1 ILE Project Integrated Logistics Environment Kickoff Meeting Subtask 1.2 Sharing Structural Design Data with Manufacturing Systems Presented by: Michael.

Slides:



Advertisements
Similar presentations
Database Planning, Design, and Administration
Advertisements

XML/EDI Overview West Chester Electronic Commerce Resource Center (ECRC)
22000 Food Safety Management Systems
Implementing ISO Aleta Vienneau and David Danko ESRI.
Lecture Nine Database Planning, Design, and Administration
Process, Communication, and Certification Padma Venkata
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Iowa Transcript Center File Format Validation Process.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
Ship Common Information Model (SCIM)
The BIM Project Execution Planning Procedure
2 Apr ‘08 1 DDG 1000 Logistics Data and Structure DDG 1000 Design Data and Structure Link between design and logistic data Current Logistics data import.
Chapter 9 Database Planning, Design, and Administration Sungchul Hong.
Database System Development Lifecycle © Pearson Education Limited 1995, 2005.
Overview of the Database Development Process
Interim SCIM and STEP Implementation 2008 NSRP System Technology Panel Project Ted Briggs, Intergraph Corp. Mike Olson, Northrop Grumman Information Systems.
Reuse and Data Module Code Naming Considerations Mike Olson, Northrop Grumman IT Ted Briggs, Intergraph Integrated Shipbuilding Environment (ISE) ISE-6.
Agenda  Contract issues?  Review AP 214 Linkage mechanisms  Review external reference mechanisms  Populate PDM schema  Next Steps.
GTRInewFormat.ppt-1 Electronic Systems Laboratory TMC Operator Requirements and Position Descriptions, Phase 2, Kickoff Meeting Presented by Dennis J.
TDT4252/DT8802 Exam 2013 Guidelines to answers
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
Best Practices By Gabriel Rodriguez
NIST Special Publication Revision 1
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Integrated Logistics Environment (ILE) NSRP Joint Panel Meeting 7 – 9 December 2010 New Orleans, LA 1 Presented by: Michael Olson Northrop Grumman Technical.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Army Net-Centric Data Strategy Center Of Excellence (ANCDS) Army Data Harmonization and Integration Working Group (ADHIWG) Sever Ciorlian ANCDS Team Lead.
27 Apr ‘06 1 Integrated Shipbuilding Environment (ISE) Overview April 27, 2006.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Location:Mystic Marriott Hotel Groton, CT Date:Thursday, June 17, 2010 Overview Presented.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
1 Integrated Logistics Environment (ILE) Project Presented by : Dr. Burton Gischner Date:May 3, 2011 NSRP Joint Panel Meeting San Diego, CA.
2 Apr ‘08 1 DDG 1000 Logistics Data and Structure DDG 1000 Design Data and Structure Link between design and logistic data Current Logistics data import.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Task 2 Completion of the Ship Common Information Model Presented by: Dr. Burton Gischner.
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
Accessing Data Using XML CHAPTER NINE Matakuliah: T0063 – Pemrograman Visual Tahun: 2009.
Label Design Tool Management Council F2F Washington, D.C. November 29-30, 2006
Object-Oriented Software Engineering using Java, Patterns &UML. Presented by: E.S. Mbokane Department of System Development Faculty of ICT Tshwane University.
Interim SCIM and STEP Implementation 2008 System Technology Panel Project Ted Briggs, Intergraph Mike Olson, Northrop Grumman Ron Wood, Northrop Grumman.
Implementing Parametric CAD in STEP ???? Kenneth E. Wolsey May 16, 2007
2008 EPA and Partners Metadata Training Program: 2008 CAP Project Geospatial Metadata: Introduction Module 1: Introduction & Overview of the FGDC CSDGM.
ISE4 Alternate Demo Scenario Incorporates suggestions B. Kassel, S. Gordon, & B. Gischner with input from: T. Briggs and S. Moore May 23, 2005.
7 Aug Integrated Shipbuilding Environment (ISE) ISE-6 Phase 2 DDG 1000 TDWG Collaboration Data Module Code (DMC) Naming Overview.
ISE 6 Phase 2 Demo Scenario Sept 11, 2008 NSWC CD.
ISE6 Demo Scenario From 8/30/2007 Telecon. 8/30/2007 ISE6 Demo Scenario 2 Demonstration Core idea: –Use of PLCS enables: Maintaining the right configuration.
1 Registry Services Overview J. Steven Hughes (Deputy Chair) Principal Computer Scientist NASA/JPL 17 December 2015.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Plan Discussion For further information, contact Joe Zhou Team Lead
Metadata By N.Gopinath AP/CSE Metadata and it’s role in the lifecycle. The collection, maintenance, and deployment of metadata Metadata and tool integration.
Welcome and Introductions 1 Ron Wood ILE Kick-off Meeting on June 17, 2010 Technology Investment Agreement (TIA): Integrated Logistics Environment.
Module 4: Systems Development Chapter 13: Investigation and Analysis.
ESRI Education User Conference – July 6-8, 2001 ESRI Education User Conference – July 6-8, 2001 Introducing ArcCatalog: Tools for Metadata and Data Management.
November 4, An Integrated Logistics Environment for an Effective Shipbuilding & Supporting Enterprise Prepared by: Dr. Burton GischnerElectric Boat.
1 ILE Project Integrated Logistics Environment Kickoff Meeting NPDI Project & SCIM Summary & Status Presented by: Rick Lobsitz (NGTS)
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
1 S HIP T ECH 2011 A S HIPBUILDING T ECHNOLOGIES I NFORMATION E XCHANGE Total Ownership Cost/Quality/Energy Efficiency Completion and Validation of the.
CHAPTER NINE Accessing Data Using XML. McGraw Hill/Irwin ©2002 by The McGraw-Hill Companies, Inc. All rights reserved Introduction The eXtensible.
Operating Procedures 1 Mimi Reis NSRP ILE Kick-off Meeting on June 17, 2010 Integrated Logistics Environment Technology Investment Agreement (TIA)
Corrective Action Programs. 2 HSEEP Homeland Security Exercise and Evaluation Program Provides a common exercise policy and program guidance that constitutes.
Chapter 9 Database Planning, Design, and Administration Transparencies © Pearson Education Limited 1995, 2005.
1 The XMSF Profile Overlay to the FEDEP Dr. Katherine L. Morse, SAIC Mr. Robert Lutz, JHU APL
How To Apply Quality Management
Requirements Analysis Scenes
DOCUMENTATION DEVELOPMENT LIFE CYCLE (DDLC)
Project Integration Management
IEEE SA IEEE LTSC.
Project Management Process Groups
Metadata The metadata contains
Presentation transcript:

1 ILE Project Integrated Logistics Environment Kickoff Meeting Subtask 1.2 Sharing Structural Design Data with Manufacturing Systems Presented by: Michael Olson

2 Objectives l Tools and Methods for Supporting Next Generation Shipbuilding IPDE (SCIM Evaluation) – –This task will demonstrate the capabilities of the NPDI SCIM as the means for supporting the next generation IPDE l Subtask 1.2 – Sharing Structural Design Data with Manufacturing Systems – –Apply tools and methods developed by ISE team to exchange structural design data between design and manufacturing systems – –Use the NPDI Ship Common Information Model (SCIM) as the basis for the exchange – –Validate and demonstrate the capabilities of the SCIM on a current program – –Recommend updates to SCIM

Participants l Northrop Grumman Shipbuilding Gulf Coast l Northrop Grumman Technical Services l Product Data Services Corporation 3

4 Overview l Address data sharing challenge in multiple shipyard development environment –Exchange of structural design data from prime designer to manufacturing, either in same shipyard or a second shipyard l Use the information requirements of the SCIM to guide the exchange of product data l Identify required structural manufacturing information to the data element level l Export data from the design environment l Import data into the manufacturing environment

SCIM l Use SCIM chapter based on STEP AP 218 (Ship Structures) as starting point l Include additional SCIM chapters as necessary, such as Product Data Management (PDM) l Augment SCIM chapters as necessary to include required manufacturing data 5

Manufacturing Data l Define required manufacturing data based on DDG 1000 activities to interface with Teamcenter Manufacturing l Analyze manufacturing data from the standpoint of a different manufacturing system, such as Electric Boat Quonset Point facility 6

7 Export from Design Environment l A translator will be developed to export structural design data from the DDG 1000 CATIA/Teamcenter Enterprise environment into a SCIM XML file l Data will be mapped to appropriate SCIM entities and attributes l Additional entities and attributes will be included based on analysis of manufacturing data requirements l Data will be evaluated for completeness and accuracy

8 Import into Manufacturing Environment l A translator will be developed to import structural design data in SCIM XML into the manufacturing environment –Use DDG 1000 Teamcenter Manufacturing environment as test case –Ensure data and exchange is not tied to specific manufacturing system l Imported data will be evaluated for completeness and accuracy in the manufacturing system

9 Validate SCIM l Deficiencies revealed in the SCIM related to Structural Design Data will be noted and corrected as part of Task 2 of the ILE Project l Recommendations will be made for improving SCIM usability, including completeness and clarity of SCIM descriptions l Attempt will be made during Task 2 to improve the format and content of the SCIM chapters to resolve observed issues

10 Subtask 1.2 Deliverables and Milestones MonthDeliverable 2Structural Model Import Requirements Report 5SCIM Gap Analysis Report 8SCIM Dataset Results Report 11Final Wrap-up Meeting, Import Results Report, SCIM Deficiencies and Recommendations

Report Definitions l Structural Model Import Requirements Report –Define structural design information required by manufacturing system l SCIM Gap Analysis Report –Compare SCIM with structural design information required by manufacturing –Identify and describe gaps in SCIM 11

Report Definitions (cont’d) l SCIM Dataset Results Report –Provide a description of the final dataset required for transfer from Design to Manufacturing –Note differences from current SCIM content l Import Results Report –Analyze the results of importing structural design data into manufacturing system using SCIM –Document issues related to SCIM data or structure as it relates to importing into the manufacturing system –Describe system-specific issues that may result from the analysis 12

Near-term Activities l Coordinate with DDG 1000 design, manufacturing, and IDE groups as needed l Define data exchange requirements between design and manufacturing systems l Analyze data exchange requirements against the appropriate SCIM chapters to identify gaps l Develop Structural Model Import Requirements Report 13

Backup 14

15 Generation of Mediator Software Mediator Generator Mapping from Sending IPDE to SCIM Mapping from Receiving IPDE to SCIM The Mediator Generator is a generic piece of software for each application area that reads the mapping tables for any two systems and creates a Mediator between those mappings A Mediator is an XSL stylesheet that reads a compliant XML file from the Sending System and produces an XML file that can be read by the Receiving System (XML Mapping File)

16 SCIM-compliant Part 28 File l If both systems support ISO (STEP XML) then a Mediator is not required l The IPDE shall be able to receive product model data in the same SCIM-compliant XML format for each of these application areas