Terje Andersen / Gavin Astin 29 September 2011 Assessment of measures Potential new measures, or extended scope of existing measures.

Slides:



Advertisements
Similar presentations
Pest Risk Analysis (PRA) Training
Advertisements

Basic Principles of GMP
The 4 T’s of Test Automation:
Chapter 24 Quality Management.
INTERNAL CONTROLS.
September 2013 ASTM Officers Training Workshop September 2013 ASTM Officers Training Workshop Membership & Roster Maintenance September 2013 ASTM Officers.
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Terje Andersen 06 May 2011 Analysis of past derailments Information from data bases, investigation reports and surveys.
Gavin Astin/ Terje Andersen 06 May 2011 Survey of Existing measures.
Regional Policy Common Indicators: Infrastructure Definitions and Discussion Brussels, 22 nd November
Gavin Astin 29 September 2011 Suggestions for Efficient Measures Short and Medium term.
Gavin Astin 06 May 2011 Study overview. Study Overview 06 May About DNV Independent foundation with around 9,000 employees. Det Norske Veritas.
Gavin Astin 29 September 2011 Study overview. Study Overview 29 September About DNV Independent foundation with around 9,000 employees. Det Norske.
Module N° 7 – Introduction to SMS
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Making the System Operational
Audit Risk Week 10.
Evaluating Provider Reliability in Risk-aware Grid Brokering Iain Gourlay.
ZMQS ZMQS
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
A number of very dangerous factors related to buildings, roofs, structures and properties have been identified and warned about.
Banking Services AVAILABLE FOR A SMALL BUSINESS. BANKING SERVICES 2 Welcome 1. Agenda 2. Ground Rules 3. Introductions.
MA Metal Finishing Forum Tools and Techniques for Optimizing Metal Finishing Process/Environmental MA Metal Finishing Forum Kevin L. Klink, P.E.
EMS Checklist (ISO model)
Vision: A strong and capable civil society, cooperating and responsive to Cambodias development challenges 1.
BLR’s Safety Training Presentations
Effectively applying ISO9001:2000 clauses 6 and 7.
Property Management Contract Oversight VDOTs Outsourced Safety Rest Area Program November 15, 2013 Maintenance Division.
The importance of the service catalogue to the service desk

Knowledge requirements for rolling stock maintenance TU Eindhoven – 19th of June 2007 by Bob Huisman NedTrain - Fleet Management.
Checking & Corrective Action
Record Keeping F OR A S MALL B USINESS. RECORD KEEPING 2 Welcome 1. Agenda 2. Ground Rules 3. Introductions.
1 Vince Galotti Chief/ATMICAO 27 March 2007 REGULATING THROUGH SAFETY PERFORMANCE TARGETS.
Squares and Square Root WALK. Solve each problem REVIEW:
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 27 Slide 1 Quality Management.
Lecture 8: Testing, Verification and Validation
2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
OHT 5.1 © Marketing Insights Limited 2004 Chapter 5 E-business Strategy.
Real Time Train SNCF. 1 Agenda Essentials Basic Model Applications Traffic density is getting very high in several networks and management.
European Rail Agency Workshop 29 th September 2011 (Lille) Dr Björn Paulsson (UIC) Dr Stephen Ingleton (Newcastle University) REDUCING THE OCCURRENCES.
Addition 1’s to 20.
Proactively Preventing Freight Wagon Derailment Innotrans | Berlin| 18 th September Dr Björn Paulsson (UIC) Grigory Kozyr(UIC) Gordana Vasic (NewRail.
25 seconds left…...
Week 1.
Internal Control and Control Risk
Ongoing Detector Issues A continuous investigation into the potential causes and possible solutions to the issue of high degrees of saturation being recorded.
We will resume in: 25 Minutes.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 30 Slide 1 Security Engineering 2.
Protection notice / Copyright notice Topic 1: The Inspired Bus Company © Siemens AG All rights reserved.
Streamlining rail operations with RFID Jarkko Miettinen Vice President of Sales, Confidex Radio frequency identification in rail operations.
October 2008 International Rail Safety Conference 2008 Denver, Colorado, USA.
Gavin Astin 06 May 2011 Survey of markets. Markets 06 May Survey of Existing Markets - Method  Definition: “An technical measures is a device.
HEAVY AXLE LOADS ON SHORT LINES AND REGIONAL RAILROADS Georgia Railroad Association 5 th Annual Transportation Conference 5 th Annual Transportation Conference.
INTRODUCTION 1 What word comes to your mind to describe “ The attempt by two objects to occupy the same space at the same moment in time”
Frequency analysis and scenario development
Mitigation matrices for derailment prevention Railway Days| Bucuresti| 8 th - 9 th Oct Theme [SST ] Development of the Future Rail System.
Changing risk in the liberalised rail freight market Ian Lake – Railway Safety Commission.
Detector Derailment Device (&) Frenado (Braking) Automatic Train
November, 10th 2011UEEIV Seminar1 Wayside Train Monitoring Systems at Bulgarian Infrastructure Manager (NRIC) - A Report on Experiences made in Zimnitsa.
HIGH SPEED RAIL ASSESSMENT NORGE
1 Address: UIC Safety Database (SDB) System and Results.
Track circuit reliability assessment for preventing railway accidents
Workshop on freight train derailments - Introduction -
Air Carrier Continuing Analysis and Surveillance System (CASS)
Presentation transcript:

Terje Andersen / Gavin Astin 29 September 2011 Assessment of measures Potential new measures, or extended scope of existing measures

Freight train derailment risk model 29 September 2011 Agenda 2 1. Background 2. Assessment Methodology 3. Measure Effectiveness

Freight train derailment risk model 29 September 2011 Measures Identification Consultation with railway industry. Network statements. Internet research. Additional input: - NSAs. - Suppliers. 3

Freight train derailment risk model 29 September Some Background and Novel Approaches Consultation: - More than 60 measures in our database. - In addition, many 100s / 1000s of national rules, company standards etc. - Different approaches in Member States, ranging from reliance on organisational measures through to fully integrated wayside detectors and continuous monitoring. Some extracts: - Balance on wagons to help identify loading errors. - Heat sensitive paints to help diagnose hot axle box conditions. - Registered loading inspectors / personnel. - Harmless infrastructure. Important longer term considerations: - Data and information sharing. - Telematics / wagon identification. Industry challenge is to find common ground for harmonisation amongst these different approaches.

Freight train derailment risk model 29 September Existing preventive measures to reduce Infrastructure caused derailments (1) Improved inspection routines: - Timely maintenance follow-up of inspection results. Upgrade weak infrastructure to match present axle loads: - Freight only lines are today used for loading conditions far exceeding their design standard. Stricter and more harmonised track geometry requirements to account for international traffic. Move signals which may show stop aspect away from track sections with geometry not suitable for low speed braking or acceleration, or adjust track geometry to train operating conditions. Examples: - Avoid signals that can show stop aspect behind small radius curves with high cant. - Alternatively redesign track geometry or install check rails.

Freight train derailment risk model 29 September Excessive track twist Picture shows a train on a track in UK that caused derailment due to excessive track twist. Track twist restriction area by draft TSI for Conventional Rail Infrastructure for curves with R< 420 m.

Freight train derailment risk model 29 September Existing preventive measures to reduce Infrastructure caused derailments (2) Greasing of track curves. Interlocking of points to avoid operation while occupied by rolling stock: - Mainly at stations and shunting yards. Increased separation of freight and passenger traffic along different lines and adjustment of track geometry design to most frequent traffic type. Apply maintenance free superstructure design e.g. fixed track/slab track.

Freight train derailment risk model 29 September Existing preventive measures to reduce Rolling stock related derailments Measures to avoid Hot Axle Box derailments: - Wheel load impact detectors to detect faulty wheels giving excessive vibration to bearing. - Improve bearing design by applying more vibration tolerant components in bearing. - Track installed detector installations to detect faulty bearings or hot axle boxes: - Hot axle box detectors. - Bearing acoustic diagnostic. Measures to avoid axle shaft fatigue ruptures: - Improved design standards. - Appropriate material selection. - Fault free surface corrosion protection. - Improved in service inspection in order to detect incipient failures. Appropriate greasing of bogie pivots and side supports. Apply improved suspension design, e.g.. parabolic blade springs instead of trapezoidal blade springs.

Freight train derailment risk model 29 September Rolling stock measures towards wheels and axles Exchange brass roller bearings with polyamide roller cages. Evaluate use of composite wheels vs monoblock wheels. European Visual Inspection Catalogue for Wheelsets

Freight train derailment risk model 29 September Existing preventive measures to reduce Operational related derailments Training of operational staff of all types. Proper inspection, testing and check of wagons, train prior to departure: - Improved tools to ensure quality of these activities, e.g. check lists. Improved tools to detect overloading, skew loading and/or insufficient fastened load: - Weighing devices at terminal or along track. - Visual balances on wagons. ATP-system to avoid SPADs and excessive speed across deviated points/turnouts.

Freight train derailment risk model 29 September Consequence Mitigation Measures

Freight train derailment risk model 29 September 2011 Agenda Background 2. Assessment Methodology 3. Measure Effectiveness

Freight train derailment risk model 29 September 2011 Assessment Methodology We have used qualitative basis for assessment if the following applies: - They generally offer only small benefit in comparison with other measures, and / or; - They form part of a suite or measures that can be integrated together (for example a number of measures identified associated with rolling stock maintenance can be integrated into a single measure), and / or; - There is insufficient data to enable a more detailed assessment and therefore there would be significant uncertainty in the results. Otherwise, measures are assessed on a quantified basis. Some measures are outside of the project scope and have not been considered. Accident causes and preventive measures that are already being addressed by other projects, such as (such as the Euroaxles project addressing axle shaft fractures) are also not considered. 13

Freight train derailment risk model 29 September Measures Assessed using a Qualitative Approach

Freight train derailment risk model 29 September Measures Assessed using a Quantified Approach

Freight train derailment risk model 29 September 2011 Quantified Assessment Parameters Considering Sliding Wheel Detectors, we identified about 8 derailments (handbrakes left on, etc.) that may be detected by these devices. (Existing controls are manual inspection, local rules and solutions). Is the benefit (potentially 8 avoided derailments) a good use of finite resources? On the one hand we need to consider the benefit and on the other the resources to secure that benefit. 16

Freight train derailment risk model 29 September 2011 Quantifying these Benefits (avoided Derailments) Each derailment has an impact in terms of: Potential loss of life; Operational disruption; rack damage; Wagon damage; Environmental events (contamination). 17 In addition, the cost model assigns monetised benefits associated with the value of preventing a fatality or injury (1.5 million & 200 k respectively). Environmental contamination costs about 1,000,000 per event. Therefore, preventing an immediately severe DG derailment that leads to loss of containment and three lives has a cost (at todays values) of: - (3 * 1,500,000) * (427,746) + 7 * (23,256) + 50 * (16,040) + 1,000,000 = 6,678,665.

Freight train derailment risk model 29 September 2011 Quantifying the Costs To our knowledge few Sliding Wheel Detectors installed installation (in Europe). Would require installation at major freight origin points – we estimated about 1,300 units would provide good coverage. Established the cost to purchase and maintain over measure lifetime. Is the investment worthwhile? 18

Freight train derailment risk model 29 September 2011 Some Data 19

Freight train derailment risk model 29 September 2011 Agenda Background 2. Assessment Methodology 3. Measure Effectiveness

Freight train derailment risk model 29 September 2011 Our Assessment of Derailment Risk Reduction Potential 21 A more comprehensive list of measures and benefits assessment is provided in our B2 report. Relates to damage reduction potential, not cost.

Freight train derailment risk model 29 September 2011 Discussion Assessment relates to the potential for improvement, given the existing status of measures deployed to prevent derailments. Biggest potential for improvement relates to addressing track geometry defects, improving hot axle box detection and wheel defects. Other areas we will consider on a qualitative basis are rolling stock maintenance. However measures that do not have such a large benefit can still be efficient if they are low cost. 22

Freight train derailment risk model 29 September End of Session - Any Questions

Freight train derailment risk model 29 September Safeguarding life, property and the environment