MIDDLE SCHOOL CONCEPT FOR THE RUTHERFORD SCHOOL DISTRICT.

Slides:



Advertisements
Similar presentations
Class Size Calculated by-school in , but scheduled to move to by-classroom in Calculated as of Friday, Date Certain, by period, during.
Advertisements

Averill Park Central School District Superintendents Budget Draft for for
February 16, Tonight’s Agenda  Review Assets and Challenges From Last Meeting  Review Necessary Assumptions  Look at Possible Considerations.
Moultonborough School District Budget FY15 Budget Draft Version 1 November 25, 2013.
1 Gifted and Talented Task Force Presentation to the Howell Township Board of Education March 29, 2006.
Welcome Class of 2018 to Ellington High School!
School District No. 73 (Kamloops/Thompson) Beattie School of the Arts – Pineridge Campus School District No.73 Facility Re-configuration Challenges and.
Jefferson Township Public School District DRAFT Proposed Budget Impact of Economic Climate & Changes in Funding.
Haverford Middle School 6 th Grade Orientation. Welcome Mr. Daniel J. Horan, Principal Ms. Elizabeth Mastrocola, 6 th grade administrator Mr. John Berardoni,
BOE Information Session Evolving Plan to Address Student Enrollment Challenges as of November 9, 2011.
1 Building Use Study Plattsburgh City School District Advisory Committee Meeting November 20, 2013 Castallo and Silky- Education Consultants Bill Silky.
Superintendent’s Recommendations for District Improvement Related to Facility Needs VICTORIA PUBLIC SCHOOLS.
Ellen Wolock NJ Department of Education Preschool Expansion in New Jersey NJASBO April 18, 2008 New Jersey Department of Education Division of Early Childhood.
Preregistration Meeting In-service for Middle School Principals and Counselors December 7, 2011.
School District Efficiency Study Morrisville-Eaton Central School REVIEW OF REPORT October 15, 2014 Castallo and Silky Education Consultants
POSTER TEMPLATE BY: RTI Schedule: A Proposal to Implement a New Schedule Cathy Poppen, Oregon City School District, Ogden Middle.
School District Efficiency Study Morrisville-Eaton Central School District Advisory Committee Meeting REVIEW OF DRAFT REPORT SEPTEMBER 17, 2014 Castallo.
Review the administrative team findings in regard to the recommendation with our two smaller schools at Lincoln Park and West Wyomissing. Review and explain.
WELCOME TO HOLLOWAY! Scheduling Presentation.
© 2013 K12 Insight Central Office Climate Survey Results Las Cruces Public Schools March , 2013.
7 TH GRADE SPRING CONFERENCES 2015 How is it going? Registration Assessment Scores Scantron Readiness Rubric Supporting your Child Targeted Services and.
Rising 6th Grade Scheduling Information
Elida Board Of Education Meeting Superintendent's Report March 19, 2013.
“ Let’s Bond Together ” Issue 3 Expect….Believe….Achieve.
LOCKPORT CITY SCHOOL DISTRICT Washington Hunt Elementary School Michelle T. Bradley Superintendent of Schools Deborah Coder Assistant Superintendent for.
New Configuration Public Hearing May 15, 2008 Superintendent Terry E. Shoemaker.
SCHOOLS. School Budgets WJCC School Budget Spending ($1,000s) FY2014 FY2013 Operating Budget$ 115,877$ 112, % Grants 4,993 5, % Food Service.
Walkerton Accommodation Review April 24, 2008 The following most recommended scenarios were reviewed by the Accommodation Review Committee.
Reduction in Certificated Staff For Tahoe Truckee Unified School District.
1 District 833 Middle School Transition Committee Spring 2008.
Demographic Advisory Committee Thomas BarryRebecca Kalagher LeAnn BeaulieuBonnie Mazzoli Maureen BrennanTimothy Neville Daniel CooganJennifer Rancourt.
Brookings School District All Day Kindergarten Update Presentation Contains Projected Data.
High School Schedule Notes for School Board Meeting
Ridgefield School District Capital Facilities Plan March 9, 2010.
Welcome Reception Presentation Superintendent Erin Nation Enid Public Schools.
MOHAWK TRAIL REGIONAL SCHOOL DISTRICT 2012 STATE OF THE DISTRICT ADDRESS Presented by: Michael A. Buoniconti Superintendent of Schools Mohawk Trail Regional.
Grade 7-8 Educational Options Study, 2015 Key Study Findings and Next Steps October 2015.
Kansas School Nutrition and Physical Activity Survey, 2006 Obesity Task Force Topeka, Kansas October 24, 2006 Kim S. Kimminau, Ph.D. Kansas Health Institute.
Welcome 9 th Grade Campus Discussion. Questions/Communications  Question/Suggestion Cards  Information on YCS website and publications
SCHOOL BUDGET PRESENTATION K – 8 Education 1 Paul Perzanoski March 21, 2012.
Financial Update and Impact Pinconning Area School District January 2010.
General Fund – regular operating costs of the district Associated Student Body Fund – student activities Debt Service Fund – repayment of bonds Capital.
Shelton School District Replacement Levy This is not an additional levy. The levy rate is projected not to exceed $3.32 per $1,000 of assessed valuation.
Community Levy Information Meeting Coming Together for Kids! January 13, 2016.
In FY the District Faced a $2.6 Million Dollar Reduction  SUMMARY OF REDUCTIONS  36.5 staff positions (5+%)  Elementary foreign language 
Questions and Answers Howland Reconfiguration School Year.
Kansas College and Career Readiness Curriculum Sub-Committee Members Dr. David Conrady Carlos Gomez Jody Winfrey Jennifer Siverstein Lynne Ruschill.
Early Childhood Feasibility Study Presented by Early Childhood Feasibility Committee Members Eileen F. Swan, parent Amy Lupoli, parent Alisa Ruggiero,
Student Reassignment Analysis for the Lexington Public Schools Project Introduction & Update for the LPS School Committee February 2, 2016.
Wahoo Public School District Facility Planning Update April 18, 2016.
DLS Town Hall. Facilties and Transportation Update History Current Status Near Term and Medium Term Projects Questions & Answers.
Start Time Task Force Considerations Survey & Transp. Update
Reducing the FY17 Preliminary Budget Presentation Series for FY17 Budget #6 School Committee Meeting April 26, 2016 Educational Support Center PDC 7:00.
Budget Overview March 27, K – 3 Elementary Maintains small class sizes (19-22 students per class) Maintains current level of teaching assistants.
GRANBY SUMMER PROGRAMMING Summer School Review and reinforcement of Math and/or Language Arts skills for students entering 1 st through 8 th grade.
SCHOOL #1 BALLOT QUESTION AND PROPOSAL Fall, 2016.
Springboro Junior High School
Sebago Elementary School Withdrawal Committee
High School study space committee report
UPDATE: 8/8/2011 Batavia City School District
Sullivan West Central School Proposed Instructional Services Budget
School #1 Ballot Question and Proposal
Previewing the school year
Middle School Course Selection
Referendum Discussion
Summer Learning Update 2013
Pillager Public School District Community Survey Results
Parent Superintendent Council January 15, 2019
Transportation Study Newark BOE 5/6/2019.
Houston K-8 School Enrollment Information Report
Presentation transcript:

MIDDLE SCHOOL CONCEPT FOR THE RUTHERFORD SCHOOL DISTRICT

TO HAVE A GRADE 7-8 MIDDLE SCHOOL FOR THE SCHOOL YEAR The Middle School would be at Union School. Washington, Lincoln, and Pierrepont would be 1-6 schools. The K-Center and the High School would remain as currently organized.

HISTORY The district had a “Junior High School “ for grades 7-8 until the school year. At various times (1999, 2002, 2013) the concept of a middle school has been explored. In , a survey of the community indicated support for a Middle School concept but not for a referendum to add the space needed for a 6-8 Middle School at Pierrepont. The lack of an auditorium, cafeteria, and adequate size gym would require construction at that site. Increased enrollment in Pierrepont in would require an additional portable classroom or the relocation of students.

HISTORY In , a committee was formed to determine if a middle school could be created without the need of a referendum. The lease/purchase of modular units was considered. Since Union School had a larger multipurpose lunchroom and an auditorium, it was chosen as a possible site for the 6-8 middle school. In order to meet the needs of grades 6-8 students at Union School, six modular classrooms and a multi- purpose room would need to be acquired. The estimated cost is $5.9 million dollars. This amount of money would be difficult, if not impossible, to manage within the budget

THE BENEFITS OF A MIDDLE SCHOOL FOR RUTHERFORD There would be greater focus on the appropriate developmental needs of the students. The guidance counselor and SAC can more effectively address middle school issues. Electives, including STEM and the arts, will be dramatically increased. World Language teachers will no longer have to travel between schools, making the scheduling of those courses and the availability of the teachers for extra help more effective. Art and music can be scheduled more effectively.Instrumental music and choir can be part of the normal school day.

THE BENEFITS OF A MIDDLE SCHOOL FOR RUTHERFORD Health and PE classes can be taught in a similar manner as at the high school where students take PE classes five days a week for three quarters of the year and health for one quarter. Nurses would no longer need to teach health classes. Depending on the “bell schedule” chosen, math can be a 60- minute block (what “Math in Focus” requires). A stronger co-curricular program (clubs, the arts, athletics) can be developed.

THE DILEMMA To create a 6-8 school at Union would cost nearly six million dollars. To create a 6-8 school at Pierrepont would cost nearly sixteen million dollars (estimate in 2013). The enrollment in Pierrepont in will create an overcrowding condition. The benefits of a middle school are documented in research.

THE SOLUTION A grade 7-8 Middle School at Union School There would be no need for additional space since the total number of students in the building would be less than the current enrollment. The 7-8 Middle School is done in many districts including Hackensack, Nutley, Secaucus, Midland Park, Cliffside Park, West Essex, Belleville, New Providence, and Roxbury.

THE SOLUTION Washington, Lincoln, and Pierrepont would be 1-6 schools Grade six students would have another year before transition to a departmental schedule. Current enrollment in those three schools is Projected enrollment in is The schools can accommodate this increase since Pierrepont will not be following a departmental schedule. There will be room for a Pre-K disabled class.

PROJECTIONS/CAPACITY Lincoln and Washington each have 14 classrooms Run two sections per grade level Two extra rooms can be used for OT, PT, G&T, Targeted Reading, RTI, ESL, possible Preschool

PROJECTIONS/CAPACITY Pierrepont has 26 classrooms Run four sections per grade level Two extra rooms can be used for OT, PT, G&T, Targeted Reading, RTI, ESL, possible Preschool

PROJECTIONS/CAPACITY Projections students average 24.2 students for 48 sections students average 24.3 students for 48 sections students average 23.9 students for 48 sections students average 23.6 students for 48 sections

PROJECTIONS/CAPACITY Union School projected enrollment as a 7-8 School students students students students Current enrollment as a 4-8 school is 484 students.

TRANSPORTATION The furthest point from Union is 2.3 miles. Students living beyond 2 miles are entitled to be bused.

TRANSPORTATION Once those students are bused, the district would have to bus students who attend private schools more than 2 miles away from elementary and middle schools and 2.5 miles away from their high school. Either a bus route needs to be provided or the parents would be reimbursed $882. The state provides a small percentage of funding. We are estimating that we would have 39 eligible students this year at a district cost of $34,398, minus any state reimbursement.

TASKS TO COMPLETE Decide on a bell schedule Determine certificated staffing needs based on required staff and certifications Determine support staff needsDetermine administrative staffVerify that Union is the better choice for a middle school

TASKS TO COMPLETE Geographically realign district for the 1-6 schoolsResearch transportation costs for private school studentsConfirm enrollment projections Develop a needs assessment of any equipment and materials needed and the cost of moving items from school to school Visit grades 7-8 schools in their areaSimultaneously make a decision regarding preschool

TIME LINE May 21— Superintendents Roundtable June 15—Update to BOE Sept 14—Final Report/Proposal to BOE

MR. JOHN J. HURLEY SUPERINTENDENT OF SCHOOLS