REGENERATION ISSUES Institute for Energy and Transport Joint Research Centre B. Giechaskiel, J. Andersson, G. Martini 3 April 2014.

Slides:



Advertisements
Similar presentations
Refining Crude Oil The cat-cracking process breaks up heavier fuels. Diesel fuel and heating oil are the product of severe catalytic cracking and want.
Advertisements

Reducing harmful emissions while protecting Fleet Investment.
PMP: SUB 23 NM MEASUREMENT RECOMMENDATIONS B. Giechaskiel, G. Martini Institute for Energy and Transport Joint Research Centre 3 April 2014.
PN emissions from Japanese engines with catalyzed DPF system - Effect of Cycle Exhaust Temperature Prepared for 2009/3/30 PMP-WG MEETING JASIC.
The DG Tren ” Particulates „ project Zissis Samaras Lab of Applied Thermodynamics Aristotle University Greece.
PM EMISSIONS FROM TYRES AND BRAKES MAIN FACTS AND OPEN ISSUES Sustainable Transport Unit Institute for Energy and Transport Joint Research Centre 04 April.
Particle Measurement Programme Informal Working Group (PMP) Progress Report and Next Steps Giorgio Martini Sustainable Transport Unit.
Institute for Energy and Transport B. Giechaskiel, G. Martini
1 Biodiesel Fleet Test - B5 RANGER PROJECT Leandro H. Benvenutti Fuels & Lubricants - Ford Motor Company Brasil June 10, 2008.
Vehicle pollution control
Performance and Emission Analysis on Oxygen Enriched variable
Revisions To Heavy Duty Validation Report General Numerous clarifications to text as requested at December meeting Partial flow systems referred to consistently.
Particle Measurement Programme (PMP) Progress update
GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
PMPN Report to WLTP DTP 16 Jan 2013 Prepared by Caro Hosier Post 14 and 15th WLTP PMPN Meetings audio / web conferences.
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 7 th DTP Meeting Bern 12 th – 14 th September 2011 Chris Parkin.
PMP Progress Report Activities since GRPE 58 Heavy Duty Validation testing Exercise completed in October Draft report and draft proposal to insert PN measurement.
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 5 th DTP Meeting Dubendorf 12 th – 14 th April 2011 Chris Parkin.
3rd International Conference LUBRICANTS RUSSIA Diesel Particulate Filter Regeneration Strategy and its Influence on Engine Oil Characteristics Luca.
WLTP - 5h DTP Meeting Zuerich DTP Subgroup LabProcICE slide 1 LabProcICE issues on DTP level Zuerich, April 2011.
Concawe Nanoparticles from road vehicle exhaust: an artefact or a reality? Diane Hall BP/CONCAWE Lemnos Meeting: Round Table Discussion 11 th September.
Diesel Fuel Quality and Sulfur Effects on Catalyst-Based Exhaust Emission Controls: Manufacturers of Emission Controls Association May 2000.
Assessment Criteria for the Acceptability of Cycle and Testing Procedure Informal working document DTP Subgroup LabProcICE slide 1 Assessment Criteria.
PMP: SUB 23 NM REVIEW B. Giechaskiel, G. Martini Institute for Energy and Transport Joint Research Centre 8 January 2014 GRPE-PMP
GRPE 71 ST SESSION PMP INFORMAL GROUP PROGRESS REPORT TO GRPE 8 Jan 2015 Informal document GRPE st GRPE, 8-12 June 2015,
ACEA PM-3 programme Caroline Hosier, Pilot, ACEA Task-Force Particulates (TF-PM) Ford Motor Company Draft presentation to GRPE Informal document No. GRPE-52-9.
Shaping the Future Exhaust After Treatment Systems.
Deliverable 10 Contents  Vehicles/engines  Diesel passenger cars  Gasoline (PFI-DISI) passenger cars  Diesel heavy duty vehicles  Diesel heavy duty.
37 TH PMP MEETING Institute for Energy and Transport Joint Research Centre B. Giechaskiel, G. Martini 7 Oct 2015.
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 38th UNECE IWG PMP MEETING Exhaust emissions.
JRC 30 March Particle Measurement Programme Exploratory work & Validation Exercise (JRC) First Validation Exercise comparisons B. Giechaskiel, G.
Questions on cycle representativeness (French position) EU – WLTP 17 th of September 2013.
25 January 2016 European Commission - Joint Research Centre (JRC)
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 72th UNECE GRPE session PMP IWG Progress Report.
RDE PN-PEMS programme Progress Update F. Riccobono, B. Giechaskiel, P. Bonnel STU, IET, JRC, European Commission.
© A.T.T.S. Inc I/M Solutions 2012 Diesel Training What Works? What Doesn't? Jerry “G” Truglia.
© 2005 Northeast States for Coordinated Air Use Management (NESCAUM) Advanced Mobile Source Training Course MS Diesel Section V Planning for the.
Reduce Your Carbon Footprint BluSky Nanofuel. Company founded Christopher Williams Ecommerce platform serving municipalities (Amazon to agencies) Disabled.
Submitted by the expert from Japan the secretariat
Diesel Exhaust Emissions
Technologies for low emission light duty powertrains
PMP IWG Progress Report
PMP Heavy Duty Validation Exercise
Particle Measurement Programme - Report
Technologies for low emission light duty powertrains
Institute for Energy and Transport B. Giechaskiel, G. Martini
Preliminary results of the OEMs HDV PN-PEMS validation study
76th UNECE GRPE session PMP IWG Progress Report
Exhaust Emissions Light Duty-PMP-2017/2018 Sub23nm Round Robin
Light Duty-PMP-2017/2018 Sub23nm Round Robin
PARTICULATES PROGRAM WP500
WLTP DTP PM-PN Subgroup Activity Report
Diesel Engine Catalyst Deactivation/Ageing
HD ENGINE RAW PN MEASUREMENT
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans
Exhaust Emissions Light Duty-PMP-2017/2018 Sub23nm Round Robin
Lemnos 11/9/03 Comparison of PM exhaust emissions measured at a chassis dynamometer and on-road chasing on a test track.
Inter-Laboratory Comparison Exercise CPC CALIBRATION
Diesel Particulate Filters
Emissions testing in the laboratory and on the road: Preliminary results for one Euro 6 diesel vehicle Pierre Bonnel Martin Weiss Joint Research Centre.
Gasoline Engine Catalyst Deactivation/Ageing
Gasoline Engine Catalyst Deactivation/Ageing
PMP – PN sub 23nm Route to transfer from ‘in case of urgent need’ into planned delivery into regulations PMP-48 Presentation from Technical Secretary.
Francesco Riccobono, Barouch Giechaskiel, Pierre Bonnel
PN-PEMS Progress update
Accelerated aging procedures for pollution control devices
PN Counting from Raw Exhaust via Fixed Dilution and PMP Round Robin Project JRC and ACEA.
Current status All European laboratories (except 3rd JRC measurement) have conducted their measurements Equipment finally returned to JRC US, Japanese.
PMP INFORMAL GROUP Exhaust particle emissions – progress report
ACEA and JRC PMP meeting 7/11/2018
Presentation transcript:

REGENERATION ISSUES Institute for Energy and Transport Joint Research Centre B. Giechaskiel, J. Andersson, G. Martini 3 April 2014

Overview Legislation Heavy duty R-49 Light duty WLTP Literature survey / Past experience PN emissions / Robust protocol Pre-conditioning procedure / effect on repeatability Open issues Next steps

Legislation GTR 4, Regulation 49 (Heavy duty) Continuous  Oxygen with temperatures >550°C  NO 2 with temperatures >250°C Declared regeneration conditions (soot load, temperature, exhaust back-pressure) At least 3 WHTC with regeneration, emissions within 15% Periodic  in cylinder or post injection exhaust  active heating Measurement during regeneration, (before and after). Number of cycles between regenerations Alternatively emission within 15% between regenerations then 1 test

Legislation (Light Duty, WLTC) Continuous (no special procedure) Periodic Single regenerative system Multiple periodic regenerative system Procedure If emissions during regeneration below limit not necessary If emissions between regeneration events within 15%, Type I value can be used Otherwise arithmetic mean of equidistant Type I tests. At least before and after regeneration. Loading with WLTC

PMP robustness No issues with PMP systems (eg due to high temperatures) Indications for volatile artifact below 23 nm, especially below 10 nm Mamakos et al. 2011, PMP Zhang et al. 2012

PMP robustness Confirmation of volatile artifact below 10 nm Between 10 and 23 nm no clear indications of volatile artifact No immediate need to move below 23nm Monitoring advisable Giechaskiel et al. 2014, PMP 30 CVS PCRF 100x10 Tailpipe: PCRF 15x15

PCRF selection PCRF at least 1000 (PND1>100) Sulfuric acid might re- nucleate Important not to grow to >10nm HCs at inlet of PND1 For sub10nm even higher PCRF is needed Yamada 2013

Background Tailpipe: PCRF=225 PN=3.3x10^9 p/km CVS: PCRF=1000 PN=5.5x10^9 p/km

Ki factor NEDC Golden vehicle: Negligible increase Cold start very high emissions EUDC higher but over 1000 km negligible effect WLTC or CADC: DPF1: Msi=1x10^11 (D= km), Mri=4x10^12 (d=8.2 or 23.2)  Mpi= x10^11 p/km, Ki= DPF2: Msi=2x10^10 (D= km), Mri=2x10^12 (d=8.2 or 23.2)  Mpi=<1.4x10^11 p/km, Ki=4-7 With Msi=2x10^9  Mpi=<1.4x10^11, Ki=35-65 or Ki~Mpi (offset method) Emissions always below 6x10^11

DPF 3 Msi=5x10^9 p/km (D=300 km), Mri=7x10^12 p/km (d=23.2) Mpi=5x10^11 p/km, Ki=100

Nature of particles Probably soot due to the decreased efficiency of the filter as it regenerates Metal from fuel additives and lubricant cannot be excluded Heavy molecular hydrocarbons that do not evaporate at 350°C and residence time s. Mamakos et al. 2013

Open issues High temperatures Release (volatiles, ash) from DPF Higher penetration of DPF Ash that was previously attached on the soot Release from tubes due to high temperatures More porous DPFs Loading might affect nature of deposited material

Loading of DPF / Pre-conditioning WLTC  Frequency? DPF fill status affects filtration efficiency and repeatability Difference for small – large engines Andersson et al. 2007, PMP report Yamada 2013

Pre-conditioning (setup) No studies discussing effect of sampling system preconditioning However there could be an effect from contaminated tunnels Dobes et al. 2011, Vienna symp. Recommendation: 120 km/h >20 min

Durability Light-duty Diesel vehicles with DPF are durable and effective to at least km (AECC 2006) VERT procedures at least 2000 h Accumulation of ash: Release during regeneration

GPF GPFs will experience different temperatures Passive regeneration very likely Mamakos et al. 2013

GPF Lower efficiencies are needed More porous DPF are possible (Eff >50%) Mamakos et al. 2013

Partial Filters Still high efficiency for <23nm No special issues for sub23nm particles Heikila et al. 2009

Summary Protocol: PCRF >1000 for regenerations Measurement of >10nm in parallel Absolute PN levels should be monitored for many vehicles Recommendations for WLTC exist Preconditioning Setup: Ensure no desorption from vehicle, transfer tube Loading of DPF / GPF Continuous systems: DPF fill state (repeatability) Periodic system: Extremes: Small – Large vehicle

Discussions slides

Areas for investigation Targets (testing) Test many vehicles Euro 6+ Confirm robustness of PMP Confirm weighted emissions do not exceed limit Ki factor, Frequency Levels of emissions during regeneration

Areas for investigation How (measurement protocol) >23nm and >10nm, PCRF >1000 (PND1>100) Looking for differences >50% System with Catalytic stripper in parallel if possible Addition of a system at the tailpipe (for pre-con study) Organics, sulfates, nitrates, ammonium if possible (at least for regeneration tests) Pre-conditioned (clean) tunnel, pipes etc. At least the temperature that will be experienced Recommendation: Gasoline vehicle at high speed eg 130 km, no low particle concentration measured by VPR For measurements below 10 nm see ‘Sub23nm’ presentation For nature of sub23nm particles see report

Areas for investigation Special attention on the following: LNT: Stored sulfates etc… FBC: Solid sub 23 nm (needs robust protocol) SCR: Formation of solid particles, desorption of material SCRF: Similar with SCR GPF: Different filtration efficiency DPF with SCR coating Hybrids

Areas for investigation Extra tests Prolonged high speed operation /lean spikes (Gasoline) Fuel shut off: <23nm metal oxides from ash, oil (Gasoline) Pre-conditioning effect on fill state / emissions levels GPFs need more info Monitoring of background / Effect of regenerations

Collection of data Euro 6 testing from OEMs (NEDC data) JRC can test if Euro 6 available (focus on WLTC) Preparation of a test plan/protocol Info from OEM (e.g. when regen is about to start) Investigation of worst case (e.g. high loading with Granny cycle) Loading effect: without passive regeneration vs WLTC loading (focusing on Gasoline)