheme By Victor Wong General Manager, Power Transmission Sarawak Energy.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
SGOC-UCI Smart Grid Focused Use Cases for Transmission and Distribution Operations Nokhum Markushevich Smart Grid Operations Consulting (UCI associated)
Operational Experience of system Protection Scheme of Talcher – Kolar HVDC Link.
1 If I were to give grades today… > 80A A B B B C C C D D D-1
Supervisory Systems.
Advanced Phasor Measurement Units for the Real-Time Monitoring
Review of BPA Voltage Control Conference
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
SCADA FOR WATER DISTRIBUTION IC DEPT. GECGn SEC28.
Jay Britton
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
1 Some Issues about Big Data in Power Grid Gary Quan.
College of Engineering and Architecture Using Information to Increase Power Reliability and Reduce Vulnerability Anjan Bose Washington State University.
Adaptive Protection of Distribution Feeders Alexander Apostolov, Benton Vandiver.
Synchrophasor: Implementation,Testing & Operational Experience
11 PMU simulation and application for power system stability monitoring Harmeet Kang Areva Technology Centre – Stafford, UK Sept MOSCOW.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
V&R Energy’s Project under PRSP: Grid Operator’s Monitoring & Control Assistant (GOMCA) Marianna Vaiman, V&R Energy JSIS Meeting.
1 Application of Synchrophasor Technology To CREZ System CREZ Technical Conference January 26, 2010 Navin Bhatt American Electric Power.
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
Power Application Software UPDEA - Workshop. What are Power Application Tools? Name as many of the Power Application Tools as you can Power Application.
SUMMARY Introduction System Protection Philosophy
CASE STUDY Disturbance event comparing PMU and SE voltage angle difference in ERCOT Prakash Shrestha Operations Engineer Advanced Network Application.
For 11kv substation network using technology Devices World Sdn Bhd.
1. U.G.ZALTE, EX-DIRECTOR (OPERATIONS) –MSETCL, A.R. KULKARNI. DATE: NOVEMBER 2013 CIGRE TUTORIAL AND COLLOQUIUM ON SMARTGRID MYSORE, KARNATAKA.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Situational Awareness UPDEA - Workshop. Awareness of the Situation 25,623 Alarms in 8 Hours 53 Alarms / min (average) 80% Are consequential Things to.
Overview of Real Time Grid Reliability Management Carl Imhoff Pacific Northwest National Laboratory January 27-29, 2004 Washington, D.C. Transmission Reliability.
1 Stability Issues in Entergy System Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
NERC Lessons Learned Summary LLs Published in September 2015.
Demand Response Analysis and Control System (DRACS)
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
1 Dr.Wang Yingtao Engineer Power System Department CEPRI,China Nov 2006 R&D OF REAL TIME DYNAMIC MONITORING SYSTEM IN CHIHA.
PS ERC EC Meeting Systems Stem New Research Initiatives.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Lessons Learned Implementing an IEC based Microgrid Power-Management System October 12, 2015 Presented by: Jared Mraz, P.E.
2017 WECC JSIS Report March 21, 2017.
ISO-NE Synchrophasor Related Projects
IG BASED WINDFARMS USING STATCOM
Selected ICT-based Wide-Area Monitoring Protection and Control Systems (WAMPAC) applications
Challenges of integrating Variable Renewable Energy Sources (V-RES)
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
Presented by: LADWP November 14, 2017
Peak online TSAT Implementation Update
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
Peter Erning, PSP-T11, Power Gen 2010
EU-IPA12/CS02 Development of the Renewable Energy Sector
A Distributed Two-Level PMU-Only Linear State Estimator
Peak’s Synchronized Measurements and Advanced Real-time Tools (SMART) Working Group (initiated in Oct-2017) Focus on operationalizing Synchrophasor tools.
NASPI PMU Data Application Classification
2017 WECC JSIS Report March 21, 2017.
WISP Follow on Reporting.
NASPI PMU Data Application Classification
Presentation transcript:

Wide area SPS for Integrating SR with national grid Approach Document prepared by

Indian grid

Problems that might arise Transmission of system events to SR regions New congested transmission corridors Load encroachments and power swing Protection malfunction(Zone-3 philosophy may fire back) Inadequate reactive power compensation at right node may leading to voltage collapse Local SPS may be inadequate during remedial actions Island from WR on instability to safeguard SR

Possibilities remedial or preventive Redirect power flows by HVDC ramping Ensuring primary frequency response from generators PSS tuning for power swings TCSC, SVC for reactive power compensation Supervisory control on Zone-3 protection Tripping Integrate existing schemes for control actions

Solution Enhanced situational awareness based on PMU + Applications(OMS, VSM) Centralized RAS Controller Logic building, Arming, Triggering from SRLDC Online power system network evaluation TSA for contingencies

Proposed Solution Centralized RAS

Proposed System architecture Sync 2101 PMU Substation-01 Substation-02 Substation-03 PDC Telecom Network (Breaker status UFLS,UV etc) Open Command & Over ride signal to IED (Breaker status UFLS,UV etc) Open Command & Over ride signal to IED Tables,Triggers,GOOSE G G G G G G IEC 61850C Adapter eDNA Historian Substation-04 Historian PDC Visualization & Reports SPS User interface Telecom Network

Power Apps(power flow data base) Data from eDNA (Angle,V,MW,MVAr,Hz) DATA from SCADA (Status,MW.MVAr,V,I) SPS tables (Set1,Set2,Set3) Triggers & Events (network tie line trippings-1-5, Over loading, Oscillations) Improved State estimation using Phasor data Power flow engine(Simulate Events and evaluate each SPS action tables) Boundary limits (Voltage,angle,MW.MVAr,I,Hz, angle) Transient Analysis engine(For all events) Model Verify the results with boundary condition and rank SPS action table based on no. of violation and severity High & Low Limits (Angle,V,MW,MVAr,Hz)

SPS action evaluation Sl.NoSPS availability EventSPS evaluated Violations identifiedRank 1YESContingency-1SPS-1Total 20 violation & 10 critical violations 5 2YESContingency-1SPS-2Total 10 violation & 5 critical violations 4 3YESContingency-1SPS-3Total 5 violation & 3critical violations 2 4YESContingency-1SPS-1 &2Total 5 violation & 1critical violations 1 4YESContingency-1SPS-1 & 2 &3 5 critical violations3

Output of analysis Trig- 1(contin gency-1) Trig- 2(contin gency-2) Trig3 (conting ency-3) Trig 4(contin gency-4) Trig5 (conting ency-5) Trig6 (contin gency- 6) SPS-1 SPS-2 SPS-3 SPS-4 SPS-5 SPS-6 SPS-7 SPS-8 SPS-9 SPS-10

PDC with logic builder C PMU-1 Logic Builder (PMU1.A ngle- PMU2.An gle) Angular instability triggers IEC61850 Goose trigger manger Centralized trigger generation PMU-2 PMU-n RTU-2 Sync2101 RTU-1 (Sync2101) IEC client Logic Builder RTU1.Stat us & RTU2.Stat Multiple transmiss ion line trip Analog data RTU-3 Sync2101 SPS Selection Status change SPS Selection SPS-local

Sync 2101(Trig manger node) Status change Trigger external SPS action-01 SPS action-02SPS action-03SPS action-04 Status Change Inputs/external trigger SPS RTU(existing) SPS scheme interface (Sync 2101)

Approach System events and severity analysis (eg: interconnection failure, interconnecting transmission overloading, power import, export, contingency ranking, voltage critical buses, VP- VQ curves. System study for identifying subsets of the network which can maintain under disturbance. Done through load flow studies, transient stability analysis, voltage stability analysis using state estimation output and pre-defined contingency set. Analyzing communication requirement. Utilizing PMU data for better islanding & state estimation. On line contingency evaluation using power system tools for deriving remedial actions.

As is Study Data collection: Details of Generating stations & substations with in the area. Collection of the state estimation outputs in IEEE format for several possible operating scenarios, peak load, light load, summer load, winter load etc. Identification of sustainable operational areas with in SRLDC. Identification of operational subsets (load pattern and generation availability) Identifying number of substations & feeder to be involved in system operation. Communication medium and latency analysis. Contingency study involving load flow, static contingency, dynamic contingency, voltage stability, OPF solutions. Islanding scheme derivation(UF,UV,df/dt,dv/dt). [done through transient stability analysis based on state estimation outputs and specified contingencies] Utilizing PMU data for analysis [Done through enhanced state estimation, valid only if there are significant measurements from PMU]

List of use cases/contingencies 1.Centralized operation 1.Centralized manual trigger(Operator driven) 2.Transmission line overloading(PMU based) 3.Islanding (Manual/OMS trigger) 2.Automatic 1.Line trips, Gen trips(Breaker trips) 2.SPS specific backup Protection trip (UF/OF,OV/UV)

PMUs Flow control with WR HVDC Asynchronous link Synchronous link Centralised SPS for flow control with WR

PMUs SPS for individual transmission lines PMU data sets available

PMUs Relays available for pilot Path Dynamics for better understanding of the system Internal pool External pool

PMUs SPS for flow gates Power flow Major transmission line corridors(inte r states) Nellore – Alamanti chittor – sriperumbato re Kolar-klvdpt Somnahalli –salem Kolar - Hosur 1&2 AP TN KAR

Challenges Modeling of the network Integrating with existing SCADA system for real-time measurements Faster communication medium Simultaneous action of through out the geography (execution of commands in same time) Transmission of GOOSE over WAN

KALKITECH’s experience Cell controller project For energynet.dk -Denmark(the project includes islanding and load balancing automatically during contingencies, this includes powerplants,CHPs & wind turbines) Emergency control schemes for Power intensive metal industries, refineries and petrochemical industries(800 to 400 MW plants to be stabilized during grid failures while power import & exports,schems includes, fast load shed and gen shed and synchronization controls) EMS for Bhutan Power Corporation (Network Topology Processor, Load Flow, Short Circuit Studies, Transient Stability Studies with Power Apps ) PMU based WAMS Pilot Project at SRLDC Working on PGCIL NTAMC project for RAS and AFAS We were consultants for Qatar Petroleum for HV SCADA implementation with IEC61850 SAS for their 33 kV distribution network Development experience on OMS and VSM with WSU Partnership With eDNA on Time-Series Historian Participation in NASPI / IEEE

Advantage of KALKITECH Centralized RAS Experience in power system dynamics and islanding implementation In House PDC / WAMS/SPS Application Expertise, both in Power System Algorithms, Communication Systems and Protocols. Rugged and versatile RTU (Sync 2101)for data acquisition and control action Strong Integration and Inter-Operability Experience Strong R&D and Product Partnerships with IIT Mumbai, WSU and Time Series Historian Companies. Open Interface for application / visualization / analytics development Distributed & Scalable architecture, with a centralized web-based Visualization server and a Distributed PDC structure